This is an HTML version of an attachment to the Freedom of Information request 'Tyne and Wear Metro in Washington'.
PROJECT ORPHEUS 
 
Options for Corridors Considered 
 
Unsuitable as Metro Extensions During 
Phase 1A of Project Orpheus 

Final Report 
 
May 2003 
 
 
Prepared for: 
Prepared by: 
 
Nexus  
Steer Davies Gleave 
Nexus House 
1 York Place   
St.James' Boulevard 
Leeds   
Newcastle upon Tyne 
LS1 2DR 
NE1 4AX 
 
[t] +44 (0)113-242 9955   
[i] www.steerdaviesgleave.com
JacobsGIBB 
1270 Century Way 
Leeds 
LS15 8ZB 
[t] +44 (0)113 204 4567 
 

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

1. OVERVIEW 
 
1.1 
This note is intended to summarise the information collected, and conclusions drawn, 
during the Phase 1A Option Sifting stage of Project Orpheus. An update will also be 
produced at the end of Phase 1B. It is intended to inform future scheme development 
within the Local Transport Plan (LTP) process.   
1.2 
A total of twenty-nine corridors were examined during the initial stages of Project 
Orpheus to establish their potential suitability for Metro Extensions. These corridors 
were developed from strategic travel markets identified by stakeholders. 
 
Recommendations for each of the corridors/routes are summarised in Table 1.1, 
showing the stage within the sifting process at which the conclusions were drawn. At 
the end of Phase 1A, a total of 18 corridors/routes (out of the total of 29) were 
considered unsuitable as Metro extensions, as follows:  

13 corridors at the end of the Phase 1A Corridor Selection (3, 4, 7, 11, 13, 14, 16, 
17, 18, 20, 24, 27 and 29)  

routes at the end of the Phase 1a Route Selection (10, 15, 22, 25 and 26) 
1.3 
This leaves eleven routes to go forward as possible Metro extensions (1, 2, 5, 6, 8, 9, 
12, 19, 21, 23 and 28) to be evaluated in more detail during Phase 1B. 
1.4 
Many of the 18 corridors/routes rejected as Metro Extensions have the potential to 
become key public transport corridors using modes other than LRT. The Orpheus 
consultancy team recommends that public transport improvements be developed 
further as parallel studies in the context of delivering the LTP objectives and 
strategies.   
1.5 
It should be emphasised that the note discusses options with the underlying 
assumption that public transport needs improving on all of the key public transport 
corridors identified. The transport case for the suggested options, encompassing 
indicators such as value for money, has not yet been assessed.   
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
1

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of Project Orpheus
TABLE 1.1
SUMMARY OF RECOMMENDATIONS AT THE END OF PHASE 1A
Strategic Travel Market
Corridor
Phase 1A
Phase 1A
Into
Possible way forward
Corridor
Route
Phase
Selection
Selection
1B Sift
A) Sunderland urban area
1 Sunderland-Seaham via coast
3
Orpheus
2 Sunderland-Ryhope via Doxford Park
3
Orpheus
3 Sunderland-Seaham via Houghton
3
Superoute subject to partnership agreement
B) Sunderland – Washington
4 Sunderland-Washington via Doxford
3
Superoute subject to partnership agreement (note
corridor
Park
partly included in Orpheus Corridor 2)
5 Sunderland - South Hylton-Washington
3
Orpheus
6 Sunderland-Southwick – Washington
3
Orpheus
C) Washington area
7 Washington- Chester-le-Street
3
Superoute subject to partnership agreement
D) Washington – Gateshead/
8 Washington- Gateshead via Wrekenton
3
Orpheus
Newcastle corridor
9 Washington Gateshead via Team Valley
3
Orpheus
10 Washington-Gateshead via Pelaw
3
Metro Complementary Route
11 Washington-Gateshead via Usworth
3
Existing Superoute link to Heworth
E) South Shields interurban
3
Metro Complementary Route (build on
15 South Shields-Washington
corridors
recommendations of Coalfields Job Link study)
12 South Shields-Sunderland via Boldon
3
Orpheus
F) South Shields urban area
13 South Shields-Marsden
3
Superoute subject to partnership agreement
14 West Harton-Marsden
3
Superoute subject to partnership agreement
G) Rural Gateshead to
16 Stanley – Metro Centre
3
Superoute subject to partnership agreement
Gateshead/ Newcastle
17 Rowlands Gill-Metro Centre
3
Superoute subject to partnership agreement
18 Prudhoe-Gateshead
3
Rail enhancements on Tyne Valley Line
H) W. Gateshead urban area
19 Metro Centre Gateshead
3
Orpheus (possible link to Route 21)
I) Outer Newcastle
20 Metro Centre –Airport
3
Superoute subject to partnership agreement
J) Inner Newcastle
3
Orpheus (with possible extensions to
21 Newcastle –Denton
Walbottle/MetroCentre)
28 Walker area
3
Orpheus
29 Link between 28 and 23
3
Superoute subject to partnership agreement
K) Newcastle Great Park
22 Newcastle –Airport via Great North
3
Metro Complementary Route – alignment in Great
Routes
Park
North Park protected
3
Superoute subject to partnership agreement and
24 Airport-North Shields
corridor 26 development
L) Cramlington/ Killingworth
3
23 Four Lane Ends –Cramlington
Orpheus
to Newcastle
M) Ashington to Newcastle
3
Possible rail enhancements to Ashington, Blyth &
25 Ashington-Newcastle
Tyne route
N) North Tyneside routes
26 Stephenson’s Link
3
Metro Complementary Route to commence 2004
27 Newcastle-Whitley Bay
3
Superoute subject to partnership agreement
Totals
13
5
11
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc
1

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

2. 
NOTES ON THE 13 CORRIDORS REJECTED AT THE END OF THE 
PHASE 1A CORRIDOR SELECTION PROCESS  

2.1 
These recommendations take into account the Superoute (Phase One) network which 
is currently being implemented (see Figure 2.1). Superoutes aim to deliver frequent, 
high quality services along key routes offering:  

frequent services – 7am until midnight 7 days a week (9am Saturdays, 9.30am 
Sundays); 

quicker journeys – bus priority measures are being implemented along routes; 

quality vehicles – low floor, ‘Easy Access’ vehicles which are simple for people 
with wheelchairs and buggies to use. Superoute buses are all under 7 years old 
and will be compliant with Euro II emissions standards by 2004; 

high quality infrastructure – aim to repair bus stops and shelters within 5 days and 
have modern shelters at 90% of stops by 2006; 

good information – bus timetables will not change more than once a year and up 
to date timetables will be displayed at every bus stop.  
2.2 
Over the past few years, NEXUS have been developing the concept of Metro 
Complimentary Routes on some key public transport corridors. These studies have 
been included in the consideration of suitable route improvements. They are seen as a 
clearly defined upgrade to existing services with a more significant infrastructure cost 
to enable a higher degree of segregation and interchange to: 

Provide fast limited stop branded services with quality interchange and halt 
facilities linking key centres; 

State of the art accessible vehicles; 

Dedicated routes with a high degree of segregation, priority over other traffic and 
the perceived permanence of railway systems; 

Fully disability friendly; 

Halts and interchanges which a re safe and secure, have real time passenger 
information systems and ticketing systems comparable with Metro; 

Focused park and ride connections. 
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
1

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

FIGURE 2.1 
THE SUPEROUTE NETWORK – PHASE 1  
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
2

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

Corridor 3: Sunderland – Seaham via Houghton-Le-Spring 
Conclusion from the Corridor Selection Table 
Recommendation 
Not recommended as an LRT corridor.   
Alternative to Corridor 1 & 2 
Quality bus route recommended, Possibility of some segregated bus 
way but limited opportunity for bus priority on existing highway system. 
Link with Metro/LRT in Sunderland and heavy rail/LRT in Seaham. 
Reasons 
High cost and difficulties accessing Metro at Sunderland 
Seaham & Sunderland better linked by rail (currently 2tph in AM peak) 
(Corridor 1) 
Sunderland to Doxford Park picked up by Corridor 2  
Improving the bus services linking Hetton-le-Hole and Houghton-le-
Spring to Sunderland would assist the current problems of social 
exclusion. Possibility of introducing priority measures/segregation in 
corridor. This bus option could be in place quickly to cater for expanding 
local population. 
2.3 
The Sunderland to Doxford Park section forms part of Corridor 2.  Corridor 1 provides 
a link between Seaham and Sunderland which would parallel the existing heavy rail 
route. As a result, only the section of Corridor 3 serving Houghton-le-Spring, Hetton-
le-Hole and Murton is not covered by Corridors 1 or 2, both of which have been taken 
forward for more detailed analysis during Phase 1A.   
2.4 
There is limited congestion through these three towns at peak periods and therefore 
the provision of bus priority measures are unlikely to have a significant impact on 
running times or reliability. It is recommended that a Quality Bus partnership be 
considered which could encompass services linking the three towns with the centres of 
Seaham and Sunderland and integrated with nodes on the future Orpheus network.  
2.5 
These links are partially served by two Superoutes: 

Superoute 35: South Hetton - Easington Lane – Hetton-le-Hole – Houghton-le-
Spring – Doxford Park - Sunderland - South Shields 

Superoute 222: Durham – Houghton-le-Spring – Sunderland; 
2.6 
Future expansion of the Superoute network could link into the rail station at Seaham 
and via the new retail and leisure development at Dalton Park in Murton.  
2.7 
Further work should focus on: 

Development of the quality infrastructure and priority elements of Superoutes 35 
and 222 

Examine the feasibility of a Quality Bus partnership on routes from Seaham to 
Hetton-le-Hole via Murton and integration/interchange with  Superoute 35, as 
part of a overall network improvement. Given the semi-rural nature of the route 
but potential for regeneration, the service frequency and bus stop quality may be 
improved over a period of time to make it cost effective. 
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
3

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

Corridor 4: Sunderland – Washington via Doxford Park 
Conclusion from the Corridor Selection Table 
Recommendation 
Not recommended as an LRT corridor.   
Improved local bus service access an option for consideration 
Corridors 5 & 6 serve a similar function, but perform better. Recommend 
a combination of Quality Bus Route and possibly Guided Bus (along the 
dual carriageway section) 
Reasons 
High cost - longer route than 5 or 6 and through lower population 
densities.  
Significant new structure across River Wear required· 
Journey time not competitive with existing bus link · 
Social inclusion key motivation for linking Washington to Sunderland, 
but Corridors 5 & 6 better address social exclusion and form a more 
direct service into Sunderland. 
2.8 
The Sunderland to Doxford Park section of this corridor forms part of Corridor 2.  
More fundamentally, Corridors 5 and 6 provide for the strategic ‘missing’ link 
between Sunderland and Washington and these routes have been retained and taken 
forward for more detailed analysis during Phase 1A.  
2.9 
The alignment of any bus based system would be more indirect than a cross-country 
LRT route. The section through New Herrington and Shiney Row would use the 
B1286. This is single carriageway road with limited opportunity for traffic 
management based priority measures but possibility for marginal widening for bus 
lanes or laybys on some stretches. However, the Corridor 4 between New Herrington 
and Washington, via Washington Highway, can use this four-lane carriageway, which 
provides potential for the provision of guided bus or dedicated bus lanes, although 
with implications for peak hour highway capacity.  This section of the Corridor is not 
easily accessed from residential areas so no bus stopping facilities are envisaged.  
Therefore, this route will only be suitable if a non-stop section of guideway provides 
for local patterns of demand. However considering the overall route, the expense of 
the guided bus infrastructure may not be viable for the journey time saving achieved 
due to the potential slow run times on the remainder of the route. 
2.10 
The Superoute network really does not provide for links between Sunderland and 
Doxford Park and on to Washington.  Users are required to travel on Superoute 194 
between Washington Galleries and Houghton-le-Spring, and then interchange to catch 
either the Superoute 222 direct to Sunderland or the Superoute 35 to go via Doxford 
Park.  
2.11 
Further work should focus on: 

The practicality and viability of achieving segregation and priority on the Shiney 
Row to Doxford Section 

The viability of a through route against the provision of a more local bus link 
interchanging with Superoutes 222 and 35, and interchange facilities. 

The viability of priority alignment for bus on Washington Highway. 
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
4

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

Corridor 7: Washington – Chester-le-Street 
Conclusion from the Corridor Selection Table 
Recommendation 
Not recommended as an LRT corridor.   
To be taken forward as possible extension to Corridor 10. 
Recommendations include a segregated busway along the disused 
railway line and Quality Bus routes into Chester le Street (with bus 
priority where possible). 
Reasons 
Serves few key public facilities 
Chester-le-Street served by heavy rail to/from Durham/Newcastle.  
Low demand between Chester-le-Street and Washington 
Relatively low levels of social and economic deprivation 
Difficult to cross A1 and relatively little advantage over bus option 
Improved bus services could be taken forward which could link Chester-
le-Street and Birtley and Birtley and Washington.  
2.12 
Washington and Chester-le-Street could be linked by a segregated busway running for 
3km east-west between North Road/Durham Road and the Washington Highway, 
taking the route of the former railway. This link is currently used as a cycle route and 
footway and careful consideration would have to be given to retaining the uses within 
the design and the overall environmental impact.   
2.13 
The Washington Highway is a dual carriageway route which could incorporate bus 
lanes or guided bus. This would offer a fast link between the former rail route and the 
centre of Washington at the Galleries Bus Station. North Road is a wide single 
carriageway route for the majority of this length, with significant frontage access. 
However on some stretches bus lanes could be provided and together with priority 
measures at junctions. Within Chester-le-Street there are a number of semi-
pedestrianised areas which incorporate buses and which could act as a terminus to the 
bus link.  
2.14 
Washington and Chester-le-Street are poorly linked on the Superoute network.  Users 
would have to change at either Gateshead or Houghton-le-Spring.   
2.15 
Further work should focus on: 
• The feasibility of a bus way along the old railway line and the connections to the 
highway at each end. This would include providing for the pedestrian and cycle 
routes and the impact on adjacent residential areas. 
• The practicality of bus priority measures along North Road into Chester-le-Street 
town centre. 
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
5

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

Corridor 11: Washington – Gateshead via Usworth 
Conclusion from the Corridor Selection Table 
Recommendation 
Not recommended as an LRT corridor.   
Alternative to Corridor 10  
Recommend a Quality Bus Route from Heworth as a more appropriate 
technology. 
Reasons 
Alternative to Corridor 10 (via Pelaw)  
Journey times faster via Corridor 10 
Corridor 10 enables interchange with Corridor 6, flexibility to route via 
the Strategic Site and interchange with the Leamside Line and a new 
station (with P&R) on outskirts of Washington.  
2.16 
Corridors 8 and 10 have been identified as having potential to provide an LRT link 
between Washington and Gateshead.  In the longer term, pursuing Corridor 11 as a 
parallel bus link would only be an option if it serves local needs rather than strategic 
needs.  In the short term, it might be an option for a bus link in advance of the 
implementation of Orpheus.  
2.17 
This link is poorly served by the Superoute network at present. Superoute 194 links 
Washington to Heworth with a maximum 20 minute frequency service.  Users would 
have to either interchange with Metro at Heworth or take the Superoute 57 north to 
Gateshead/Newcastle, which has a maximum 10 minute frequency.  
2.18 
In general, the route would use local access roads with only limited potential for bus 
priority measures along Northumberland Way, where traffic congestion can create 
problems at key junctions during peak periods 
2.19 
Further work should focus on: 

The viability of a new bus link before any Orpheus routes are implemented. The 
route assessment needs to maximise priority and the potential interchange with 
other local services; 

Evaluation of interchange facilities (and potential penalties) with the Superoute 
network. 
Corridor 13: South Shields to Marsden  
Conclusion from the Corridor Selection Table 
Recommendation 
Not recommended as an LRT corridor.  
Recommend that access improvements to South Shields and 
neighbouring Metro stations be examined from wider residential 
catchment. There is limited opportunity for bus innovation, but Quality 
Bus Initiatives should be introduced where possible.  
Reasons 
Potentially-severe environmental impacts 
Does not serve major transport flow, but rather links residential areas 
Difficult to provide through services to areas beyond South Shields 
Much of catchment already served by Metro 
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
6

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

2.20 
The proposed route provides a local bus connection to the town centre along local 
roads. There is a potential for improved bus priority through bus gates and lanes on the 
approaches to the town centre, together with improved boarding, passenger 
information and shelter facilities and the use of quality low floor vehicles. However 
significant lengths of bus lane or bus way are limited, except along the Coast Road, 
where there may be potential environmental impacts. 
2.21 
Further work should focus on: 

The viability of integrating a new route into the existing bus network on the basis 
of a quality initiative approach and relatively close headway service; 

Improving priority access for buses on the approach to the town centre. 
Corridor 14: West Harton to Marsden 
Conclusion from the Corridor Selection Table 
Recommendation 
Not recommended as an LRT corridor.  
Recommend a Quality Bus Route with priority (where possible) to link in 
with the bus route recommended for Corridor 13.  
Reasons 
Only full street running alignment possible, thus the benefits of LRT and 
likely to be less than a bus-based system  
2.22 
There are a number of local bus services which penetrate the residential areas within 
South Shields and which serve local movements.  There is limited possibility to 
provide bus priority along these residential streets, but they are not particularly 
congested.  Additionally allowance has to be made for parking and servicing, leading 
to relatively poor journey times at times. It is suggested that local improvements to the 
existing services and facilities are considered to promote further use of these routes.  
This route is not picked up by either the first or second phase of the Superoute 
network.  
2.23 
Measures to be considered could involve revising the traffic management network 
locally to focus key traffic flows away from bus routes. At Harton, it may be possible 
to create a degree of segregation through local bus ways in verges and through the 
existing development areas. 
2.24 
Further work should focus on: 

A route study to examine the degree to which improved journey times could be 
achieved and the potential economic benefits. 
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
7

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

Corridor 16: Stanley – MetroCentre 
Conclusion from the Corridor Selection Table 
Recommendation 
Not recommended as an LRT corridor.   
Bus priority measures not likely to be required 
Reasons 
High cost and likely low demand  
Major alignment problems due to topography 
New bus services could link Whickham and the MetroCentre/Gateshead 
and Stanley and the MetroCentre/Gateshead (which could be 
introduced as part of the redevelopment of Stanley bus station, access 
to Gateshead via Centrelink busway) 
2.25 
The routes between Stanley and the MetroCentre via either Whickham or Lobley Hill 
are low standard single carriageway routes that provides few opportunities for the 
provision of bus priority. There are also no realistic opportunities for the provision of 
off road routes due to the topography of the area. Any such facilities may be expensive 
and are unlikely to be cost effective. Additionally there is little adjacent development 
for most of the route between Stanley and Whickham. In any case, the level of 
existing traffic flow is unlikely to justify segregated bus way facilities. 
2.26 
It is therefore recommended that a Quality Bus partnership approach is considered for 
residential areas. This could include the provision of accessible shelters, passenger 
information systems and dedicated low floor buses.  
2.27 
Improving the quality of life for the former mining community of Stanley is a priority 
for the County Council. The ward of South Stanley is ranked as the 160th most 
deprived ward out of a total of over 8,000 wards nationwide.  A recent study for 
English Partnerships and Derwentside District Council found that: 

action was needed to maintain the vitality and viability of the town centre.   

the lack of commercial attractiveness of many bus routes for journeys to work 
means that the district is served by a relatively weak public transport service 

there is a particular need to enhance public transport provision to major 
employment sites, such as Tanfield Lea Industrial Estates.  
2.28 
Measures suggested by the consultants include relocation of the bus station to make it 
more accessible from the town centre, improved priority for buses on the town centre 
approaches and upgraded public transport services. The latter solution may not be 
simple: an enhanced bus service to Gateshead/Newcastle must be viewed as a ‘two 
way road’ and thus may do little to maintain the vitality and viability of the town 
centre.  
2.29 
Further work should focus on: 

The viability of a new limited stop bus link, taking account of the economic 
viability of the area and potential patronage. 

Evaluation of possible new central town centre bus station, possibly integrated 
with development. 
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
8

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 


Improvement to the local bus network to improve interchange with out of area 
services. 
Corridor 17: Rowlands Gill - MetroCentre 
Conclusion from the Corridor Selection Table 
Recommendation 
Not recommended as an LRT corridor.   
Suggest investigating the potential for a segregated busway along the 
disused rail line, but environmental concerns would need to be 
addressed.  
Reasons 
High cost & low demand 
Potential major environmental impact 
Structural & land issues in crossing A1 and adjacent commercial area 
Problems linking to Gateshead Metro 
New bus services proposed to link Rowlands Gill and the 
MetroCentre/Gateshead , access to Gateshead via Centrelink busway 
2.30 
A dismantled railway line runs between Rowlands Gill and the MetroCentre adjacent 
to the River Derwent.  This is currently used as a leisure trail (and is part of the coast 
to coast - C2C - national cycle route) which passes through Derwent Walk Country 
Park and alongside Thornley Woodland Centre  
2.31 
This route could provide an opportunity for a segregated bus link between the two 
areas, which would link Rowlands Gill to the MetroCentre as well as the existing rail 
network and possible future Orpheus routes to the MetroCentre. This could provide a  
relatively high-speed link between the two areas with limited interaction with any 
congestion on the parallel road network.  However, the potential impact on the 
environment and existing use as C2C cycle route, the safety interface with other 
modes and the low population densities along its length means that this corridor has 
been deemed unsuitable for LRT and will create some of the same problems for bus 
based technology..  
2.32 
The Superoute network does not serve Rowlands Gill.  The low population densities 
and the high levels of car ownership in the local area may not provide sufficient 
patronage for this corridor to become a Superoute network. However, officers at 
Gateshead Council have identified this as a strategic travel market that needs 
addressing, so it is our recommendation that the route should be examination further 
as a quality corridor.  
2.33 
Further work should focus on: 

The viability of a new relatively frequent Lockhaugh Road (A694) service, 
together with traffic management based priority measures at key junctions 
between the outskirts of Blaydon and the MetroCentre. 
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
9

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

Corridor 18: Prudhoe – Gateshead  
Conclusion from the Corridor Selection Table 
Recommendation 
Not recommended as an LRT corridor.   
Main access provided by existing rail route, and improvements to rail 
services and additional stopping services would make better use of 
existing rail facilities. This route is already a Quality Bus route.  
Reasons 
High cost & low demand  
long journey times 
Parallel heavy rail service 
Bus route could access Gateshead via Centrelink busway. 
2.34 
Prudhoe is served by a heavy rail line which provides an hourly service (2tph in am 
peak, 3tph in the pm peak) to Newcastle City Centre via Wylam and the MetroCentre. 
However, there is no direct rail link between Prudhoe and Gateshead. However there 
is the potential of interchange to the limited stop bus from MetroCentre to Gateshead. 
2.35 
The Superoute network does not extend out to Prudhoe. The major residential 
population between the two areas is Crawcrook.  Crawcrook is well served by a 
Quality Bus route, with high Quality Buses, shelters and passenger information 
systems.  Park and ride makes use of these bus services and operate from the west of 
Crawcrook. 
2.36 
 Further work should focus on: 

The potential for extending the bus service to Prudhoe to establish acceptable 
journey times, balance with local accessibility; 

Potential for improving rail/bus interchange at the MetroCentre it terms of 
timetabling, fare regimes etc.  
Corridor 20: MetroCentre – Newcastle Airport  
Conclusion from the Corridor Selection Table 
Recommendation 
Not recommended as an LRT corridor.   
Recommend a Quality Bus Route to Kingston park only (Option C) with 
bus priorities.. 
Reasons 
Alternatively, consider partial (cross river) extensions of Corridor 21  
2.37 
The southern end of this between Scotswood and the MetroCentre has been combined 
with Route 21 providing potential for a link between St James and the MetroCentre. 
2.38 
The northern part of the route through Denton, Cowgate and up to Kingston Park is 
located on wide single and dual carriageway roads that have significant opportunities 
for localised bus priority measures to enable buses to avoid the significant congestion 
that can occur.  
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
10 

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

2.39 
A Quality Bus Route should be  considered connecting the MetroCentre to Kingston 
Park, via the Scotswood Bridge. This would enable interchange with the existing 
Metro and rail services and any potential Orpheus routes at either end of the route.  
The route should include bus priority where time saving benefits can be obtained, 
together with accessible bus stops with passenger information and liveried route 
specific buses.  
2.40 
Further work should focus on: 

The potential for a Quality Bus route and the viability of a number of traffic 
management and minor highway measures to improve priority and segregation, 
especially at key junctions. A significant proportion of this route is the subject to 
congestion at peak periods. 

Assessing the interchange improvements required with Metro, heavy rail and 
other key bus services. 
Corridor 24: Airport – North Shields 
Conclusion from the Corridor Selection Table 
Recommendation 
Not recommended as an LRT corridor.   
Recommend that Corridor 26 (Stephenson’s Link) be retained as a 
truncated version of Corridor 24. Potential for a Quality Bus route to 
Great North Park should also be investigated. 
Reasons 
High cost & low demand 
3 major new bridge crossings 
East- west route to airport already served by Metro 
Low levels of social and economic deprivation 
Anticipate that despite growth sites the demand for orbital movements 
will be low 
Bus service connecting Metro to Great Park to be in place for 12 years 
as part of the agreement with developers  
2.41 
The southern end of this route will be served by the Stephenson’s Link Quality Bus 
route. It has already been taken forward for more detailed analysis as Corridor 26. 
2.42 
This route is seen by officers at North Tyneside as an extension of the jobslink which 
will be provided by the Stephenson’s Link. Great North Park and the expansion of the 
Airport are seen as key employment opportunities for the residents of North Tyneside. 
A Quality Bus route between the end of Stephenson’s Link at Backworth and the 
Airport via Killingworth would be well supported locally. Improved services to the 
Airport (and airport-related employment sites) will need to take into account the travel 
patterns and timing of airport workers, often dominated by shift patterns.  
2.43 
Phase 1 of the Superoute network does not serve this corridor.  The length of this route 
is significant and generally uses local roads to ensure accessibility. It will therefore be 
essential that the alignment is considered for priority measures to ensure reasonable 
journey times and service reliability. The northern section of Corridor 24 should be 
considered for Phase 2 of the Superoute network, to coincide with the expansion of 
Great North Park.  
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
11 

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

2.44 
Further work should focus on: 

Establishing the viability of a dedicated northern orbital service and defining the 
traffic management priority measures which could be adopted; 

The introduction of a Quality Bus route may need to include specific branding to 
establish the importance of this ‘access to jobs’ service. 
Corridor 27: Newcastle – Whitley Bay 
Conclusion from the Corridor Selection Table 
Recommendation 
Not recommended as an LRT corridor.  
Recommend that improvements in access to existing South Tyne Loop 
Metro stations from catchments south and north of the Coast Road be 
examined. Also recommend a that a Quality Bus Route be introduced.  
Reasons 
Severe topographical and technical issues in achieving segregation 
Parallels existing South Tyne Loop of Metro 
Journey times likely to be significantly lower than existing Metro if 
segregation cannot be achieved 
Any segregation will significantly reduce capacity on a major road of 
regional strategic importance 
2.45 
Corridor 27 parallels the existing North Tyne Loop of the Metro network between 
Newcastle City Centre and the coast.  The corridor follows the Coast Road, a dual 
carriageway which runs to Whitley Bay equidistant between the northern and the 
southern lines of the Loop.   
2.46 
The Coast Road is a busy bus corridor and is heavily congested at peak times. Local 
bus services using the route loop on and off the dual carriageway to penetrate the 
adjacent residential areas, which face away from the road.   
2.47 
Phase 1 of the Superoute network does not serve this corridor but the Coast Road 
could be considered for Phase 2 of the Superoute network. A Quality Bus route will 
provide the infrastructure for a fast and reliable public transport service. It will require 
quality interchange facilities with local bus feeder services at  limited locations just of 
the Coast Road. Additional consideration will need to be given to releasing existing 
road space on the Coast Road for bus priority/lanes to ensure service reliability and 
speed.  Retaining a bus based system offers flexibility of service which is needed on 
this route to be able to penetrate the surrounding residential areas. 
2.48 
Further work should focus on: 

Establishing the viability of a limited stop bus service along the Coast Road 
including priority and segregation measures 

Assessing the level of accessibility required into local residential areas and 
interchange with local bus services. This would include junction priority controls 
to loop off and on to the Coast Road. 
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
12 

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

Corridor 29: Four Lane Ends to Byker 
Conclusion from the Corridor Selection Table 
Recommendation 
Not recommended as an LRT corridor.   
Recommend that improvements in access to Hospital/Longbenton 
employment area from existing Metro be examined. A Quality Bus 
Route should be introduced where possible (but limited opportunities as 
congested route) 
Reasons 
Duplicates existing Metro 
Journey time from Newcastle to Four Lane Ends very uncompetitive 
(35-45 mins compared to 11 via Metro) 
Access to Longbenton catchment recommended for examination of 
enhancements to existing system. 
2.49 
Corridor 29 links the Bus/Metro interchange at Four Lane Ends (which is to be 
redeveloped during 2003) and the Metro station at Byker.  The corridor makes use of 
the congested Benton Road and Chillingham Road.  These routes are well served by 
existing bus based public transport, but it is generally slow and unreliable due to the 
congested conditions.  There are limited opportunities for additional bus priority along 
this route without removing on-street parking and servicing ,and the widened footways 
through the retail areas.  
2.50 
Phase 1 of the Superoute network does not serve this corridor.  The possibility of 
providing bus priority (perhaps as Phase 2 of the network) should however be 
considered in more detail as it would greatly improve the movement of buses in this 
area if it can be achieved on a comprehensive basis.  However there are major layout 
problems and the need of local residents are important and an area wide approach 
would appear to be appropriate.. 
2.51 
At present, the number 62 bus service is timetabled to take 12 minutes to travel from 
Byker to Four Lane Ends.  The direct Metro anticlockwise on the North Tyneside 
Loop via the Coast is scheduled to take 32 minutes.  Taking the North Tyneside Loop 
clockwise, changing at Monument, is scheduled to take 28 minutes.  
2.52 
Further work should focus on: 

A relatively wide-ranging evaluation of the local traffic network between Four 
Lane Ends and Byker is required to establish the degree of bus priority measures, 
and removal of through traffic, which would improve the reliability and speed oif 
services. This could include bus-only sections and bus priority at signalised 
junctions. 
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
13 

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

3. 
NOTES ON THE 5 CORRIDORS REJECTED AT THE END OF THE PHASE 
1A ROUTE SELECTION PROCESS  

Route 10: Washington - Gateshead via Pelaw 
3.1 
Route 10 heads east out of Washington along the Sunderland Highway for 
approximately 2km where it heads north parallel to the A195 then east along Glover 
Road until it reaches the Leamside Line. The route either continues up the Leamside 
line or arcs through a proposed Strategic Employment Site up to Pelaw Metro Station. 
The alignment then follows the Metro line to Gateshead Metro Interchange. 
3.2 
The route has been rejected because of its uncompetitive journey times and low 
market share. Additionally there are issues over LRT/heavy rail integration on the 
Leamside line. However, the route could run through the proposed Strategic Site north 
of Nissan and therefore, is similar to the previously rejected Corridor 11. The 
development of Route 10 for a bus-based system would have to provide for local and 
business needs rather than a fast link between the Washington and Gateshead areas. 
3.3 
As described previously, Superoute service 194 (operated by Go Wear) provides a 
quick route from Washington to the centre of Gateshead. Another alternative to a LRT 
scheme would be to provide improvements to the existing bus services from 
Washington to Gateshead that run through the residential areas and potentially through 
the new Strategic Site. A Quality Bus route could improve bus stop facilities, 
passenger information and provide low floor buses with specific branded livery. These 
services should be aimed at serving the local residents with connections to the local 
Metro stations, retail and leisure areas as well as current and future places of work. 
3.4 
In this context, potential future heavy rail services on the Leamside line, with the 
potential for a new station and park and ride facility adjacent to Sunderland Highway, 
could provide the key element of a convenient and fast link to Newcastle. 
3.5 
Bus journeys from Washington to Gateshead via the Strategic Site can be made by 
either a direct bus journey or by use of bus and Metro. Existing bus services from the 
Nissan site (which is the nearest existing stop to the Strategic Site) to Gateshead Metro 
Interchange (188, 187) operate with a 34 minute journey time. Other services require 
the use of two buses or an interchange at Sunderland, Pelaw or Heworth Metro 
Stations. The 185 bus service operates between Washington & Sunderland via Nissan. 
3.6 
The future masterplan for the strategic site or its specific location in relation to the 
Nissan site has not yet been established. As such, a bus based technology would allow 
the flexibility to maximise penetration of the site, and thus accessibility. This could be 
done by creating a standalone bus service or via a new Superoute service.   
3.7 
Further work should focus on: 

Establishing the options for a significantly upgraded bus/Metro and heavy rail 
network to serve Washington, the Strategic Site and regional links through a 
corridor wide study, with the potential for MCR technology; 
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
14 

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 


Developing proposals for quality public transport services to the Strategic Site as 
the site plans become more developed. 
Route 15: South Shields - Washington 
3.8 
Route 15 has been rejected due to the fairly dispersed market and poor economic 
benefit and operating ratios. The route uses Metro alignment between South Shields 
and Tyne Dock Metro stations. It is envisaged that the route would utilise the link 
between South Shields and Sunderland (as for Route 12) and then run south west to 
Boldon Colliery, the proposed Strategic Site, Nissan, and along the Sunderland 
Highway to Washington Galleries. 
3.9 
The primary patronage potential between Boldon Colliery and Washington is Nissan 
and the proposed Strategic Site. If the Strategic Site is to be well served by public 
transport then a dedicated Quality Bus route (similar to Route 10) with high Quality 
Buses, shelters and passenger information systems will be required from Washington 
via the Sunderland Highway and Strategic Site to South Shields. Alternatively a bus 
route could follow the route of Superoute 194 to Heworth Metro station. Such route 
alignments would require bus priority measures at junctions and on key links to 
maximise service reliability and minimise journey times. 
3.10 
Existing bus services which could be improved to provide further Quality Bus routes 
are the X50 or the 551 which provide an hourly service between Washington and 
Sunderland via Tyne Dock and Chichester and have journey times of 30-40 minutes. 
Bus services do not pass through the Nissan or Strategic Sites but there is the potential 
for a route change so that these areas may be served more directly served. 
3.11 
Further work should focus on: 

Considering the improvement and integration of the Superoute and existing bus 
services serving the corridor to provide Quality Bus standards, reliability of 
services and improved journey time, where possible. 

Consider the integration with the Washington to Gateshead via Pelaw corridor 
study (Route 10). 

Developing proposals for quality public transport services to the Strategic Site as 
the site plans become more developed. 
Route 22 – Newcastle City Centre – Great North Park / Airport. 
3.12 
This alignment connects with the existing Airport Metro Line just south of the airport 
Metro terminus and continues as a segregated alignment through the area to be 
developed as Great North Park (GNP) for employment and residential uses. The route 
heads south from NGP across the A1(M) and around Bent Hill to join Metro Line at 
Wansbeck Road which it follows to Newcastle City Centre. 
3.13 
Route 22 has been rejected due to disproportionately high costs, reduced flexibility of 
service and a difficult alignment.  
3.14 
There are clear alternative public transport options for Route 22 to the Airport and/or 
the GNP development. Metro runs from Newcastle City Centre direct to the Airport. 
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
15 

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

Bus services between Newcastle and the Airport consist of services 76, 77, 79, 808 
which offer a 10 to 60 minute frequency and journey times of 20 to 25 minutes. As 
such, the Airport is relatively well served. Rail services could be introduced from the 
ECML, but this would be dependant on sharing tracks with Metro services. 
3.15 
The GNP development is to be served by a dedicated bus service for twelve years. 
This service will be supported by the developer with the hope that it will be a 
commercial service by the end of the supported period. There will be significant 
opportunities in and around NGP for bus priority measures to enable buses to avoid 
the congestion that may occur at peak times. Priority measures would be in addition to 
a Quality Bus package, which would include accessible bus stops with passenger 
information and liveried route-specific buses.  
3.16 
Further work should focus on: 

Working with the GNP developer on enhance bus services to the City Centre, 
considering a range of priority measures around and within the protected public 
transport corridor within GNP and at key junctions. 
Route 25  - Ashington – Newcastle via Backworth 
3.17 
Route 25 currently exists as a heavy rail freight route between Ashington and the 
ECML at Benton. The route has been rejected because the long length of the route, the 
dispersed settlements and the difficulty of penetrating the urban areas of Blyth and 
Ashington. This makes the route inappropriate for LRT. This is borne out by the large 
cost:benefit ratio.  
3.18 
There are currently no passenger rail services from Ashington to Newcastle. However 
the feasibility of implementing a heavy rail service has been examined. This is seen as 
a definite possibility at a cost of around £50 million. This service would prove a link 
to Blyth, Ashington and intermediate areas with interchange with Metro at Backworth 
and Newcastle Central station. An suburban railway approach is also more suitable to 
serve relatively widely spaced settlements.  
3.19 
At the moment, there is a bus service (X31) which runs from Ashington to Newcastle 
Haymarket Bus Station. In addition, Superoutes 42 and 43 run from Newcastle to 
Cramlington and on to Blyth. Enhanced bus stop facilities, passenger information, 
livery and reliability could be provided to help develop a fast and reliable service for 
both of these routes. Further work should focus on: 

The heavy rail passenger link to Ashington is considered the most appropriate 
and further studies should concentrate on its viability. The possible extension of 
the Superoute 42 and 43 to Ashington should also be considered. 
Route 26 – Stephenson’s Link 
3.20 
Route 26 follows either the proposed Stephenson’s Link bus corridor or the old 
railway line from Backworth Metro Station to the Royal Quays (a protected public 
transport corridor) to link with the new ferry terminal on the north bank of the Tyne.  
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
16 

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

3.21 
This route has been rejected because the Stephenson’s Link will provide an enhanced 
bus-based alternative in a more cost effective way, and is planned to open in early 
2004. The Stephenson's bus corridor will provide high quality integrated public 
transport to regeneration areas in North and South Tyneside providing interchange 
with the Metro, railway, (potentially) bus and ferry. 
 
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
17 

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 


P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
18 

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

CONTROL SHEET 
Project/Proposal Name: 
PROJECT ORPHEUS 
 
Document Title: 
Options for Corridors Considered Unsuitable 
as Metro Extensions During Phase 1A of 
Project Orpheus 
 
Client Contract/Project Number: 
 
 
Steer Davies Gleave Project/Proposal Number: 
204884 
 
Document Number: 
See footer 
 
Originator: 
Hilary Crowther  
 
Other Contributors: 
Richard McGarr and Peter Gross, Jacobs Consultancy 
 
Review By: 
Print: 
Luke Miller 
 
Sign:  
ISSUE HISTORY 
Issue No. 
Date 
Details 
1
6th May 2003 
Final version, reporting to end of Phase 1B Sift  
2
29th May 2003 
Final version, truncating the 6th May report, reporting to the 
end of Phase 1A  
 
DISTRIBUTION 
Clients: Nexus 
Consultant Team: 
Steer Davies Gleave, Ernst & Young and 
Jacobs Consultancy 
P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
Control Sheet 

Options for Corridors Considered Unsuitable as Metro Extensions During Phase 1A of 
Project Orpheus 

P:\PROJECTS\204800s\204884\Outputs\Reports\Reports on non-LRT routes\Options for non LRT routes_to end of Phase 1A_May 29 2003.doc 
Control Sheet