SCHEDULE F, PART 2 
OPERATIONAL SERVICE LEVEL 
 
 
 
 
 
 
Schedule F, Service Level Requirements 
 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
CONTENTS 
 

INTRODUCTION....................................................................................................................1 

SERVICE LEVEL CRITERIA...............................................................................................3 

SHADOW METRICS ............................................................................................................83 

SERVICE SCORE .................................................................................................................84 

IDENT1 WORKLOAD..........................................................................................................91 
 
 
Schedule F, Service Level Requirements 

Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 

INTRODUCTION 
This Part of Schedule F (Part 2) details the SLR for the IDENT1 Service, except for Livescan 
Services which are detailed separately in Part 3 of this Schedule. 
The Schedule details the following aspects of the SLR: 
(a) 
Service Level Metrics and the Target Service Levels applicable from the milestones 
TOR NAFIS and TOR SAFR; 
(b) 
the  changes  in  Service  Level  Metrics  to  be  incorporated  at  subsequent  program 
milestones as part of the continuous improvement process; 
(c) 
the planned use of shadow metrics to evolve the SLR. 
The framework detailing how the different Service Categories interact is detailed in. Figure 1.0-1 
below. 
Business
Compute 
TBD Metrics
Category 
Category Weights
Score
Availability
Capacity
System
Map Score to 
Response Time
WiSi
WcSc
Payment
Accuracy
Service Mgmt
Interfaces
User
Overall Score
Compute 
TBD Metrics
Category 
Score
Category Scores
 
Figure 1.0-1.  IDENT1 Service Level Structure 
 
This Part of the SLR will evolve in accordance with the process and procedures documented in Part 1 
of  this  Schedule  to  consist  of  three  Service  Categories  that  address  respectively  IDENT1  business 
values,  system  performance  and  user  needs.  Each  Service  category  will  contain  a  series  of  Service 
Criteria with respective Service Level Metrics. 
Each Service Category will generate a category score based on monthly measurements of its defined 
Service  Level  Metrics.  The  Service  Category  scores  are  then  weighted  and  summed  to  produce  an 
Overall Score that can be used in conjunction with an agreed payment profile as detailed in Schedule 
E to determine the actual payment.  
As Service Level Metrics within Service Categories are implemented, The Service Category weights 
that  will  affect  the  scoring  and  payment  need  to  be  negotiated  and  agreed  with  the  Authority  in 
accordance with Part 1 of this Schedule. The range of weighting for each Service Category is detailed 
in Figure 1.0-2  below. 
Schedule F, Service Level Requirements 

Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Service Category 
Minimum Weight 
Maximum Weight 
System Performance 
50% 
100% 
Business Values 
0% 
50% 
User Needs 
0% 
20% 
Figure 1.0-2.  Bounds for Service Category Weights 
At the milestone TOR NAFIS this SLR will become effective and the SLR will be based only on the 
Service Category - System Performance. The Service Level Criteria implemented under this Service 
Category  at  this  milestone  are  specifically  availability,  capacity/throughput,  response  time,  service 
management, and search accuracy.  
Schedule F, Service Level Requirements 

Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 

SERVICE LEVEL CRITERIA 
This section defines the Service Level Criteria.  The Service Level Criteria are indicative measures of 
the services supplied by the IDENT1 Contractor.  This section defines the criteria to be measured, the 
formulae used to calculate the criteria, and the scores to be associated with the actual values for each 
service level criteria. 
On  a  monthly  basis,  each  IDENT1  site  (i.e.,  Bureaux and  IDENT1  Training  Centres)  will  receive  a 
Service  Score.    This  Service  Score  will  be  used  to  assess  the  quality  of  the  IDENT1  Service  and 
computed as described in Figure 2.0-1 below and in Section 4 of this Part of this SLR.  Figure 2.0-1 
illustrates the steps that will be used to compute a score for each measure and how these scores will be 
used to compute the Site Service Score.  Specifically, the steps are as follows: 
Compute Individual
Compute the MEASURE
Site Scores
Using the defined
for Each Measure
Formula
Select Site SCORE  
Compute the
Corresponding
AVERAGE MEASURE
to MEASURE
Weight the SCORE
Compute Individual
Compute Site
According to Service
SERVICE SCORE
Site Service Scores
Weighting Factors
 
Figure 2.0-1  IDENT1 Measure Flow Diagram 
 
Step 1  Compute individual Site SCORE for each MEASURE.  
(a) 
Compute  each  MEASURE  for  each  Service  Level  Criteria  using  the  formulae 
presented in Section 2.1 through 2.5 of this SLR. 
(b) 
Where  appropriate,  compute  the  AVERAGE  MEASURE  for  that  month.    Note  that 
this step does not apply to all service measures.  In some instances, the MEASURE 
provides the singular value used to select the SCORE.   
(c) 
Select the SCORE that corresponds to the computed MEASURE.   
Step 2  Compute individual Site SERVICE SCORE. 
(a) 
WEIGHT each SCORE by using the weighting factor assigned to each MEASURE.  
This weight is assigned as part of this SLR.   
(b) 
Compute  the  SERVICE  SCORE  by  taking  the  summation  of  the  product  of  each 
SCORE and its WEIGHT.  This is shown in Equation 2.0-1. 
Schedule F, Service Level Requirements 

Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Equation 2.0-1: 
Service Score = ∑ (Score × Weight )  
The computation of an individual Site SCORE for each MEASURE (step 1 above) is presented in 
Section 2.1 through 2.5 of this SLR.   
2.1 
Operational Availability 
2.1.1 
Scope 
This  service  level  criterion  defines  metrics  for  the  measurement  of  operational 
availability:  availability  of  the  IDENT1  service  reflecting  loss  of  service  due  to 
unplanned  downtime.    The  service  is  defined  in  terms  of  serviceability  of  critical 
equipment. 
2.1.2 
Operational Availability Calculation 
Operational  Availability  (Ao)  will  include  the  critical  equipment,  as  defined  in 
Section  2.1.3.1,  2.1.4.1,  and  2.1.5.1.    These  characteristics  will  result  in  an  Ao 
calculation for the Central Segment, Bureaux Segment and Training System(s) based 
upon total hours available monthly and downtime of unplanned interruptions.  Ao will 
be calculated to two decimal places using Equation 1: 
( m
H − DTm)
Equation 1: 
Ao =
×100
m
H
 
Where, 
(a) 
Hm will be defined as the total hours in a given month.  This number will be 
determined each month as 24 hours multiplied by the number of days in the 
month.  
(b) 
DTm  will  be  defined  as  the  unplanned  downtime,  i.e.,  the  total  number  of 
hours in a given month that critical equipment is not available.   
The IDENT1 Service will be available 24 hours per day, every day of the year. The 
exceptions to this will be  
(a) 
Planned  system  interruptions  of up  to  4  hours in  any  one  day,  to  take  place 
contiguously  between  the  hours  of  22:00  and  06:00.    These  planned 
interruptions may affect only a part of the service and will be planned at least 
four  (4)  weeks  ahead  of  the  scheduled  time  of  the  disruption  with  prior 
agreement  between  Authority,  the  relevant  Bureaux  and  Contractor,  or  as 
agreed between the parties. The interruptions are described in terms of which 
of the described services will be impaired and to what degree. 
(b) 
Planned  local  outages  of  no  more  than  2  hours  per  day  on  any  one 
workstation or local server to enable the switch to new versions of software 
to  be  achieved  in  an  orderly  fashion.  These  short  outages  will  take  place 
between  the  hours  of  22:00  and  06:00  unless  other  arrangements  are  made 
between the Bureaux and the Contractor. The Contractor will notify the users 
at  least  two  (2)  weeks  before  these  types  of  outages  occur,  or  as  agreed 
between the Contractor and the Site Point of Contact. 
Schedule F, Service Level Requirements 

Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
(c) 
Emergency  outages  at  any  time  of  the  day,  by  mutual  agreement  with  the 
Contractor  and  the  Authority  or  Site  Point  of  Contact,  to  solve  severe 
operational problems.  Examples of such emergency outages may include, but 
may not be limited to: fire in the facilities, unexpected power outage within 
the  central  computer  facility,  or  severe  system  malfunction  that  could 
jeopardise the National collections. 
(d) 
Other exceptions as defined in Part 1 of this SLR. 
In  the  event  that  an  emergency  operational  need  arises  before  or  during  an 
interruption, the interruption may be postponed or service restored by the Contractor 
as soon as practical so as to allow IDENT1 services to operate. 
For multiple, redundant items at site, downtime will commence when all of a given 
item  are  no longer  available.    For  example,  multiple, redundant processors are  used 
within  select  Bureaux,  ITMCS,  AFRS,  and  ISRS.    Downtime  will  not  commence 
until  all  servers  within  the  subsystem  are  unavailable,  thereby  halting  normal 
operations.    The  same  is  true  for  fingerprint  matcher  banks.    Downtime  will 
commence  when  all  banks  of  a  given  search  type  (e.g.,  Print-to-Print,  etc.)  are 
unavailable.  Degraded performance as a result of a failure of a single item will not be 
considered  downtime.    However,  such  degraded  performance  may  impact  bureau 
operations  and  will  be  reflected  in  the  throughput  and  system  performance  service 
level criteria as defined in Section 2.2 and 2.3 of this SLR.   
Downtime will start and stop under the authorisation of the IDENT1 Help Desk and 
in consultation with the Site Point of Contact.  Downtime will only include unplanned 
interruptions.    Downtime  is  composed  of  administrative  delays  associated  with  co-
ordinating  personnel  arrival  time  at  a  site  (i.e.,  bureau  personnel  available  for  site 
technician  to  enter  a  site),  travel  time  to  the  site  (if  applicable),  service  restoration 
time,  and  time  to  test  corrective  actions.  Downtime  excludes  any  bureau-originated 
administrative delays that impede service delivery or restoration of service.   
Planned interruptions will be defined as all interruptions of services that take place as 
scheduled, and with prior agreement between the affected Head of Bureau(x) and the 
Contractor.  Planned interruptions shall exclude any period of unavailability required 
to  fix  problems  of  functionality  or  throughput,  which  result  from  the  Contractor’s 
failure  to  meet  IDENT1  requirements,  irrespective  of  whether  or  not  these 
interruptions are scheduled and undertaken with the prior agreement of the Authority 
or the bureau(x) involved 
Planned  Downtime  will  not  reduce  the  hours  available  per  month  (Hm)  nor  increase 
the  unplanned  downtime  per  month  (DTm).    In  all  instances,  the  Contractor  will 
declare the duration of a Planned Downtime Period, as defined above, prior to starting 
Planned  Downtime.    Planned  Downtime  in  excess  of the  Planned  Downtime  Period 
will become Unplanned Downtime commencing at the end of the period. 
When a critical component or all of the system becomes unavailable, the Contractor 
will inform the Bureaux and will continue to manage the Service in such a way as to 
ensure that the daily workload is completed within the working day.  If this becomes 
impractical,  the  problem  will  be  escalated  within  the  Contractor  for  decisions  on 
priorities, in accordance with the IDENT1 Maintenance Plan.   
Provisional Handback - Upon completion of significant work on the system, such as 
an ECP, Northrop Grumman may request a period of time during which the normal 
conditions of the SLR continue to be suspended.  This time period will be referred to 
Schedule F, Service Level Requirements 

Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
as Provisional Handback of the system.  The purpose of this is to ensure that there is 
no  adverse  impact  of  the  change  once  the  full  operational  workload  is  submitted  to 
the  system.    Application  of  Provisional  Handback  will  be  agreed  in  advance  with 
PITO, including a maximum duration.   
The Disaster Recovery System will be available to support IDENT1 operations in the 
event of a disaster at the primary site.  The DRS must be fully operational within 24 
hours  of  a  requested  start.    Those  24  hours  will  be  considered  planned  down  time.  
Time taken beyond 24 hours will be considered unplanned down time. 
2.1.3 
Central Segment Availability 
2.1.3.1  Central Segment Critical Components 
The Central Segment consists of equipment at the Primary Site at Hendon and at the 
DRS site. Central Segment Ao will be based on the total hours in a given month and 
unplanned downtime of the critical equipment in a given month at each of the sites.  
Critical and Non-Critical items for the Primary Site are identified in Figure 2.1-1 and 
for the DRS in Figure 2.1-2. 
Critical Components Primary Site 
Non-Critical Components 
Servers (ITMCS-ISRS-AFRS) 
Server Tape Jukebox (ITMCS-ISRS-AFRS) 
Storage Controllers (ISRS) 
Small SCSI Switch (ITMCS-ISRS-AFRS) 
Storage Controller Tape Jukeboxes (ISRS) 
 
Network Routers 
Server monitor, keyboard, and mouse (ITMCS-
ISRS-AFRS) 
 
Text Printers 
Network Switches 
Computer Operator Workstations 
Print-to-Print Search Engines 
Central Segment Personal Computer 
Print-to-Mark Search Engines 
Network Management Server 
Mark-to-Print Search Engines 
Management Console Workstation 
Mark-to-Mark Search Engines 
Management LAN 
Central Segment RAID Assemblies (ITMCS-
HSM Server 
ISRS-AFRS) 
NIS+/LDAP/DNS servers 
 
Figure 2.1-1 Primary Site Critical and Non-Critical Components 
Schedule F, Service Level Requirements 

Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
 
Critical Components – Disaster Recovery Site  Non-Critical Components 
Servers (ITMCS-ISRS-AFRS) 
Server Tape Jukebox (ITMCS-ISRS-AFRS) 
Storage Controllers (ISRS) 
Small SCSI Switch (ITMCS-ISRS-AFRS) 
Storage Controller Tape Jukeboxes (ISRS) 
 
Network Routers 
Server monitor, keyboard, and mouse (ITMCS, 
ISRS, AFRS) 
 
Text Printers 
Network Switches 
Computer Operator Workstations 
Print-to-Print search engines 
DRS Personal Computer 
Print-to-Mark search engines 
Network Management Server 
Mark-to-Print search engines 
Management Console Workstation 
Mark-to-Mark search engines 
Management LAN 
Replicated RAID Assemblies (ITMCS-ISRS-
HSM Server 
AFRS) 
NIS+/LDAP/DNS servers 
 
Figure 2.1-2.  Central Segment - DRS Critical and Non-Critical Components 
2.1.3.2  Central Segment Ao Scoring 
The Central Segment Primary Site and DRS Site Ao value will be computed monthly 
using Equation 1 of Section 2.1.2. 
Once  each  Ao  value  has  been  computed,  the  SCORE  will  be  selected  from  the 
Scoring  Table  presented  as  Figure  2.1-4  to  produce  the  Central  Ao  Service  Level 
Scores as shown in Figure 2.1-3.   
 
Ao  
SCORE 
Central Ao Primary   
 
Central Ao DRS 
 
 
Figure 2.1-3 Central Segment Ao Score 
 
Schedule F, Service Level Requirements 

Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Central 
SCORE   Central 
SCORE   Central 
SCORE  
Segment 
Segment 
Segment 
Ao 
Ao 
Ao 
100.0 
110.0 
98.3 
93.0 
96.6 
76.0 
99.9 
109.0 
98.2 
92.0 
96.5 
75.0 
99.8 
108.0 
98.1 
91.0 
96.4 
74.0 
99.7 
107.0 
98.0 
90.0 
96.3 
73.0 
99.6 
106.0 
97.9 
89.0 
96.2 
72.0 
99.5 
105.0 
97.8 
88.0 
96.1 
71.0 
99.4 
104.0 
97.7 
87.0 
96.0 
70.0 
99.3 
103.0 
97.6 
86.0 
95.9 
69.0 
99.2 
102.0 
97.5 
85.0 
95.8 
68.0 
99.1 
101.0 
97.4 
84.0 
95.7 
67.0 
99.0 
100.0 
97.3 
83.0 
95.6 
66.0 
98.9 
99.0 
97.2 
82.0 
95.5 
65.0 
98.8 
98.0 
97.1 
81.0 
95.4 
64.0 
98.7 
97.0 
97.0 
80.0 
95.3 
63.0 
98.6 
96.0 
96.9 
79.0 
95.2 
62.0 
98.5 
95.0 
96.8 
78.0 
95.1 
61.0 
98.4 
94.0 
96.7 
77.0 
≤95.0 
60.0 
Figure 2.1-4 Central Segment Ao Scoring Table 
The  Central  Ao  Service  Level  Scores  will  be  allocated  to  each  IDENT1  site  on  an 
equal  basis,  with  each  Site  receiving  the  same  value,  in  the  Central  Ao  columns  of 
Figure 4.1-1. 
In  the  event  of  a  disaster  at  the  primary  site  and  the  use  of  the  DRS  to  support 
IDENT1 operations, no Central Ao - Primary will be computed.  Rather the Ao of the 
DRS site will be used as the Central Ao - Primary value in Figure 4.1-1 with a weight 
of 0.10, and the value of the DRS Ao will be set to zero (0). If there is a disaster at the 
DRS, the Central Ao - Primary value will be computed as normal but with a weight of 
0.10 and a value of zero (0) will be used for the DRS Ao. 
2.1.4 
Bureau Segment Availability 
2.1.4.1  Bureau Segment Critical Components 
Schedule F, Service Level Requirements 

Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Bureau Segment Ao will be based on the total hours in a given month and unplanned 
downtime of the critical equipment in a given month.  Critical and Non-Critical items 
are identified in Figure 2.1-5. 
Where a site has multiple instances of the same critical equipment item, as defined in 
Figure  2.1-5,  (e.g.,  workstation(s)),  the  Contractor  and  the  Head  of  Bureau(x)  (or 
designated nominee) will determine whether or not the site is unavailable to process 
its  work  in  order  to  compute  a  monthly  downtime  for  that  site.    The  results  of  this 
consultation will be recorded in the Help Desk Management System.  At all sites, the 
text  printer  will  be  non-critical.    However,  where  a  site  has  a  text  printer  and  a 
graphics printer, the graphics printer may be critical if the Contractor and the Head of 
Bureau(x) (or designated nominee) determine that the site is unavailable to process its 
work without the availability of that printer.  The results of this consultation will also 
be recorded in the Help Desk Management System. 
The  External  Transaction  Bureau  (ETB)  server  is  physically  located  at  Central. 
However, it is considered a Bureau just as the Hendon Bureau is considered a Bureau.  
The  critical  component  for  the  ETB  bureau  is  the Transaction  Server.   This  Bureau 
does not have printers or workstations. 
Critical Components 
Non-Critical Components 
WAN 
Tape Jukebox 
Server(s) 
Text Printers 
Workstation(s) 
Server monitor, keyboard, mouse, CD ROM and 
tape drive 
Mark and Ten Print Scanner(s) 
Graphic printer(s) unless agreed critical per left 
column 
Network Router 
 
Network Hub 
 
Network Switch 
 
Bar Code Printer(s) 
 
Bar Code Reader(s) 
 
RAID Assembly 
 
PNC 
 
Satellcom Gateways 
 
Graphic Printer(s) under agreed exception 
 
conditions 
Operational Response Matchers 
 
Figure 2.1-5 Bureau Segment Critical and Non-Critical Components 
Schedule F, Service Level Requirements 

Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
2.1.4.2  Bureau Segment Ao Scoring 
The Ao value for each Bureau will be computed monthly using Equation 1 of Section 
2.1.2. 
Schedule F, Service Level Requirements 
10 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Bureau 
Ao 
SCORE 
Bureau 
Ao 
SCORE 
Avon + Somerset  
 
 
Norfolk 
 
 
Bedfordshire 
 
 
North Wales 
 
 
British Transport 
 
 
North Yorkshire 
 
 
Police 
Northamptonshire 
 
 
Cambridgeshire 
 
 
Northumbria 
 
 
Cheshire 
 
 
Nottinghamshire  
 
 
City of London  
 
 
South Wales  
 
 
Cleveland 
 
 
South Yorkshire  
 
 
Cumbria 
 
 
Staffordshire  
 
 
Customs and Excise 
 
 
Suffolk 
 
 
Derbyshire 
 
 
Surrey 
 
 
Devon + Cornwall 
 
 
Sussex  
 
 
Dorset 
 
 
Thames Valley 
 
 
Durham 
 
 
Warwickshire 
 
 
Dyfed Powys 
 
 
West Mercia 
 
 
Essex 
 
 
West Midlands 
 
 
Gloucestershire 
 
 
West Yorkshire 
 
 
Greater Manchester 
 
 
Wiltshire 
 
 
Gwent 
 
 
Ext. Transaction 
 
 
Hampshire 
 
 
Bureau 
Hertfordshire  
 
 
Figure 2.1-6  Bureau Segment Ao Score 
Humberside 
 
 
 
Kent 
 
 
Lancashire 
 
 
Leicestershire 
 
 
Lincolnshire 
 
 
Merseyside 
 
 
Metropolitan  
 
 
N.I.S./Residual Bureau   
 
Schedule F, Service Level Requirements 
11 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Once  the  Bureau  Ao  value  has  been  computed  for  each  Bureau,  the  Service  Level 
Score  for  each  Bureau  will  be  selected  from  the  Scoring  Table  presented  as  Figure 
2.1-7 to produce the Bureau Ao Service Level Scores as shown in Figure 2.1-6.   
Bureau 
SCORE   Bureau 
SCORE   Bureau 
SCORE  
Segment 
Segment 
Segment 
Ao 
Ao 
Ao 
100.0 
110.0 
98.3 
93.0 
96.6 
76.0 
99.9 
109.0 
98.2 
92.0 
96.5 
75.0 
99.8 
108.0 
98.1 
91.0 
96.4 
74.0 
99.7 
107.0 
98.0 
90.0 
96.3 
73.0 
99.6 
106.0 
97.9 
89.0 
96.2 
72.0 
99.5 
105.0 
97.8 
88.0 
96.1 
71.0 
99.4 
104.0 
97.7 
87.0 
96.0 
70.0 
99.3 
103.0 
97.6 
86.0 
95.9 
69.0 
99.2 
102.0 
97.5 
85.0 
95.8 
68.0 
99.1 
101.0 
97.4 
84.0 
95.7 
67.0 
99.0 
100.0 
97.3 
83.0 
95.6 
66.0 
98.9 
99.0 
97.2 
82.0 
95.5 
65.0 
98.8 
98.0 
97.1 
81.0 
95.4 
64.0 
98.7 
97.0 
97.0 
80.0 
95.3 
63.0 
98.6 
96.0 
96.9 
79.0 
95.2 
62.0 
98.5 
95.0 
96.8 
78.0 
95.1 
61.0 
98.4 
94.0 
96.7 
77.0 
≤95.0 
60.0 
Figure 2.1-7 Bureau Ao Scoring Table 
The Bureau Segment Ao Service Level Score will be placed in the Site Ao column of 
Figure 4.1-1 for each IDENT1 Bureau. 
2.1.5 
Training System Availability 
2.1.5.1  Training System Critical Components 
Training System Ao will be based on the total hours in a given month and unplanned 
downtime of the critical equipment in a given month.  Critical and Non-Critical items 
are identified in Figure 2.1-8. 
Schedule F, Service Level Requirements 
12 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
When  a  critical  equipment  item,  as  defined  in  Figure  2.1-8,  (e.g.,  workstation(s)), 
becomes  unavailable  at  a  Training  Centre,  the  Contractor  and  the  Head  of  the 
Training  Centre  (or  designated  nominee)  will  assess  the  impact  on  that  centre’s 
course  schedule.    If,  because  of  a loss  of  an equipment  item,  the Training  Centre  is 
unable to continue with its training schedule, then the time that the item is unavailable 
will be recorded as downtime in order to compute a monthly downtime for that site.  
If  the  loss  of  an  equipment  item  does  not  affect  the  Training  Centre’s  training 
schedule,  then  no  downtime  will  be  recorded  until  such  time  as  the  loss  affects  the 
training schedule.  The results of this consultation will be recorded in the Help Desk 
Management  System.    The  text  printer  will  be  non-critical  at  the  Training  Centres.  
However,  where  a site  has  a  text  printer and  a  graphics  printer, the  graphics  printer 
may  be  deemed  critical  if  the  Contractor  and  the  Head  of  the  Training  Centre  (or 
designated nominee) determine that the Training Centre is unable to continue with its 
training schedule without it. The results of this consultation will also be recorded in 
the Help Desk Management System. 
Critical Components 
Non-Critical Components 
Server(s) (combined ITMCS, ISRS, AFRS, and 
Tape Jukebox 
Bureau) 
Workstation(s) 
Text Printers 
Mark and Ten Print Scanner(s) 
Server monitor, keyboard, mouse, CD ROM and 
tape drive 
Network Router 
PNN 
Network Hub 
Graphic Printer(s) unless agreed critical 
Network Switch 
 
Bar Code Printer(s) 
 
Bar Code Reader(s) 
 
Redundant Array of Independent Disks (RAID) 
 
assembly 
Graphic Printer(s) under agreed exception 
 
conditions 
Figure 2.1-8 Training System Critical and Non-Critical Components 
2.1.5.2  Training System Ao Scoring 
The Ao value for each Training System will be computed using Equation 1 of Section 
2.1.2 
Schedule F, Service Level Requirements 
13 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
 
Training System  Ao  
SCORE 
Hendon 
 
 
Durham 
 
 
Figure 2.1-9.  Training System Ao Score 
Once the Ao value has been computed for each Training System, the SCORE for each 
Training System will be selected from the Scoring Table presented as Figure 2.1-10 
to produce the Training System Ao Service Level Scores as shown in Figure 2.1-9.   
Training  SCORE   Training  SCORE   Training  SCORE  
Segment 
Segment 
Segment 
Ao 
Ao 
Ao 
100.0 
110.0 
98.3 
93.0 
96.6 
76.0 
99.9 
109.0 
98.2 
92.0 
96.5 
75.0 
99.8 
108.0 
98.1 
91.0 
96.4 
74.0 
99.7 
107.0 
98.0 
90.0 
96.3 
73.0 
99.6 
106.0 
97.9 
89.0 
96.2 
72.0 
99.5 
105.0 
97.8 
88.0 
96.1 
71.0 
99.4 
104.0 
97.7 
87.0 
96.0 
70.0 
99.3 
103.0 
97.6 
86.0 
95.9 
69.0 
99.2 
102.0 
97.5 
85.0 
95.8 
68.0 
99.1 
101.0 
97.4 
84.0 
95.7 
67.0 
99.0 
100.0 
97.3 
83.0 
95.6 
66.0 
98.9 
99.0 
97.2 
82.0 
95.5 
65.0 
98.8 
98.0 
97.1 
81.0 
95.4 
64.0 
98.7 
97.0 
97.0 
80.0 
95.3 
63.0 
98.6 
96.0 
96.9 
79.0 
95.2 
62.0 
98.5 
95.0 
96.8 
78.0 
95.1 
61.0 
98.4 
94.0 
96.7 
77.0 
≤95.0 
60.0 
Figure 2.1-10  Training System Ao Scoring Table 
Schedule F, Service Level Requirements 
14 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
The Training System Ao Service Level Score will be placed in the Site Ao column of 
Figure 4.1-1 for each IDENT1 Training Site. 
2.1.6 
Future Changes for Availability 
Several changes to the availability service level criterion will be incorporated by no 
later than FOC. These include the following: 
(a) 
Updating  the  score  tables  to  reflect  score  of  100  for  measured 
availability  Target  Service  Level  of  99.5%  at  FOC  and  99.6%  at 
FOC+3 years 
(b) 
Updating  the  Critical  and  Non-Critical  component  list  to  reflect 
IDENT1 Service architecture and hardware 
(c) 
Deletion of separate scoring for Primary Central and DRS sites 
(d) 
Implementation of Planned Downtime metrics 
2.1.6.1  Scoring Table Update 
To reflect the increase of availability requirements from 99% for NAFIS applicable at 
TOR to 99.5% for the IDENT1 Service applicable at FOC when the full architecture 
is deployed, availability score tables for both the Central site and the Bureaux will be 
updated to  provide a  score  of  100  when  the Target  Service  Level  for availability  of 
99.5%  is  met.  The  updated  table,  Figure  2.1-11,  applicable  for  the  Central  site,  the 
Bureaux and the training sites is shown below: 
Ao 
Score 
Ao 
Score 
Ao 
Score 
Ao 
Score 
Ao 
Score 
100.0 
110.0 
99.20 
97.0 
98.20 
84.0 
97.55 
71.0 
96.90 
58.0 
99.95 
109.0 
99.10 
96.0 
98.15 
83.0 
97.50 
70.0 
96.85 
57.0 
99.90 
108.0 
99.00 
95.0 
98.10 
82.0 
97.45 
69.0 
96.80 
56.0 
99.85 
107.0 
98.90 
94.0 
98.05 
81.0 
97.40 
68.0 
96.75 
55.0 
99.80 
106.0 
98.80 
93.0 
98.00 
80.0 
97.35 
67.0 
96.70 
54.0 
99.75 
105.0 
98.70 
92.0 
97.95 
79.0 
97.30 
66.0 
96.65 
53.0 
99.70 
104.0 
98.60 
91.0 
97.90 
78.0 
97.25 
65.0 
96.60 
52.0 
99.65 
103.0 
98.50 
90.0 
97.85 
77.0 
97.20 
64.0 
96.55 
51.0 
99.60 
102.0 
98.45 
89.0 
97.80 
76.0 
97.15 
63.0 
96.50 
50.0 
99.55 
101.0 
98.40 
88.0 
97.75 
75.0 
97.10 
62.0 
 
 
99.50 
100.0 
98.35 
87.0 
97.70 
74.0 
97.05 
61.0 
 
 
99.40 
99.0 
98.30 
86.0 
97.65 
73.0 
97.00 
60.0 
 
 
99.30 
98.0 
98.25 
85.0 
97.60 
72.0 
96.95 
59.0 
 
 
Figure 2.1-11. Central Site and Bureaux Ao Scoring Table at FOC 
Schedule F, Service Level Requirements 
15 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
To provide  continuous  improvement,  the target  value for availability  will  be  further 
increased  to  99.6%  at  FOC+3  years.  At  that  milestone,  the  scores  shown  in  Figure 
2.1-11 will be shifted upwards to reflect a score of 100 for a measured Ao of 99.6% 
for the Central, Bureaux, and training sites. Further improvement in availability will 
be incentivised through the SLR scoring structure. 
2.1.6.2  Critical Equipment 
To  support  the  availability  measurement,  the  tables  defining  the  critical  and  non-
critical component lists for the Central site and the Bureaux will be updated at FOC. 
The  updated  tables  will  fully  reflect  the  deployed  IDENT1  Service  architecture  and 
hardware. 
2.1.6.3  Deletion of DRS 
At TOR, availability is measured on the NAFIS architecture with a Primary Central 
Site  and  a  DRS.  Separate  measurements  and  scoring  are  performed  for  these  sites 
with a weight of 7% for the Primary and 3% for the DRS. With the full deployment of 
the  IDENT1  web  service  based  architecture  with  load  balancing  at  FOC,  separation 
scoring  becomes  unnecessary  due  to  the  symmetry  of  the  architecture.  A  single 
availability measurement of the central sites will be made with a weight of 10%. 
2.1.6.4  Measurement of Planned Downtime 
To  support  the  goal  of  minimizing  planned  downtime  in  addition  to  unplanned 
downtime,  shadow  metrics  will  be  defined  and  evaluated.    The  goal  is  for  a  single 
metric  that  incorporates  both  planned  and  unplanned  downtime.    As  a  minimum, 
separate metrics on planned downtime will be defined, agreed with the Authority and 
evaluated as shadow metrics prior to the FOC.  These metrics will have target values 
derived from the DOR requirements of total planned downtime of 4 hours in a rolling 
24-hour  window,  and  frequency  of  occurrence  of  no  more  than  two  in  a  rolling  4-
week  period  for  the  central  services;  and  total  planned  downtime  of  4  hours  in  a 
rolling 4-week window for each Bureau.  If supported by the evaluation results, it is 
envisioned  that  these  metrics  will  be  implemented  per  the  SLR  change  process 
defined  in  Part  1.  The  recommended  weighting  structure  incorporating  the  planned 
downtime metrics is shown in Figure 2.1-12. 
Availability Metrics and Weights 
Central 
Bureaux 
Ao 
Planned Downtime 
Ao 
Planned Downtime 
0.075 
0.025 
0.075 
0.025 
Figure 2.1-12. Availability Metrics and Weights 
2.1.6.5  Scottish Bureaux 
In  addition  to  the  above  changes,  at  intermediate  milestones  prior  to  the  FOC,  i.e., 
when  the  Scottish  Bureaux  become  operational,  availability  will  be  measured  and 
scored  for  these  Bureaux  in  a  similar  manner  to  existing  Bureaux  using  the  then 
applicable metrics and scoring tables. 
Schedule F, Service Level Requirements 
16 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
2.2 
Throughput 
2.2.1 
Scope 
Ten Print and Mark processing will be measured in terms of throughput.  Throughput will be 
defined as the percentage of Ten Print or Print Set and Mark transactions completed within a 
specified  time  period.    These  criteria  will  measure  the  throughput  of  the  system  while  not 
restricting  working  practices.    This  section  is  subject  to  design  limitations  expressed  in 
Section 5 of this SLR, Workload Assumptions. 
2.2.2 
Ten Print Throughput 
Ten Print Throughput will be computed for each Bureau and the NIS.  Ten Print Throughput 
will not be computed for the Training Centres.   
All  processing  steps  within  Ten  Print  processing,  from  Ten  Print  form  take-on  through Ten 
Print close-out, will be included in the Ten Print Throughput measure as a means of capturing 
the overall throughput of the system.  For this reason, Ten Print Throughput will be measured 
on an aggregate monthly basis and will not consider other factors affecting throughput such as 
working practices, search priority and search scope.   
Equation 2.2-1 will be used to calculate the Bureau Ten Print Throughout (TPt). 

TPc

Equation 2.2-1: 
TPt =  MIN(TPa TP ) ×100


,
max 
 
where 
(a) 
TPc is the total number of Ten Print transactions processed through close-out 
during  the  month.    Close-out  is  the  final  disposition  of  all  Ten  Print 
transactions.   
(b) 
TPa is the total number of Ten Print forms received and processed during the 
month.  This will be measured at the point of submission.   
(c) 
TPmax is the monthly number of Ten Prints received and processed as defined 
in Section 5 of this SLR for the respective bureau.   
In  Equation  2.2-1,  the  denominator  will  be  the  lesser  of  either  TPa  or  TPmax.    Ten  Print 
Throughput for each Bureau will be computed using Equation 2.2-1.  This value will be the 
TEN PRINT THROUGHPUT value as shown in column 2 of Figure 2.2-1)  
Transactions  for  the  External  Transactions  Bureau  will  be  considered  closed  out  when  the 
response to a search request has been transmitted to the requesting external system. 
Schedule F, Service Level Requirements 
17 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Bureau 
Ten Print 
SCORE 
Bureau 
Ten Print 
SCORE 
Throughput 
Throughput 
Avon + Somerset  
 
 
Norfolk 
 
 
Bedfordshire 
 
 
North Wales 
 
 
British Transport Police   
 
North Yorkshire 
 
 
Cambridgeshire 
 
 
Northamptonshire 
 
 
Cheshire 
 
 
Northumbria 
 
 
City of London 
 
 
Nottinghamshire  
 
 
Cleveland 
 
 
N.I.S./Residual Bureau 
 
 
Cumbria 
 
 
South Wales 
 
 
Customs and Excise 
 
 
South Yorkshire 
 
 
Derbyshire 
 
 
Staffordshire 
 
 
Devon + Cornwall 
 
 
Suffolk 
 
 
Dorset 
 
 
Surrey 
 
 
Durham 
 
 
Sussex  
 
 
Dyfed Powys 
 
 
Thames Valley 
 
 
Essex 
 
 
Warwickshire 
 
 
Gloucestershire 
 
 
West Mercia 
 
 
Greater Manchester 
 
 
West Midlands 
 
 
Gwent 
 
 
West Yorkshire 
 
 
Hampshire 
 
 
Wiltshire 
 
 
Hertfordshire 
 
 
Ext. Transaction Bureau   
 
Humberside 
 
 
Figure 2.2-1   Ten Print Throughput Scores 
Kent 
 
 
 
Lancashire 
 
 
Leicestershire 
 
 
Lincolnshire 
 
 
Merseyside 
 
 
Metropolitan  
 
 
N.I.S./Residual Bureau 
 
 
Schedule F, Service Level Requirements 
18 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
In  the  event  that  no  applicable  ten  prints  are  processed  by  the  site  in  the  reporting  period,  a  fixed 
SCORE of 100 shall be applied to TEN PRINT THROUGHPUT for that site.   Once the TEN PRINT 
THROUGHPUT  value  has  been  computed  for  each  Bureau,  the  SCORE  for  each  Bureau  will  be 
selected from the Scoring Table presented as Figure 2.2-2.   
Ten Print 
Ten Print 
Ten Print 
Ten Print 
Ten Print 
Score 
Score 
Score 
Score 
Score 
Throughput 
Throughput 
Throughput 
Throughput 
Throughput 
≥110 
115 
99 
99 
88 
88 
77 
77 
66 
66 
109 
113 
98 
98 
87 
87 
76 
76 
65 
65 
108 
111 
97 
97 
86 
86 
75 
75 
64 
64 
107 
109 
96 
96 
85 
85 
74 
74 
63 
63 
106 
107 
95 
95 
84 
84 
73 
73 
62 
62 
105 
105 
94 
94 
83 
83 
72 
72 
61 
61 
104 
104 
93 
93 
82 
82 
71 
71 
≤60 
60 
103 
103 
92 
92 
81 
81 
70 
70 
 
 
102 
102 
91 
91 
80 
80 
69 
69 
 
 
101 
101 
90 
90 
79 
79 
68 
68 
 
 
100 
100 
89 
89 
78 
78 
67 
67 
 
 
Figure 2.2-2  Ten Print Throughput Scoring Table 
The SCORE will be used for SLR reporting as shown in Figure 4.1-1.  Ten Print Throughput 
will be reported on an individual Bureau basis. 
2.2.3 
Mark Throughput 
Mark Throughput will be computed for each Bureau.  Mark Throughput will not be 
computed for the Training Centres.   
Mark  Throughput  will  be  measured  on  an  aggregate  monthly  basis  and  will  not 
consider other factors affecting throughput such as working practices, search priority 
and search scope.   
Equation 2.2-2 will be used to calculate the Bureau Mark Throughput (Mt). 
 ( ni
M +
i
M + Mr + Mpni + Mpi)
Equation 2.2-2: 
t
M =  MIN(MPa MP )
×100


,
max +
pr
M

 
where 
(a) 
Mni  is  defined  as  the  number  of  Mark-to-Print  non-identification  decisions 
made at the Bureau during the month as the result of a Mark-to-Print search 
submission.  This decision is made after all images have been down-loaded to 
Schedule F, Service Level Requirements 
19 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
the  Bureau  and  the  Fingerprint  Officer  has  reviewed  the  respondent  list  to 
make  the  first-level  identification  determination.  Second-  and  third-level 
identifications  are  excluded  from  the  calculation  as  the  Bureau  may  take 
some time to process the Mark through third-level identification. 
(b) 
Mi is defined as the number of Mark-to-Print identification decisions made at 
the  Bureau  during  the  month  as  the  result  of  a  Mark-to-Print  search 
submission.  This decision is made after all images have been down-loaded to 
the  Bureau  and  the  Fingerprint  Officer  has  reviewed  the  respondent  list  to 
make  the  first-level  identification  determination.    The  remainder  of  the 
respondents after the Mark-to-Print identification is made are excluded from 
the calculation.  
(c) 
Mr is defined as the remainder of searches that remain in ‘In Compare 1’ four 
months after those searches were submitted.  For example, searches that were 
launched and returned in January, which had not been idented or non-idented 
by May, would be Mr in the Mark Throughput calculation for May.  If these 
searches  were  subsequently  idented  or  non-idented,  the  statistical  collection 
process  will  prevent  them  from  being  included  in  the  calculation  a  second 
time.  
(d) 
MPa  is  defined  as  the actual  number  of  Mark-to-Print  searches  submitted  at 
the Bureau during the month.  Note that a re-launch or repeat of a search is 
considered a separate search.   
(e) 
MPmax  is  defined  as  the  maximum  number  of  Mark-to-Print  searches 
submitted at the Bureau during the month.  The maximum number of Mark-
to-Print searches is defined, for each Bureau, in Section 5 of this SLR.  
(f) 
Mpni  is  defined  as  the  number  of  Mark-to-Police  Elimination  Database  non-
identification decisions made at the Bureau during the month as the result of 
a  Mark-to-Police  Elimination  Database  search  submission.    This  decision  is 
made  after  all  images  have  been  down-loaded  to  the  Bureau  and  the 
Fingerprint  Officer  has  reviewed  the  respondent  list  to  make  the  first-level 
identification determination. 
(g) 
Mpi  is  defined  as  the  number  of  Mark-to-Police  Elimination  Database 
identification decisions made at the Bureau during the month as the result of 
a  Mark-to-Police  Elimination  Database  search  submission.    This  decision  is 
made  after  all  images  have  been  down-loaded  to  the  Bureau  and  the 
Fingerprint  Officer  has  reviewed  the  respondent  list  to  make  the  first-level 
identification determination. 
(h) 
Mpr  is  defined  as  the  number  of  Mark-to-Police  Elimination  Database 
searches that are returned with one or more respondents. 
In Equation 2.2-2, the denominator will be the lesser of either MPa or MPmax plus Mpr.  Mark 
Throughput for each Bureau will be computed using Equation 2.2-2.  This value will be the 
MARK THROUGHPUT value as shown in column 2 of Figure 2.2-3.   
 
Schedule F, Service Level Requirements 
20 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Bureau 
Mark 
SCORE 
Bureau 
Mark 
SCORE 
Throughput 
Throughput 
Avon + Somerset  
 
 
N.I.S./Residual Bureau 
 
 
Bedfordshire 
 
 
Norfolk 
 
 
British Transport Police   
 
North Wales 
 
 
Cambridgeshire 
 
 
North Yorkshire 
 
 
Cheshire 
 
 
Northamptonshire 
 
 
City of London 
 
 
Northumbria 
 
 
Cleveland 
 
 
Nottinghamshire  
 
 
Cumbria 
 
 
South Wales 
 
 
Customs and Excise 
 
 
South Yorkshire 
 
 
Derbyshire 
 
 
Staffordshire 
 
 
Devon + Cornwall 
 
 
Suffolk 
 
 
Dorset 
 
 
Surrey 
 
 
Durham 
 
 
Sussex  
 
 
Dyfed Powys 
 
 
Thames Valley 
 
 
Essex 
 
 
Warwickshire 
 
 
Gloucestershire 
 
 
West Mercia 
 
 
Greater Manchester 
 
 
West Midlands 
 
 
Gwent 
 
 
West Yorkshire 
 
 
Hampshire 
 
 
Wiltshire 
 
 
Hertfordshire 
 
 
Ext. Transaction Bureau   
 
Humberside 
 
 
Figure 2.2-3  Mark Throughput Score 
Kent 
 
 
 
Lancashire 
 
 
Leicestershire 
 
 
Lincolnshire 
 
 
Merseyside 
 
 
Metropolitan  
 
 



Schedule F, Service Level Requirements 
21 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
In the event that no applicable marks are processed by the site in the reporting period, a fixed 
SCORE  of  100  shall  be  applied  to MARK THROUGHPUT  for  that  site.    Once the  MARK 
THROUGHPUT value has been computed for each Bureau, the SCORE for each Bureau will 
be  selected  from  the  Scoring  Table  presented  as  Figure  2.2-4.    The  Immigration  and 
Nationality  Directorate  is  not  expected  to  submit  any  marks  and  the  External  Transaction 
Bureau score will be set to 100. 
Mark 
Mark 
Mark 
Mark 
SCOR
Mark 
SCORE 
SCORE 
SCORE 
SCORE 
Throughput 
Throughput 
Throughput 
Throughput 

Throughput 
≥110 
115 
99 
99 
88 
88 
77 
77 
66 
66 
109 
113 
98 
98 
87 
87 
76 
76 
65 
65 
108 
111 
97 
97 
86 
86 
75 
75 
64 
64 
107 
109 
96 
96 
85 
85 
74 
74 
63 
63 
106 
107 
95 
95 
84 
84 
73 
73 
62 
62 
105 
105 
94 
94 
83 
83 
72 
72 
61 
61 
104 
104 
93 
93 
82 
82 
71 
71 
≤60 
60 
103 
103 
92 
92 
81 
81 
70 
70 
 
 
102 
102 
91 
91 
80 
80 
69 
69 
 
 
101 
101 
90 
90 
79 
79 
68 
68 
 
 
100 
100 
89 
89 
78 
78 
67 
67 
 
 
Figure 2.2-4  Mark Throughput Scoring Table 
The SCORE will be used for SLR reporting as shown in Figure 4.1-1.  Mark Throughput will 
be reported on an individual Bureau basis. 
2.2.4 
Future Changes for Throughput/Capacity 
The primary changes for the capacity/throughput service level criterion after TOR are 
threefold: 
(a) 
The yearly changes of the target values for monthly maximum Print 
Set submission (TPmax) and the mark-to-print searches (MPmax) for 
each Bureau 
(b) 
Measurement and scoring of the Scottish Bureaux when they go live 
(c) 
Inclusion  of  Palm  marks  in  mark-to-print  throughput  measurement 
when palm search capability becomes available 
In  addition,  the  throughput  scoring  tables  will  be  extended  to  reflect  a  minimum 
allowable score of 50 by FOC. 
2.2.4.1  Throughput TPmax and MPmax Parameters 
Schedule F, Service Level Requirements 
22 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
As previously described, TPmax and MPmax are key parameters for calculating the 
throughput metrics for Print Set submissions and mark-to-print searches respectively. 
TPmax and MPmax for each Bureau will be calculated for each year using the DOR 
tables specified in Annex A.  In particular, Tables 2.13 and 2.14 will be used for Print 
Sets  submissions.  Figure  2.2-5  below  provides  the  TPmax  table  calculated  for  each 
Bureau for the year 2004 through 2006. 
Schedule F, Service Level Requirements 
23 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
 
Monthly Ten Print Submission (MPmax) 
Bureaux 
Distribution 
2004 
2005 
2006 
1. Avon & Somerset 
2.30% 
5,520 
5,796 
6,072 
2. Bedfordshire 
2.60% 
6,240 
6,552 
6,864 
3. Cambridgeshire 
0.90% 
2,160 
2,268 
2,376 
4. Cheshire 
1.40% 
3,360 
3,528 
3,696 
5. City of London 
0.20% 
480 
504 
528 
6. Cleveland 
1.20% 
2,880 
3,024 
3,168 
7. Cumbria 
1.00% 
2,400 
2,520 
2,640 
8. Derbyshire 
1.40% 
3,360 
3,528 
3,696 
9. Devon & 
2.30% 
5,520 
5,796 
6,072 
Cormwall 
10. Dorset 
0.80% 
1,920 
2,016 
2,112 
11. Durham 
1.20% 
2,880 
3,024 
3,168 
12. Dyfed Powys 
1.30% 
3,120 
3,276 
3,432 
13. Essex 
1.90% 
4,560 
4,788 
5,016 
14. Gloucestershire 
0.80% 
1,920 
2,016 
2,112 
15. Greater 
5.20% 
12,480 
13,104 
13,728 
Manchester 
16. Gwent 
1.20% 
2,880 
3,024 
3,168 
17. Hampshire 
3.50% 
8,400 
8,820 
9,240 
18. Hertfordshire 
1.20% 
2,880 
3,024 
3,168 
19. Humberside 
1.70% 
4,080 
4,284 
4,488 
20. Kent 
2.90% 
6,960 
7,308 
7,656 
21. Lancashire 
2.40% 
5,760 
6,048 
6,336 
22.Leicestershire 
1.10% 
2,640 
2,772 
2,904 
23. Lincolnshire 
0.90% 
2,160 
2,268 
2,376 
24. Merseyside 
2.80% 
6,720 
7,056 
7,392 
25. Metropolitan 
9.30% 
22,320 
23,436 
24,552 
26. Norfolk 
1.10% 
2,640 
2,772 
2,904 
27. North Wales 
1.00% 
2,400 
2,520 
2,640 
Schedule F, Service Level Requirements 
24 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
28. North Yorkshire 
1.00% 
2,400 
2,520 
2,640 
29. 
1.10% 
2,640 
2,772 
2,904 
Northhamptonshire 
30. Northumbria 
4.10% 
9,840 
10,332 
10,824 
31. Nottinghamshire 
2.10% 
5,040 
5,292 
5,544 
32. South Wales 
2.60% 
6,240 
6,552 
6,864 
33. South Yorkshire 
3.00% 
7,200 
7,560 
7,920 
34. Staffordshire 
1.50% 
3,600 
3,780 
3,960 
35. Suffolk 
0.80% 
1,920 
2,016 
2,112 
36. Surrey 
1.00% 
2,400 
2,520 
2,640 
37. Sussex 
1.90% 
4,560 
4,788 
5,016 
38. Thames Valley 
3.00% 
7,200 
7,560 
7,920 
39. Warwickshire 
0.80% 
1,920 
2,016 
2,112 
40. West Mercia 
1.60% 
3,840 
4,032 
4,224 
41. West Midlands 
6.60% 
15,840 
16,632 
17,424 
42. West Yorkshire 
4.40% 
10,560 
11,088 
11,616 
43. Wiltshire 
0.70% 
1,680 
1,764 
1,848 
44. Aberdeen 



45. Dundee 
Included in Glasgow below 



46. Edinburgh 



47. Glasgow 
6.00% 
14,400 
15,120 
15,840 
48. British 
0.60% 
1,440 
1,512 
1,584 
Transport Police 
49. HM Customs & 
0.10% 
240 
252 
264 
Excise 
50. National 
3.50% 
8,400 
8,820 
9,240 
Identification 
Service 
51. National Crime 
 



Squad 
52. Specialist 
 



Crimes Bureau 
Total (Upper 
 
240,000 
252,000 
264,000 
Bound) 
Figure 2.2-5 TPmax per Bureau 
Schedule F, Service Level Requirements 
25 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
To  account  for  minor  variations  from  the  DOR  specified distribution,  starting  in  year  2007, 
TPmax will be based on the actual distribution of the Print Set submissions between bureaux 
measured during a 12 month window in the year prior to the preceding year. For each bureau, 
the  average  monthly  Print  Set  submissions  will  be  calculated.  These  averages  will  then  be 
used to compute the actual distribution between bureaux subject to the constraint that the total 
Print Set submission load is as specified in DOR Table 2.13. 
MPmax for mark-to-print searches are calculated using DOR Tables 2.17, 2.18 and 2.19. The yearly 
values for each bureau are shown in Figure 2.2-6. 
Monthly Mark-to-Print Searches (MPmax) 
Bureaux 
Distribution 
2004 
2005 
2006 
1. Avon & Somerset 
2.60% 
4,872 
5,278 
5,685 
2. Bedfordshire 
2.90% 
5,434 
5,887 
6,341 
3. Cambridgeshire 
1.20% 
2,248 
2,436 
2,624 
4. Cheshire 
0.80% 
1,499 
1,624 
1,749 
5. City of London 
0.10% 
187 
203 
219 
6. Cleveland 
0.70% 
1,312 
1,421 
1,531 
7. Cumbria 
1.30% 
2,436 
2,639 
2,842 
8. Derbyshire 
1.00% 
1,874 
2,030 
2,186 
9. Devon & Cormwall 
1.70% 
3,185 
3,451 
3,717 
10. Dorset 
1.50% 
2,811 
3,045 
3,280 
11. Durham 
0.70% 
1,312 
1,421 
1,531 
12. Dyfed Powys 
1.10% 
2,061 
2,233 
2,405 
13. Essex 
1.40% 
2,623 
2,842 
3,061 
14. Gloucestershire 
1.20% 
2,248 
2,436 
2,624 
15. Greater Manchester 
6.00% 
11,242 
12,181 
13,119 
16. Gwent 
1.10% 
2,061 
2,233 
2,405 
17. Hampshire 
2.50% 
4,684 
5,075 
5,466 
18. Hertfordshire 
1.10% 
2,061 
2,233 
2,405 
19. Humberside 
1.30% 
2,436 
2,639 
2,842 
20. Kent 
2.70% 
5,059 
5,481 
5,904 
21. Lancashire 
3.40% 
6,371 
6,902 
7,434 
22.Leicestershire 
1.40% 
2,623 
2,842 
3,061 
23. Lincolnshire 
0.60% 
1,124 
1,218 
1,312 
Schedule F, Service Level Requirements 
26 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Monthly Mark-to-Print Searches (MPmax) 
Bureaux 
Distribution 
2004 
2005 
2006 
24. Merseyside 
3.30% 
6,183 
6,699 
7,215 
25. Metropolitan 
17.10% 
32,041 
34,715 
37,389 
26. Norfolk 
1.30% 
2,436 
2,639 
2,842 
27. North Wales 
0.90% 
1,686 
1,827 
1,968 
28. North Yorkshire 
0.90% 
1,686 
1,827 
1,968 
29. Northhamptonshire 
1.80% 
3,373 
3,654 
3,936 
30. Northumbria 
1.90% 
3,560 
3,857 
4,154 
31. Nottinghamshire 
1.30% 
2,436 
2,639 
2,842 
32. South Wales 
1.70% 
3,185 
3,451 
3,717 
33. South Yorkshire 
1.10% 
2,061 
2,233 
2,405 
34. Staffordshire 
2.30% 
4,310 
4,669 
5,029 
35. Suffolk 
0.40% 
749 
812 
875 
36. Surrey 
1.10% 
2,061 
2,233 
2,405 
37. Sussex 
2.00% 
3,747 
4,060 
4,373 
38. Thames Valley 
3.30% 
6,183 
6,699 
7,215 
39. Warwickshire 
0.60% 
1,124 
1,218 
1,312 
40. West Mercia 
1.00% 
1,874 
2,030 
2,186 
41. West Midlands 
4.30% 
8,057 
8,729 
9,402 
42. West Yorkshire 
6.50% 
12,179 
13,196 
14,212 
43. Wiltshire 
0.70% 
1,312 
1,421 
1,531 
44. Aberdeen 



Included in Glasgow 
45. Dundee 



below 
46. Edinburgh 



47. Glasgow 
6.50% 
12,179 
13,196 
14,212 
48. British Transport Police 
0.30% 
562 
609 
656 
49. HM Customs & Excise 
0.10% 
187 
203 
219 
50. National Identification 
1.30% 
2,436 
2,639 
2,842 
Service 
51. National Crime Squad 
 



Schedule F, Service Level Requirements 
27 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Monthly Mark-to-Print Searches (MPmax) 
Bureaux 
Distribution 
2004 
2005 
2006 
52. Specialist Crimes 
 



Bureau 
Total (Upper Bound) 
100.00% 
187,374 
203,011 
218,648 
Figure 2.2-6 MPmax per Bureau 
To  account  for  minor  variations  from  the  DOR  specified distribution,  starting  in  year  2007, 
MPmax  will  be  based  on  the  actual  distribution  of  the  Mark  to  Print  searches  between 
bureaux measured during a 12 month window in the year prior to the preceding year. For each 
bureau, the average monthly Mark to Print search load will be calculated. These averages will 
then be used to compute the actual distribution between bureaux subject to the constraint that 
the total Mark to Print search load is as specified by DOR Tables 2.17 and 2.18. Due to the 
changing nature of MPmax and TPmax, CIP will not be applicable to the Throughput service 
level criteria. 
Note that in Figures 2.2-5 and 2.2-6, all Scottish workloads are grouped under Glasgow. Prior 
to the IOC of the Scottish Bureaux, workload allocation to individual bureaux will be defined 
and agreed. 
2.2.4.2  Throughput Buffer Zone 
When a Bureau exceeds its allocation of the workload as defined by these parameters, 
they can continue to process ten prints and submit mark-to-print searches. However, 
to  compensate  for  potential  degradation  in  system  performance,  the  throughput 
metrics  under  these  circumstances  can  exceed  100%  and  the  score  greater  than  the 
target score of 100. To allow for potential variation in bureaux workloads from those 
specified  in  the  DOR,  changes  will  be  made  to  the  throughput  metric  calculation 
equations (equations 2.2-1 of section 2.2.2 and 2.2-2 of section 2.2.3). These changes 
will be effective starting at TOR and are shown below.  

TPc

Equation 2.2-3: 
TPt =  MIN(
×


TPa 1
, . xTP max)
100
1

 
 
 ( ni
M +
i
M +
r
M + Mpni +
pi
M ) 
Equation 2.2-4: 
t
M =  MIN(
×


MPa 1
, . xMP max)
100
1
+ pr
M 
 
Note  that  the  “1.1”  multiplier  for  TPmax  and  MPmax  effectively  provides  a  10% 
buffer  zone  above  the  maximum  Ten  Print  and  Mark  workload  allocated  to  each 
Bureau to account for potential variation in workload distribution. 
2.2.4.3  Scottish Bureaux 
Since the  above  tables include  the  workload  allocations  to the  Scottish  Bureaux,  all 
that  is  needed  when  the  Scottish  Bureaux  become  operational  is  to  start  the 
measurement  and  scoring  using  the  same  throughput  metrics  defined  for  existing 
Bureaux.  
2.2.4.4  Palm Searches 
Schedule F, Service Level Requirements 
28 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Palm marks are part of the total search load specified in Table 2.17 of DOR Annex A 
from  which  the  MPmax  parameter  for  each  Bureau  is  calculated.    Inclusion  of  the 
palm marks in throughput measurement of mark-to-print searches when the capability 
becomes available therefore will not require any changes to the metric. 
2.3 
Search Performance 
System Performance will be measured by the search response time delivered to each Bureau.  
Response time will be measured at the Bureau Segment.  The time will start when the search 
request  is  submitted  by  the  user  and  the  time  will  end  when  the  requested  transaction  is 
available to the user.  This will include image transmission time.   
System performance is dependent on the distribution and type of search requests.  Deviations 
outside  the  ranges  specified  in  this  SLR,  stated  as  MAXIMUM,  will  influence  performance 
levels.  The major influences are: 
(a) 
Variation in inter-transaction arrival rate within a given hour. System performance is 
predicated  on  a  statistical  distribution  of  transactions  within  the  hour.    If  more 
transactions  are  received  than  expected  in  a  specified  period  of  time,  the  system 
response will be slower than expected as the system attempts to process and clear the 
larger than expected queues of transactions. 
(b) 
Variation  in  the  mix  between  Ten  Print  and  Mark  submissions.  Mark  processing 
consumes  more  system  resources  than  Ten  Print  processing.    If  more  Marks  are 
submitted  than  expected  during  a  given  time  period,  system  performance  will 
decrease from nominal. 
(c) 
Variation in the distribution of transaction submissions across the bureaux.  A larger 
than expected number of submissions from a single bureau could exceed the inherent 
capability  of  the  Bureau  Front  End  System  in  terms  of  the  number  of  available 
workstations,  number  of  fingerprint  officers,  and  WAN  bandwidth.    All  of  these 
effects would contribute to a decrease in response performance. 
(d) 
Changes to the nominal search parameters.  The search parameters expected over an 
average  set  of  submissions  have  been  established  (see  Section  5  of this  SLR)  which 
will  result  in  a  set  of  averaged  response  timings.    In  certain  situations,  it  may  be 
desirable for a Bureau to change the nominal values of search parameters in a manner 
that  increases  the  number  of  candidate  respondents.    This  would  slow  system 
response  by  causing  additional  image  retrieval,  transmitting  more  data  over  the 
WAN, and increasing the decompression processing time in the bureau. 
(e) 
Changes  to  the  nominal  assumptions  of  how  work  at  the  bureaux  is  distributed 
amongst  the  system  resources  (primarily  workstations).    The  design  of  the  system 
offers great flexibility in configuring and managing the bureau workload.  However, 
nominal performance is based on the assumption of local work procedures that make 
efficient  use  of  the  system  resources.    Local  work  procedures  may  be  implemented 
that do not fully utilise system resources, and thus have an adverse effect on response 
time for those processes performed at the local bureau. 
System Performance will be measured for each of the four search types: Print-to-Print, Print-
to-Mark,  Mark-to-Print,  and  Mark-to-Mark.  Print-to-Mark  searches  are  performed  on  two 
National  repositories,  the  National  Unidentified  Mark  Collection  and  the  Serious  Crime 
Cache.  These searches are separately measured; the Serious Crime Cache measurements are 
recorded but are unweighted. In addition, within each search type, system performance will be 
presented for each of the three available search priorities: Urgent, Fast, and Normal. Serious 
Schedule F, Service Level Requirements 
29 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Crime  Cache,  Operational  Response,  and  External  Transaction  Bureau  searches  are  all 
submitted  as  Normal  priority.    IND  P-M  searches  have  a  priority  of  Low  and  these  are 
presented in the P-M performance table. 
The expected distribution of search scope by search priority for each search type is defined in 
Section  5  of  this  SLR.    In  the  equations  below,  a  premium  will  be  placed  on  searches 
submitted in excess of the maximum allowed for the search priority. 
2.3.1 
Print-to-Print Performance 
Equation  2.3-1  will  be  used  to  compute  the  PRINT-TO-PRINT  PERFORMANCE 
value for each of the search priorities x within a Print-to-Print search type.  Equation 
2.3-1 will be applied once for each of the search priorities and once for Operational 
Response searches.   
c
X
Equation 2.3-1: 
P − x
P =
×100
a
X
 
where 
(a) 
P-Px  is  the  PRINT-TO-PRINT  PERFORMANCE  value  for  each  search 
priority x: Urgent, Fast, and Normal or Operational Response.   
(b) 
Xc is the number of searches, of the specified priority x, that complete within 
the Target Response Times defined in Figure 2.3-1.  
Search Type 
Category 
Priority 
Target Response 
Time (Mins) 
Print-to-Print 
Central 
Urgent 

 
Central 
Fast 

 
Central 
Normal 

 
ORD 
Normal 

Figure 2.3-1  Print-to-Print Target Response Times 
(c) 
Xa  is  the  actual  number  of  searches,  of  the  specified  priority  x,  that  were 
submitted by the bureau during the accounting period.  If Xa is zero during an 
accounting period, all expressions that include Xa will be set to zero in order 
to avoid undefined mathematical expressions.  
The  PRINT-TO-PRINT  PERFORMANCE  value  for  each  search  priority  and 
Operational Response searches for each Bureau will be computed using Equation 2.3-
1. These values will be presented for information and service analysis purposes. 
Then the OVERALL PRINT-TO-PRINT PERFORMANCE value will be calculated 
and entered in Figure 2.3-2.  This will be calculated by dividing the total number of 
Print-to-Print  searches  that  complete  within  the  Response  Times  defined  in  Figure 
2.3-1, by the total number of Print-to-Print searches submitted during the accounting 
period. 
Schedule F, Service Level Requirements 
30 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Overall 
Print-to-
Print-to-Print 
Print-to-
Print-to- Print-to-
Print-to-Print 
Print 
Bureau 
Urgent Perf. 
Print ORD 
Print 
Print 
Fast Perf. Value  Normal Perf. 
Value 
Perf. Value 
Perf. 
SCORE 
Value 
Value 
Avon + Somerset  
 
 
 
 
 
 
Bedfordshire 
 
 
 
 
 
 
British Transport 
 
 
 
 
 
 
Police 
Cambridgeshire 
 
 
 
 
 
 
Cheshire 
 
 
 
 
 
 
City of London  
 
 
 
 
 
 
Cleveland 
 
 
 
 
 
 
Cumbria 
 
 
 
 
 
 
Customs and Excise 
 
 
 
 
 
 
Derbyshire 
 
 
 
 
 
 
Devon + Cornwall 
 
 
 
 
 
 
Dorset 
 
 
 
 
 
 
Durham 
 
 
 
 
 
 
Dyfed Powys 
 
 
 
 
 
 
Essex 
 
 
 
 
 
 
Gloucestershire 
 
 
 
 
 
 
Greater Manchester 
 
 
 
 
 
 
Gwent 
 
 
 
 
 
 
Hampshire 
 
 
 
 
 
 
Hertfordshire  
 
 
 
 
 
 
Humberside 
 
 
 
 
 
 
Kent 
 
 
 
 
 
 
Lancashire 
 
 
 
 
 
 
Leicestershire 
 
 
 
 
 
 
Lincolnshire 
 
 
 
 
 
 
Schedule F, Service Level Requirements 
31 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Merseyside 
 
 
 
 
 
 
Metropolitan  
 
 
 
 
 
 
N.I.S./Residual 
 
 
 
 
 
 
Bureau 
Norfolk 
 
 
 
 
 
 
North Wales 
 
 
 
 
 
 
North Yorkshire 
 
 
 
 
 
 
Northamptonshire 
 
 
 
 
 
 
Northumbria 
 
 
 
 
 
 
Nottinghamshire  
 
 
 
 
 
 
South Wales  
 
 
 
 
 
 
South Yorkshire  
 
 
 
 
 
 
Staffordshire  
 
 
 
 
 
 
Suffolk 
 
 
 
 
 
 
Surrey 
 
 
 
 
 
 
Sussex  
 
 
 
 
 
 
Thames Valley 
 
 
 
 
 
 
Warwickshire 
 
 
 
 
 
 
West Mercia 
 
 
 
 
 
 
West Midlands 
 
 
 
 
 
 
West Yorkshire 
 
 
 
 
 
 
Wiltshire 
 
 
 
 
 
 
Ext. Transaction 
 
 
 
 
 
 
Bureau 
Figure 2.3-2  Print-to-Print Performance Table 
In the event that no applicable print-to-print searches are processed by the site in the 
reporting period, a fixed performance value of 90 (corresponding to a SCORE of 100) 
shall be applied to the OVERALL PRINT-TO-PRINT PERFORMANCE.  Once the 
OVERALL PRINT-TO-PRINT PERFORMANCE value has been computed for each 
Bureau,  the  SCORE  for  each  Bureau  will  be  selected  from  the  Scoring  Table 
presented  as  Figure  2.3-3.    The  absence  of  searches  of  a  particular  priority  has  no 
effect on the OVERALL SCORE, but will be indicated in the Table with “N/A”. 
Schedule F, Service Level Requirements 
32 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Print-to-Print 
Print-to-Print 
SCORE 
SCORE 
Performance 
Performance 
100 
120 
79 
89 
99.5 
119 
78 
88 
99 
118 
77 
87 
98.5 
117 
76 
86 
98 
116 
75 
85 
97.5 
115 
74 
84 
97 
114 
73 
83 
96.5 
113 
72 
82 
96 
112 
71 
81 
95.5 
111 
70 
80 
95 
110 
69 
79 
94.5 
109 
68 
78 
94 
108 
67 
77 
93.5 
107 
66 
76 
93 
106 
65 
75 
92.5 
105 
64 
74 
92 
104 
63 
73 
91.5 
103 
62 
72 
91 
102 
61 
71 
90.5 
101 
60 
70 
90 
100 
59 
69 
89 
99 
58 
68 
88 
98 
57 
67 
87 
97 
56 
66 
86 
96 
55 
65 
Schedule F, Service Level Requirements 
33 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
85 
95 
54 
64 
84 
94 
53 
63 
83 
93 
52 
62 
82 
92 
51 
61 
81 
91 
≤51 
60 
80 
90 
 
 
Figure 2.3-3  Print-to-Print Performance Scoring Table 
Schedule F, Service Level Requirements 
34 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
The OVERALL PRINT-TO-PRINT PERFORMANCE SCORE will be used for SLR 
reporting as shown in Figure 4.1-1.  Print-to-Print Performance will be reported on an 
individual Bureau basis. 
2.3.2 
Print-to-Mark Performance 
Equation  2.3-2  will  be  used  to  compute  the  PRINT-TO-MARK  PERFORMANCE 
value  for  each  of  the  three  search  priorities  x  within  a  Print-to-Mark  search  type.  
Equation 2.3-2 will be applied once for each of the three search priorities, and once 
for  Operational  Response  searches.    In  addition, a  priority  of  LOW  with  a response 
time of 24 hours supports P-M searches from IND.  All P-M searches from IND will 
be  submitted  with  a  LOW  priority.    Equation  2.3-2  will  be  applied  a  fifth  time  for 
these IND searches. 
c
X
Equation 2.3-2: 
P −
x
M =
×100
a
X
 
where 
(a) 
P-Mx  is  the  PRINT-TO-MARK  PERFORMANCE  value  for  each  search 
priority x: Urgent, Fast, Normal, and Low or Operational Response.   
(b) 
Xc is the number of searches, of the specified search priority x, that complete 
within the Target Response Times as defined in Figure 2.3-4.  
Target Response 
Search Type 
Category 
Priority 
Times 
Print-to-Mark 
Central 
Urgent 
12 minutes 
 
Central 
Fast 
18 minutes 
 
Central 
Normal 
50 minutes 
 
Central 
Low 
24 hours 
 
ORD 
Normal 
12 minutes 
Figure 2.3-4  Print-to-Mark Target Response Times 
(c) 
Xa  is  the  actual  number  of  searches,  of  the  specified  search  priority  x,  that 
were  submitted  by  the  bureau  during  the  accounting  period.    If  Xa  is  zero 
during an accounting period, all expressions that include Xa will be set to zero 
so as to avoid undefined mathematical expressions.   
The  PRINT-TO-MARK  PERFORMANCE  value  for  each  search  priority  for  each 
Bureau  will  be  computed  using  Equation  2.3-2.  These  values  will  be  presented  for 
information  and  service  analysis  purposes.  The  British  Transport  Police  (BTP), 
Customs  and  Excise  Service  (CAE),  and  ETB  Bureaux  may  perform  all  national 
searches rather than the mix of local/regional/national searches indicated in Section 5.  
For these three Bureaux, the Print-to-Mark Performance value will be calculated for 
each search priority using Equation 2.3-3. 
Schedule F, Service Level Requirements 
35 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
c
X
Equation 2.3-3: 
P −
x
M =
×100 +10
a
X
 
In the event that Equation 2.3-3 results in a Performance value greater than 100, the 
Performance value shall be set to 100. 
Then the OVERALL PRINT-TO-MARK PERFORMANCE value will be calculated 
and entered in Figure 2.3-5.  This will be calculated by dividing the total number of 
Print-to-Mark searches of all search priorities and Operational Response searches that 
complete within the Response Times as defined in Figure 2.3-6, by the total number 
of  Print-to-Mark  searches  submitted  during  the  accounting  period.    For  BTP,  CAE, 
and ETB, the Overall Print-to-Mark Performance value will be calculated by dividing 
the  total  number  of  Print-to-Mark  searches  completed  within  the  required  Response 
Times by the total number of Print-to-Mark searches submitted, multiplying by 100, 
and then adding 10. 
Bureau 
Print-to-
Print-to- Print-
Print- Print-to-
Overall 
Print-to-
Mark 
Mark 
to-
to-
Mark 
Print-to-
Mark 
Urgent 
Fast 
Mark 
Mark 
ORD 
Mark Perf. 
SCORE 
Perf. Value 
Perf. 
Normal  Low 
Perf. 
Value 
Value 
Perf. 
Perf. 
Value 
Value 
Value 
Avon + Somerset  
 
 
 
 
 
 
 
Bedfordshire 
 
 
 
 
 
 
 
British Transport 
 
 
 
 
 
 
 
Police 
Cambridgeshire 
 
 
 
 
 
 
 
Cheshire 
 
 
 
 
 
 
 
City of London  
 
 
 
 
 
 
 
Cleveland 
 
 
 
 
 
 
 
Cumbria 
 
 
 
 
 
 
 
Customs and Excise   
 
 
 
 
 
 
Derbyshire 
 
 
 
 
 
 
 
Devon + Cornwall 
 
 
 
 
 
 
 
Dorset 
 
 
 
 
 
 
 
Durham 
 
 
 
 
 
 
 
Dyfed Powys 
 
 
 
 
 
 
 
Essex 
 
 
 
 
 
 
 
Schedule F, Service Level Requirements 
36 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Bureau 
Print-to-
Print-to- Print-
Print- Print-to-
Overall 
Print-to-
Mark 
Mark 
to-
to-
Mark 
Print-to-
Mark 
Urgent 
Fast 
Mark 
Mark 
ORD 
Mark Perf. 
SCORE 
Perf. Value 
Perf. 
Normal  Low 
Perf. 
Value 
Value 
Perf. 
Perf. 
Value 
Value 
Value 
Gloucestershire 
 
 
 
 
 
 
 
Greater Manchester 
 
 
 
 
 
 
 
Gwent 
 
 
 
 
 
 
 
Hampshire 
 
 
 
 
 
 
 
Hertfordshire  
 
 
 
 
 
 
 
Humberside 
 
 
 
 
 
 
 
Kent 
 
 
 
 
 
 
 
Lancashire 
 
 
 
 
 
 
 
Leicestershire 
 
 
 
 
 
 
 
Lincolnshire 
 
 
 
 
 
 
 
Merseyside 
 
 
 
 
 
 
 
Metropolitan  
 
 
 
 
 
 
 
N.I.S./Residual 
 
 
 
 
 
 
 
Bureau 
Norfolk 
 
 
 
 
 
 
 
North Wales 
 
 
 
 
 
 
 
North Yorkshire 
 
 
 
 
 
 
 
Northamptonshire 
 
 
 
 
 
 
 
Northumbria 
 
 
 
 
 
 
 
Nottinghamshire  
 
 
 
 
 
 
 
South Wales  
 
 
 
 
 
 
 
South Yorkshire  
 
 
 
 
 
 
 
Staffordshire  
 
 
 
 
 
 
 
Suffolk 
 
 
 
 
 
 
 
Schedule F, Service Level Requirements 
37 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Bureau 
Print-to-
Print-to- Print-
Print- Print-to-
Overall 
Print-to-
Mark 
Mark 
to-
to-
Mark 
Print-to-
Mark 
Urgent 
Fast 
Mark 
Mark 
ORD 
Mark Perf. 
SCORE 
Perf. Value 
Perf. 
Normal  Low 
Perf. 
Value 
Value 
Perf. 
Perf. 
Value 
Value 
Value 
Surrey 
 
 
 
 
 
 
 
Sussex  
 
 
 
 
 
 
 
Thames Valley 
 
 
 
 
 
 
 
Warwickshire 
 
 
 
 
 
 
 
West Mercia 
 
 
 
 
 
 
 
West Midlands 
 
 
 
 
 
 
 
West Yorkshire 
 
 
 
 
 
 
 
Wiltshire 
 
 
 
 
 
 
 
Ext. Transaction 
 
 
 
 
 
 
 
Bureau 
Figure 2.3-5  Print-to-Mark Performance Table 
In the event that no applicable print-to-mark searches are processed by the site in the reporting period, 
a fixed performance value of 90 (corresponding to a SCORE of 100) shall be applied to the 
OVERALL PRINT-TO-MARK PERFORMANCE. This shall also apply to the BTP, CAE, and ETB 
bureaux. Once the OVERALL PRINT-TO-MARK PERFORMANCE value has been computed for 
each Bureau, the SCORE for each Bureau will be selected from the Scoring Table presented as Figure 
2.3-1.  The absence of searches of a particular priority has no effect on the OVERALL SCORE, but 
will be indicated in the Table with “N/A”.  
Print-to-Mark 
Print-to-Mark 
Print-to-Mark 
SCORE 
SCORE 
SCORE 
Performance 
Performance 
Performance 
100 
120 
89 
99 
68 
78 
99.5 
119 
88 
98 
67 
77 
99 
118 
87 
97 
66 
76 
98.5 
117 
86 
96 
65 
75 
98 
116 
85 
95 
64 
74 
97.5 
115 
84 
94 
63 
73 
97 
114 
83 
93 
62 
72 
96.5 
113 
82 
92 
61 
71 
Schedule F, Service Level Requirements 
38 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
96 
112 
81 
91 
60 
70 
95.5 
111 
80 
90 
59 
69 
95 
110 
79 
89 
58 
68 
94.5 
109 
78 
88 
57 
67 
94 
108 
77 
87 
56 
66 
93.5 
107 
76 
86 
55 
65 
93 
106 
75 
85 
54 
64 
92.5 
105 
74 
84 
53 
63 
92 
104 
73 
83 
52 
62 
91.5 
103 
72 
82 
51 
61 
91 
102 
71 
81 
<51 
60 
90.5 
101 
70 
80 
 
 
90 
100 
69 
79 
 
 
Figure 2.3-6  Print-to-Mark Performance Scoring Table 
Schedule F, Service Level Requirements 
39 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
The PRINT-TO-MARK PERFORMANCE SCORE will be used for SLR reporting as shown 
in Figure 4.1-1.  Print-to-Mark Performance will be reported on an individual Bureau basis. 
2.3.3 
Print-to-Mark Serious Crime Cache Performance 
Print to Mark Serious Crime Cache performance is reported but does not contribute to 
the SLR Scoring from the milestone TOR – NAFIS onwards.   
Equation  2.3-4  will  be  used  to  compute  the  PRINT-TO-MARK  PERFORMANCE 
value for the Print-to-Mark Serious Crime Cache search type.  
Equation 
P − M =
c
X
x
×100
2.3-4: 
a
X
 
where 
(a) 
P-Mx 
is 
the 
PRINT-TO-MARK 
SERIOUS 
CRIME 
CACHE 
PERFORMANCE value.   
(b) 
Xc is the number of searches that complete within the Target Response Times 
as  defined in Figure  2.3-7.  All  Print-to-Mark  Serious  Crime  Cache  searches 
are submitted as Normal priority. 
(c) 
Xa is the actual number of searches that were submitted by the bureau during 
the  accounting  period.    If  Xa  is  zero  during  an  accounting  period,  all 
expressions  that  include  Xa  will  be  set  to  zero  so  as  to  avoid  undefined 
mathematical expressions.   
Search Type 
Priority 
Target Response Times 
Print-to-Mark Serious 
Normal 
8 minutes 
Crime Cache 
 
 
 
 
 
 
Figure 2.3-7  Print-to-Mark Serious Crime Cache Target Response Time 
The PRINT-TO-MARK SERIOUS CRIME CACHE PERFORMANCE value for each Bureau will be 
computed using Equation 2.3-4. These values will be presented for information and service analysis 
purposes. 
Then the OVERALL PRINT-TO-MARK SERIOUS CRIME CACHE PERFORMANCE value will 
be calculated and entered in Figure 2.3-8.  This will be calculated by dividing the total number of 
Print-to-Mark Serious Crime Cache searches that complete within the Response Times as defined in 
Figure 2.3-8, by the total number of Print-to-Mark Serious Crime Cache searches submitted during 
the accounting period.  
 
Schedule F, Service Level Requirements 
40 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Bureau 
Print-to-Mark Serious 
Bureau 
Print-to-Mark Serious 
Crime Cache Normal 
Crime Cache Normal 
Perf. Value 
Perf. Value 
Avon + Somerset  
 
Metropolitan  
 
Bedfordshire 
 
 

British Transport 
 
N.I.S./Residual 
 
Police 
Bureau 
Cambridgeshire 
 
Norfolk 
 
Cheshire 
 
North Wales 
 
City of London  
 
North Yorkshire 
 
Cleveland 
 
Northamptonshire 
 
Cumbria 
 
Northumbria 
 
Customs and Excise   
Nottinghamshire  
 
Derbyshire 
 
South Wales  
 
Devon + Cornwall 
 
South Yorkshire  
 
Dorset 
 
Staffordshire  
 
Durham 
 
Suffolk 
 
Dyfed Powys 
 
Surrey 
 
Essex 
 
Sussex  
 
Gloucestershire 
 
Thames Valley 
 
Greater Manchester 
 
Warwickshire 
 
Gwent 
 
West Mercia 
 
Hampshire 
 
West Midlands 
 
Hertfordshire  
 
West Yorkshire 
 
Humberside 
 
Wiltshire 
 
Kent 
 
Ext. Transaction 
 
Bureau 
Lancashire 
 
Figure 2.3-8  Print-to-Mark Performance 
Leicestershire 
 
Serious Crime Cache Table 
Lincolnshire 
 
 
Merseyside 
 
Schedule F, Service Level Requirements 
41 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
In the event that no applicable print-to-mark serious crime cache searches are processed by the site in 
the reporting period, a fixed performance value of 90 shall be applied to the OVERALL PRINT-TO-
MARK SERIOUS CRIME CACHE PERFORMANCE.   
2.3.4 
Mark-to-Print Performance 
Equation  2.3-5  will  be  used  to  compute  the  MARK-TO-PRINT  PERFORMANCE 
value  for  each  of  the  three  search  priorities  x  within  a  Mark-to-Print  search  type.  
Equation 2.3-5 will be applied four times, once for each of the three search priorities, 
and once for Operational Response searches.   
c
X
Equation 2.3-5: 
M − x
P =
×100
a
X
 
where 
(a) 
M-Px  is  the  MARK-TO-PRINT  PERFORMANCE  value  for  each  search 
priority x: Urgent, Fast, and Normal or Operational Response.   
(b) 
Xc is the number of searches, of the specified search priority x, that complete 
within the Target Response Times as defined in Figure 2.3-9.   
Target Response 
Search Type 
Category 
Priority 
Times 
Mark-to-Print 
Central 
Urgent 
6 minutes 
 
Central 
Fast 
10 minutes 
 
Central 
Normal 
20 minutes 
 
ORD 
Normal 
10 minutes 
Figure 2.3-9  Mark-to-Print Target Response Times 
(c) 
Xa  is  the  actual  number  of  searches,  of  the  specified  search  priority  x,  that 
were  submitted  by  the  bureau  during  the  accounting  period.    If  Xa  is  zero 
during an accounting period, all expressions that include Xa will be set to zero 
so as to avoid undefined mathematical expressions.   
The  MARK-TO-PRINT  PERFORMANCE  value  for  each  search  priority  for  each 
Bureau  will  be  computed  using  Equation  2.3-5.  These  values  will  be  presented  for 
information  and  service  analysis  purposes.  The  British  Transport  Police  (BTP)  and 
Customs and Excise (CAE) Bureaux may perform all national searches rather than the 
mix  of  local/regional/national  searches  indicated  in  Section  5.    For  these  two 
Bureaux,  the  Mark-to-Print  Performance  value  will  be  calculated  for  each  search 
priority using Equation 2.3-6. 
c
X
Equation 2.3-6: 
M − x
P =
×100 +10
a
X
 
In the event that Equation 2.3-6 results in a Performance value greater than 100, the 
Performance value shall be set to 100. 
Schedule F, Service Level Requirements 
42 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Then the OVERALL MARK-TO-PRINT PERFORMANCE value will be calculated 
and entered in Figure 2.3-10.  This will be calculated by dividing the total number of 
Mark-to-Print searches of all search priorities and Operational Response searches that 
complete within the Response Times defined in Figure 2.3-9, by the total number of 
Mark-to-Print searches submitted during the accounting period.  For BTP & CAE, the 
Overall  Mark-to-Print  Performance  value  will  be  calculated  by  dividing  the  total 
number of Mark-to-Print searches completed within the required Response Times by 
the  total  number  of  Mark-to-Print  searches  submitted,  multiplying  by  100,  and  then 
adding 10. 
Overall 
Mark-to-
Mark-to-Print  Mark-to-Print 
Mark-to-
Mark-
Mark-
Print 
Bureau 
Urgent Perf. 
Fast Perf. 
Print ORD  to-Print  to-Print 
Normal Perf. 
Value 
Value 
Perf. Value 
Perf. 
SCORE 
Value 
Value 
Avon + Somerset  
 
 
 
 
 
 
Bedfordshire 
 
 
 
 
 
 
British Transport 
 
 
 
 
 
 
Police 
Cambridgeshire 
 
 
 
 
 
 
Cheshire 
 
 
 
 
 
 
City of London  
 
 
 
 
 
 
Cleveland 
 
 
 
 
 
 
Cumbria 
 
 
 
 
 
 
Customs and Excise   
 
 
 
 
 
Derbyshire 
 
 
 
 
 
 
Devon + Cornwall   
 
 
 
 
 
Dorset 
 
 
 
 
 
 
Durham 
 
 
 
 
 
 
Dyfed Powys 
 
 
 
 
 
 
Essex 
 
 
 
 
 
 
Gloucestershire 
 
 
 
 
 
 
Greater Manchester   
 
 
 
 
 
Gwent 
 
 
 
 
 
 
Schedule F, Service Level Requirements 
43 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Overall 
Mark-to-
Mark-to-Print  Mark-to-Print 
Mark-to-
Mark-
Mark-
Print 
Bureau 
Urgent Perf. 
Fast Perf. 
Print ORD  to-Print  to-Print 
Normal Perf. 
Value 
Value 
Perf. Value 
Perf. 
SCORE 
Value 
Value 
Hampshire 
 
 
 
 
 
 
Hertfordshire  
 
 
 
 
 
 
Humberside 
 
 
 
 
 
 
Kent 
 
 
 
 
 
 
Lancashire 
 
 
 
 
 
 
Leicestershire 
 
 
 
 
 
 
Lincolnshire 
 
 
 
 
 
 
Merseyside 
 
 
 
 
 
 
Metropolitan  
 
 
 
 
 
 
N.I.S./Residual 
 
 
 
 
 
 
Bureau 
Norfolk 
 
 
 
 
 
 
North Wales 
 
 
 
 
 
 
North Yorkshire 
 
 
 
 
 
 
Northamptonshire 
 
 
 
 
 
 
Northumbria 
 
 
 
 
 
 
Nottinghamshire  
 
 
 
 
 
 
South Wales  
 
 
 
 
 
 
South Yorkshire  
 
 
 
 
 
 
Staffordshire  
 
 
 
 
 
 
Suffolk 
 
 
 
 
 
 
Surrey 
 
 
 
 
 
 
Sussex  
 
 
 
 
 
 
Thames Valley 
 
 
 
 
 
 
Schedule F, Service Level Requirements 
44 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Overall 
Mark-to-
Mark-to-Print  Mark-to-Print 
Mark-to-
Mark-
Mark-
Print 
Bureau 
Urgent Perf. 
Fast Perf. 
Print ORD  to-Print  to-Print 
Normal Perf. 
Value 
Value 
Perf. Value 
Perf. 
SCORE 
Value 
Value 
Warwickshire 
 
 
 
 
 
 
West Mercia 
 
 
 
 
 
 
West Midlands 
 
 
 
 
 
 
West Yorkshire 
 
 
 
 
 
 
Wiltshire 
 
 
 
 
 
 
Ext. Transaction 
 
 
 
 
 
 
Bureau 
Figure 2.3-10  Mark-to-Print Performance Table 
Schedule F, Service Level Requirements 
45 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
In the event that no applicable mark-to-print searches are processed by the site in the 
reporting period, a fixed performance value of 90 (corresponding to a SCORE of 100) 
shall be applied to OVERALL MARK-TO-PRINT PERFORMANCE. This shall also 
apply to the BTP and CAE Bureaux  IND is not expected to submit any Mark-to-Print 
searches  and  the  ETB  SCORE  will  be  set  to  a  performance  value  of  90 
(corresponding  to  a  SCORE  of  100).  Once  the  OVERALL  MARK-TO-PRINT 
PERFORMANCE  value  has  been  computed  for  each  Bureau,  the  SCORE  for  each 
Bureau  will  be  selected  from  the  Scoring  Table  presented  as  Figure  2.3-11.    The 
absence of searches of a particular priority has no effect on the OVERALL SCORE, 
but will be indicated in the Table with “N/A”.   
Mark-to-Print 
Mark-to-Print 
Mark-to-Print 
SCORE 
SCORE 
SCORE 
Performance 
Performance 
Performance 
100 
120 
89 
99 
68 
78 
99.5 
119 
88 
98 
67 
77 
99 
118 
87 
97 
66 
76 
98.5 
117 
86 
96 
65 
75 
98 
116 
85 
95 
64 
74 
97.5 
115 
84 
94 
63 
73 
97 
114 
83 
93 
62 
72 
96.5 
113 
82 
92 
61 
71 
96 
112 
81 
91 
60 
70 
95.5 
111 
80 
90 
59 
69 
95 
110 
79 
89 
58 
68 
94.5 
109 
78 
88 
57 
67 
94 
108 
77 
87 
56 
66 
93.5 
107 
76 
86 
55 
65 
93 
106 
75 
85 
54 
64 
92.5 
105 
74 
84 
53 
63 
92 
104 
73 
83 
52 
62 
91.5 
103 
72 
82 
51 
61 
91 
102 
71 
81 
(51 
60 
90.5 
101 
70 
80 
 
 
90 
100 
69 
79 
 
 
Figure 2.3-11  Mark-to-Print Performance Scoring Table 
Schedule F, Service Level Requirements 
46 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
The MARK-TO-PRINT PERFORMANCE SCORE will be used for SLR reporting as 
shown in Figure 4.1-1.  Mark-to-Print Performance will be reported on an individual 
Bureau basis. 
2.3.5 
Mark-to-Mark Performance 
Equation  2.3-7  will  be  used  to  compute  the  MARK-TO-MARK  PERFORMANCE 
value  for  each  of  the  three  search  priorities  x  within  a  Mark-to-Mark  search  type.  
Equation 2.3-7 will be applied four times, once for each of the three search priorities, 
and once for Operational Response searches.   
c
X
Equation 2.3-7: 
M −
x
M =
×100
a
X
 
where 
(a) 
M-Mx  is  the  MARK-TO-MARK  PERFORMANCE  value  for  each  search 
priority x: Urgent, Fast, and Normal or Operational Response.   
(b) 
Xc, is the number of searches, of the specified search priority x, that complete 
within the Target Response Times defined in Figure 2.3-12.   
Target response 
Search Type 
Category 
Priority 
times 
Mark-to-Mark 
Central 
Urgent 
3 minutes 
 
Central 
Fast 
7 minutes 
 
Central 
Normal 
20 minutes 
 
ORD 
Normal 
10 minutes 
Figure 2.3-12  Mark-to-Mark Target Response Times 
(c) 
Xa  is  the  actual  number  of  searches,  of  the  specified  search  priority  x,  that 
were  submitted  by  the  bureau  during  the  accounting  period.    If  Xa  is  zero 
during an accounting period, all expressions that include Xa will be set to zero 
so as to avoid undefined mathematical expressions.   
The  MARK-TO-MARK  PERFORMANCE  value  for  each  search  priority  for  each 
Bureau  will  be  computed  using  Equation  2.3-7.  These  values  will  be  presented  for 
information  and  service  analysis  purposes.  The  British  Transport  Police  (BTP)  and 
Customs and Excise (CAE) Bureaux may perform all national searches rather than the 
mix  of  local/regional/national  searches  indicated  in  Section  5.    For  these  two 
Bureaux,  the  Mark-to-Mark  Performance  value  will  be  calculated  for  each  search 
priority using Equation .2.3.8. 
c
X
Equation 2.3-8: 
M −
x
M =
×100 +10
a
X
 
In the event that Equation 2.3-8 results in a Performance value greater than 100, the 
Performance value shall be set to 100. 
Schedule F, Service Level Requirements 
47 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Then the OVERALL MARK-TO-MARK PERFORMANCE value will be calculated 
and entered in Figure 2.3-13.  This will be calculated by dividing the total number of 
Mark-to-Mark  searches  of  all  search  priorities  and  Operational  Response  searches 
that  complete  within  the  Response  Times  as  defined  in  Figure  2.3-12,  by  the  total 
number of Mark-to-Mark searches submitted during the accounting period. For BTP 
& CE the Overall Mark-to-Mark Performance value will be calculated by dividing the 
total  number  of  Mark-to-Mark  searches  completed  within  the  required  Response 
Times by the total number of Mark-to-Mark searches submitted, multiplying by 100, 
and then adding 10. 
Overall 
Mark-to-
Mark-to-
Mark-to-
Mark-
Marl-to-
Mark-to-Mark 
Mark 
Mark 
Bureau 
Mark Urgent 
to-Mark  Mark 
Fast Perf. 
Normal Perf.  ORD Perf. 
Perf. Value 
Perf. 
SCORE 
Value 
Value 
Value 
Value 
Avon + Somerset  
 
 
 
 
 
 
Bedfordshire 
 
 
 
 
 
 
British Transport 
 
 
 
 
 
 
Police 
Cambridgeshire 
 
 
 
 
 
 
Cheshire 
 
 
 
 
 
 
City of London  
 
 
 
 
 
 
Cleveland 
 
 
 
 
 
 
Cumbria 
 
 
 
 
 
 
Customs and Excise   
 
 
 
 
 
Derbyshire 
 
 
 
 
 
 
Devon + Cornwall   
 
 
 
 
 
Dorset 
 
 
 
 
 
 
Durham 
 
 
 
 
 
 
Dyfed Powys 
 
 
 
 
 
 
Essex 
 
 
 
 
 
 
Gloucestershire 
 
 
 
 
 
 
Greater Manchester   
 
 
 
 
 
Gwent 
 
 
 
 
 
 
Schedule F, Service Level Requirements 
48 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Overall 
Mark-to-
Mark-to-
Mark-to-
Mark-
Marl-to-
Mark-to-Mark 
Mark 
Mark 
Bureau 
Mark Urgent 
to-Mark  Mark 
Fast Perf. 
Normal Perf.  ORD Perf. 
Perf. Value 
Perf. 
SCORE 
Value 
Value 
Value 
Value 
Hampshire 
 
 
 
 
 
 
Hertfordshire  
 
 
 
 
 
 
Humberside 
 
 
 
 
 
 
Kent 
 
 
 
 
 
 
Lancashire 
 
 
 
 
 
 
Leicestershire 
 
 
 
 
 
 
Lincolnshire 
 
 
 
 
 
 
Merseyside 
 
 
 
 
 
 
Metropolitan  
 
 
 
 
 
 
N.I.S./Residual 
 
 
 
 
 
 
Bureau 
Norfolk 
 
 
 
 
 
 
North Wales 
 
 
 
 
 
 
North Yorkshire 
 
 
 
 
 
 
Northamptonshire 
 
 
 
 
 
 
Northumbria 
 
 
 
 
 
 
Nottinghamshire  
 
 
 
 
 
 
South Wales  
 
 
 
 
 
 
South Yorkshire  
 
 
 
 
 
 
Staffordshire  
 
 
 
 
 
 
Suffolk 
 
 
 
 
 
 
Surrey 
 
 
 
 
 
 
Sussex  
 
 
 
 
 
 
Thames Valley 
 
 
 
 
 
 
Schedule F, Service Level Requirements 
49 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Overall 
Mark-to-
Mark-to-
Mark-to-
Mark-
Marl-to-
Mark-to-Mark 
Mark 
Mark 
Bureau 
Mark Urgent 
to-Mark  Mark 
Fast Perf. 
Normal Perf.  ORD Perf. 
Perf. Value 
Perf. 
SCORE 
Value 
Value 
Value 
Value 
Warwickshire 
 
 
 
 
 
 
West Mercia 
 
 
 
 
 
 
West Midlands 
 
 
 
 
 
 
West Yorkshire 
 
 
 
 
 
 
Wiltshire 
 
 
 
 
 
 
Ext. Transaction 
 
 
 
 
 
 
Bureau 
Figure 2.3-13  Mark-to-Mark Performance Table 
In the event that no applicable mark-to-mark searches are processed by the site in the 
reporting period, a fixed performance value of 90 (corresponding to a SCORE of 100) 
shall be applied to OVERALL MARK-TO-MARK PERFORMANCE VALUE. This 
shall  also  apply  to  the  BTP  and  CAE  Bureaux.  IND  is  not  expected  to  submit  any 
Mark-to-Mark searches and the ETB SCORE will be set to a performance value of 90 
(corresponding  to  a  SCORE  of  100).    Once  the  OVERALL  MARK-TO-MARK 
PERFORMANCE  value  has  been  computed  for  each  Bureau,  the  SCORE  for  each 
Bureau  will  be  selected  from  the  Scoring  Table  presented  as  Figure  2.3-14.    The 
absence of searches of a particular priority has no effect on the OVERALL SCORE, 
but will be indicated in the Table with “N/A”.   
Mark-to-Mark 
Mark-to-Mark 
Mark-to-Mark 
SCORE 
SCORE 
SCORE 
Performance 
Performance 
Performance 
100 
120 
89 
99 
68 
78 
99.5 
119 
88 
98 
67 
77 
99 
118 
87 
97 
66 
76 
98.5 
117 
86 
96 
65 
75 
98 
116 
85 
95 
64 
74 
97.5 
115 
84 
94 
63 
73 
97 
114 
83 
93 
62 
72 
96.5 
113 
82 
92 
61 
71 
96 
112 
81 
91 
60 
70 
Schedule F, Service Level Requirements 
50 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
95.5 
111 
80 
90 
59 
69 
95 
110 
79 
89 
58 
68 
94.5 
109 
78 
88 
57 
67 
94 
108 
77 
87 
56 
66 
93.5 
107 
76 
86 
55 
65 
93 
106 
75 
85 
54 
64 
92.5 
105 
74 
84 
53 
63 
92 
104 
73 
83 
52 
62 
91.5 
103 
72 
82 
51 
61 
91 
102 
71 
81 
<51 
60 
90.5 
101 
70 
80 
 
 
90 
100 
69 
79 
 
 
Figure 2.3-14  Mark-to-Mark Performance Scoring Table 
The MARK-TO-MARK PERFORMANCE SCORE will be used for SLR reporting as 
shown in Figure 4.1-1.  Mark-to-Mark Performance will be reported on an individual 
Bureau basis. 
2.3.6 
Quoted CRO Image Retrieval 
Equation  2.3-9  will  be  used  to  compute  the  QUOTED  CRO  IMAGE  RETRIEVAL 
PERFORMANCE value.  Quoted CRO Image Retrievals are not like AFR searches in 
that no AFR Search of the Central Data Bases is required.  Instead, the user’s request 
for  image  data,  as  requested  as  the  result  of  a  receipt  of  a  Quoted  CRO  Ten  Print 
form,  initiates  the  transaction.    The  QUOTED  CRO  IMAGE  RETRIEVAL 
PERFORMANCE equation shown in Equation 2.3-9 does not include provisions for 
retrievals based on priority. 
Within  IDENT1,  the  Quoted  CRO  Image  Retrieval  Transaction  will  start  when  the 
user “accepts” the transaction at the end of Demographic Data Check (to include the 
Quoted CRO entered into the screen by the user).  The transaction will end when the 
image  data  is  available  on the  Bureau  Server.    At  this  point,  the  user  may  view  the 
data.   
Schedule F, Service Level Requirements 
51 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Equation 2.3-9 will be applied once.  
c
X
Equation 2.3-9: 
QUOTED =
×100
a
X
 
where 
(a) 
QUOTED  is  the  QUOTED  CRO  IMAGE  RETRIEVAL    PERFORMANCE 
value.  
(b) 
Xc, is the number of Quoted CRO Image Retrieval transactions that complete 
within the Target Response Times as defined in Figure 2.3-15.   
Target Response Times 
Search Type 
(seconds) 
Quoted CRO 
60 
Figure 2.3-15  Quoted CRO Image Retrieval Target Response Times 
(c) 
Xa  is  the  actual  number  of  Quoted  CRO  Image  Retrieval  transactions  that 
were  submitted  by  the  bureau  during  the  accounting  period.    If  Xa  is  zero 
during an accounting period, all expressions that include Xa will be set to zero 
so as to avoid undefined mathematical expressions.   
The QUOTED CRO IMAGE RETRIEVAL PERFORMANCE value for each Bureau 
will be computed using Equation 2.3-9.  This value will be placed in Figure 2.3-16.  
QUOTED CRO IMAGE 
QUOTED CRO IMAGE 
Bureau 
RETRIEVAL  
RETRIEVAL 
PERFORMANCE VALUE 
PERFORMANCE SCORE 
Avon + Somerset  
 
 
Bedfordshire 
 
 
British Transport Police 
 
 
Cambridgeshire 
 
 
Cheshire 
 
 
City of London  
 
 
Cleveland 
 
 
Customs and Excise 
 
 
Cumbria 
 
 
Derbyshire 
 
 
Devon + Cornwall 
 
 
Schedule F, Service Level Requirements 
52 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
QUOTED CRO IMAGE 
QUOTED CRO IMAGE 
Bureau 
RETRIEVAL  
RETRIEVAL 
PERFORMANCE VALUE 
PERFORMANCE SCORE 
Dorset 
 
 
Durham 
 
 
Dyfed Powys 
 
 
Essex 
 
 
Gloucestershire 
 
 
Greater Manchester 
 
 
Gwent 
 
 
Hampshire 
 
 
Hertfordshire  
 
 
Humberside 
 
 
Kent 
 
 
Lancashire 
 
 
Leicestershire 
 
 
Lincolnshire 
 
 
Merseyside 
 
 
Metropolitan  
 
 
N.I.S./Residual Bureau 
 
 
Norfolk 
 
 
North Wales 
 
 
North Yorkshire 
 
 
Northamptonshire 
 
 
Northumbria 
 
 
Nottinghamshire  
 
 
South Wales  
 
 
South Yorkshire  
 
 
Schedule F, Service Level Requirements 
53 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
QUOTED CRO IMAGE 
QUOTED CRO IMAGE 
Bureau 
RETRIEVAL  
RETRIEVAL 
PERFORMANCE VALUE 
PERFORMANCE SCORE 
Staffordshire  
 
 
Suffolk 
 
 
Surrey 
 
 
Sussex  
 
 
Thames Valley 
 
 
Warwickshire 
 
 
West Mercia 
 
 
West Midlands 
 
 
West Yorkshire 
 
 
Wiltshire 
 
 
Ext. Transaction Bureau 
 
 
Figure 2.3-16  Quoted CRO Performance Table 
In the event that no applicable quoted CRO image retrievals are processed by the site 
in  the  reporting  period,  a  fixed  SCORE  of  100  shall  be  applied  to  QUOTED  CRO 
IMAGE RETRIEVAL PERFORMANCE VALUE. This shall also apply to the BTP, 
CAE  and  ETB  Bureaux.  Once  the  QUOTED  CRO  IMAGE  RETRIEVAL 
PERFORMANCE  value  has  been  computed  for  each  Bureau,  the  SCORE  for  each 
Bureau will be selected from the Scoring Table presented as Figure 2.3-17.   
Schedule F, Service Level Requirements 
54 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
QUOTED 
QUOTED 
QUOTED 
SCORE 
SCORE 
SCORE 
Performance 
Performance 
Performance 
100 
120 
89 
99 
68 
78 
99.5 
119 
88 
98 
67 
77 
99 
118 
87 
97 
66 
76 
98.5 
117 
86 
96 
65 
75 
98 
116 
85 
95 
64 
74 
97.5 
115 
84 
94 
63 
73 
97 
114 
83 
93 
62 
72 
96.5 
113 
82 
92 
61 
71 
96 
112 
81 
91 
60 
70 
95.5 
111 
80 
90 
59 
69 
95 
110 
79 
89 
58 
68 
94.5 
109 
78 
88 
57 
67 
94 
108 
77 
87 
56 
66 
93.5 
107 
76 
86 
55 
65 
93 
106 
75 
85 
54 
64 
92.5 
105 
74 
84 
53 
63 
92 
104 
73 
83 
52 
62 
91.5 
103 
72 
82 
51 
61 
91 
102 
71 
81 
<51 
60 
90.5 
101 
70 
80 
 
 
90 
100 
69 
79 
 
 
Figure 2.3-17  Quoted CRO Image Retrieval Performance Scoring Table 
The QUOTED CRO IMAGE RETRIEVAL PERFORMANCE SCORE will be used 
for  SLR  reporting  as  shown  in  Figure  4.1-1.    Quoted  CRO  Image  Retrieval 
Performance will be reported on an individual Bureau basis. 
2.3.7 
Future Changes for Search Response Time 
There  are  several  changes  for  the  response  time  service  level  criteria  after  TOR. 
Schedule F, Service Level Requirements 
55 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
These  changes  are  described  below.  Response  time  measurements  for  marks  (using 
existing  metrics) will include palm marks when the palm search capability becomes 
operational. 
2.3.7.1  Improved Target Response Times 
In  addition  to  the  significantly  improved  TOR  target  response  times  (vs  NAFIS) 
specified in the previous sections, faster target response times for most search types 
will  be  implemented  for  FOC  and  FOC+3  to  provide  continuing  incremental 
improvements.  These  90  percentile  target  values  are  summarised  in  Figure  2.3-18. 
Note that due to the fast response times, the Fast priority has been eliminated. 
In addition, a new search priority category for searches that can take advantage of the 
off-peak  processing  capacity  may  be  introduced  if  agreed  by  the  Authority  and 
Contractor. 
90% Target Response 
Database 
Time (Minutes) 
Search Type 
Category 
Priority 
Penetration 
FOC 
FOC+3 
Print-to-Print  
100% 
Central 
Urgent 


 
 
Central 
Normal 


 
 
ORD 
Normal 


Print-to-Mark 
100% 
Central 
Urgent 
30 
22 
 
 
Central 
Normal 
40 
30 
 
 
ORD 
Normal 
10 

Finger Mark-to-Print 
100% for 15% of 
Central 
Urgent 


searches and 30% 
for 85% of searches 
 
 
Central 
Normal 
15 
11 
 
 
ORD 
Normal 


Palm Mark-to-Print 
100% for 15% of 
Central 
Urgent 
15 
12 
searches and 30% 
for 85% of searches 
 
≤ 30% 
Central 
Normal 
15 
12 
 
 
ORD 
Normal 


 
> 30% and ≤ 100% 
Central 
Normal 
45 
36 
for up to 15% of 
searches 
 
 
ORD 
Normal 
15 
10 
Schedule F, Service Level Requirements 
56 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Mark-to-Mark 
 
100% 
 
Central 
Urgent 


 
 
Central 
Normal 
10 

 
 
ORD 
Normal 


Figure 2.3-18   90% Target Response Times at FOC and FOC+3 
Note  that  faster  response  times  for  searches  against  the  ORD  can  be  obtained  with 
optional upgrade of the Bureau search capacity. 
2.3.7.2  Average Response Time 
To complement the 90 percentile response time metrics, average response times will 
also  be  measured  and  scored  starting  at  FOC.  Figure  2.3-19  provides  the  initial 
average response time target values for FOC and FOC+3 years.  
Average Target 
Response Time 
Database 
Search Type 
Category 
Priority 
(Minutes) 
Penetration 
FOC 
FOC+3 
Print-to-Print  
100% 
Central 
Urgent 
1.5 
1.2 
 
 
Central 
Normal 
2.5 
2.0 
 
 
ORD 
Normal 
2.5 
2.0 
Print-to-Mark 
100% 
Central 
Urgent 
20 
15 
 
 
Central 
Normal 
30 
22 
 
 
ORD 
Normal 
7.5 

Finger Mark-to-Print 
100% for 15% of 
Central 
Urgent 


searches and 30% 
for 85% of searches 
 
 
Central 
Normal 
5.5 
4.5 
 
 
ORD 
Normal 


Palm Mark-to-Print 
100% for 15% of 
Central 
Urgent 


searches and 30% 
for 85% of searches 
 
# 30% 
Central 
Normal 
10 

 
 
ORD 
Normal 


 
> 30% and # 100% 
Central 
Normal 
30 
24 
for up to 15% of 
Schedule F, Service Level Requirements 
57 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
searches 
 
 
ORD 
Normal 
10 

Mark-to-Mark 
100% 
Central 
Urgent 


 
 
Central 
Normal 


 
 
ORD 
Normal 


Figure 2.3-19   Average Target Response Times at FOC and FOC+3 
In  Figures  2.3-19  and  2.3-18,  database  penetration  refers  to  geographic  penetration 
(100%  penetration  for  National  searches).  The  response  times  reflect  search 
parameters  such  as  finger  allowance  and  priority  currently  used  in  operational 
environments. Bureau search loads for the ORD are not specified in the DOR. 
The metric for average response time will be the percentage deviation from the target 
value  ie  ([average  response  time  target  value  -  measured  average  response 
time]/average  response  time  target  value).  For  each  search  type,  this  metric  will  be 
computed  for  each  priority  and  search  category  within  the  search  type.  The  values 
will  then  be  averaged  to  obtain  a  composite  metric  value  for  the  search  type.    The 
calculation  of  the  average  response  times  will  exclude  searches  that  are  directly 
effected by the failure of critical components where the Service Failure is being fully 
measured  under  the  Service  Availability  category.  Figure  2.3-20  provides  the  table 
for translating the metric values into scores. 
Schedule F, Service Level Requirements 
58 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Average Response 
Average Response 
Average Response 
Score 
Score 
Score 
Time Metric (%) 
Time Metric (%) 
Time Metric (%) 
+50.0 
120 
-10.0 
96 
-70.0 
72 
+47.5 
119 
-12.5 
95 
-72.5 
71 
+45.0 
118 
-15.0 
94 
-75.0 
70 
+42.5 
117 
-17.5 
93 
-77.5 
69 
+40.0 
116 
-20.0 
92 
-80.0 
68 
+37.5 
115 
-22.5 
91 
-82.5 
67 
+35.0 
114 
-25.0 
90 
-85.0 
66 
+32.5 
113 
-27.5 
89 
-87.5 
65 
+30.0 
112 
-30.0 
88 
-90.0 
64 
+27.5 
111 
-32.5 
87 
-92.5 
63 
+25.0 
110 
-35.0 
86 
-95.0 
62 
+22.5 
109 
-37.5 
85 
-97.5 
61 
+20.0 
108 
-40.0 
84 
-100.0 
60 
+17.5 
107 
-42.5 
83 
-102.5 
59 
+15.0 
106 
-45.0 
82 
-105.0 
58 
+12.5 
105 
-47.5 
81 
-107.5 
57 
+10.0 
104 
-50.0 
80 
-110.0 
56 
+7.5 
103 
-52.5 
79 
-112.5 
55 
+5.0 
102 
-55.0 
78 
-115.0 
54 
+2.5 
101 
-57.5 
77 
-117.5 
53 
0.0 
100 
-60.0 
76 
-120.0 
52 
-2.5 
99 
-62.5 
75 
-122.5 
51 
-5.0 
98 
-65.0 
74 
≤ -125.0 
50 
-7.5 
97 
-67.5 
73 
 
 
Figure 2.3-20  Average Response Times Score Table 
The overall response time service level score for each search type will be computed 
Schedule F, Service Level Requirements 
59 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
as  a  weighted  average  of  the  scores  for  the  90  percentile  and  the  average  response 
times, with a weight of 0.6 for the 90 percentile and a weight of 0.4 for the average 
response time. 
In addition to the average response time metrics, shadow metrics for 99.9 percentile 
response times will be defined and evaluated for potential implementation after FOC. 
2.3.7.3  Non-Verified Live ID Response Time 
Since Live ID non-verified searches require much faster response than the other print-
to-print searches, separate measurements will be made and scored. Shortly after TOR, 
a live ID shadow metric will be defined and evaluated.  The initial target value will be 
120 seconds.  The implementation and scoring of the metric for Live ID non-verified 
searches will commence as soon as the IDENT1 web server architecture is deployed. 
The proposed weighting for its inclusion is shown in Figure 2.3-21. 
Search Response Time Weights 
Print-to-Print 
Print-to-Mark 
Mark-to-Print 
Mark-to-Mark 
Quoted CRO 
Paper 
Live ID 
 
 
 
 
0.05 
0.05 
0.10 
0.10 
0.02 
0.03 
Figure 2.3-21  Search Response Time Weights 
On  implementation  and  scoring  of  the  Live  ID  non-verified  search  Service  Level 
Metric,  the  weighting  between  other  Service  Level  metrics  within  the  Search 
Performance Service criteria will be adjusted in accordance with Figure 2.3-21 above. 
2.3.7.4  Serious Crimes Cache 
At  FOC  the  target  response  time  for  searches  of  the  serious  crimes  cache  will  be 
reduced  to  a  target  of  5  minutes.  This  target  is  for  review  purposes  and  will  not  be 
included in the scoring mechanism. 
2.3.7.5  Operator Task Times 
While  end-to-end  search  response  time  will  continue  to  be  defined  from  the  time  a 
search  is  submitted  by  the  Bureau  to  the  time  the  search  results  are  available  for 
comparison  at  the  Bureau,  significantly  improved  target  operator  times  for  various 
Bureau  tasks  have  been  defined  for  audit  purposes  to  ensure  improved  system 
responsiveness.  These are shown in Figure 2.3-22. 
Time at 
Time at 
Tasks 
Description 
TOR 
FOC 
(seconds) 
(seconds) 
Print-to-Print Processing 
Capture Images 
Average number of seconds required to scan a two-
First one 
First one 34 
in a Batch 
sided Ten Print form through the Improvision 
78.2 sec 
sec Others 
scanner, display it to the Ten Print Technician, and 
Others 56.6 
18 sec 
have the technician move the delineation boxes if 
sec 
Schedule F, Service Level Requirements 
60 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Time at 
Time at 
Tasks 
Description 
TOR 
FOC 
(seconds) 
(seconds) 
needed, and accept the form into the system 
Check 
Number of seconds that a Ten Print Technician 
First one 31 
First one 7 
Demographics in  spends checking demographics for one form in a 
sec Others 
sec Others 6 
a Batch 
batch 
24 sec 
sec 
Check Prints 
Time to start the check prints function from request 
2.1 sec 
2.1 sec 
initialisation for 
to display of the first images 
a batch 
Check Prints 
Time per suspect finger for an FPO to inspect and 
12 sec 
12 sec 
Visual 
decide on action 
Sequence/Quality 
Check 
Check Prints 
Time for an FPO to replace a poor quality rolled 
6.3 sec 
6.3 sec 
Replace a roll 
impression with a flat per finger replace 
with a flat 
Check Prints 
Time for an FPO to exchange two fingers placed in 
6.3 sec 
6.3 sec 
Exchange 
the wrong box 
Fingers 
Check Prints 
Time for an FPO to manually edit a finger (per 
80 sec 
80 sec 
Fingerprint Edit 
finger edited) 
Check Prints 
Time for an FPO to interchange hands that have been  50 sec 
10 sec 
Exchange Hands  place in the wrong position 
Check Prints 
Time to accept a form and if any remain in the batch,  0.8 sec 
0.8 sec 
Accept and Next  display the next form 
Set parameters 
This function is automated 
0 sec 
0 sec 
for default search 
Request Non-
Time for Ten Print Technician to set parameters and  50 sec 
30 sec 
Default Search 
start non-default search 
Print-to-Print 
Time for a Ten Print Technician or FPO to view a 
First one  
First one  
Respondent 
respondent image against an enquiry image during a  29.5 sec 
29.5 sec 
image viewing 
first level check (Compare 1) when viewed in a 
Others 26 
Others 26 
time (first check)  batch 
sec 
sec 
Print-to-Print 
Time for a FPO to view a respondent image against 
First one 
First one 
Respondent 
an enquiry image during a first level check 
64.4 sec 
64.4 sec 
image viewing 
(Compare 1) when viewed in a batch 
Others 60.9 
Others 60.9 
time (second 
sec 
sec 
check) 
Schedule F, Service Level Requirements 
61 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Time at 
Time at 
Tasks 
Description 
TOR 
FOC 
(seconds) 
(seconds) 
Finger Mark-to-Print Processing 
Case Control 
Time for FPO Create a case and enter details 
58.2 sec 
58.2 sec 
Capture Lift 
Average time for FPO to capture a lift image 
29 sec 
11.5 sec 
Clip Mark from 
Time for FPO to define and clip the image for one 
48 sec 
10 sec 
Lift 
mark from a lift 
Edit Image 
Average Time for FPO to manually edit minutiae for  155 sec 
155 sec 
an image 
Request Search 
Time for FPO to set parameters and start search 
14.6 sec 
5 sec 
Mark-to-Print 
Average Time for FPO to view a single finger ten-
First one 
First one 
Respondent 
print respondent for a mark to print search at the first  27.2 sec 
18.2 sec 
Viewing Time 
level 
Others 10.2 
Others 8.2 
(Compare 1) 
sec 
sec 
Mark-to-Print 
Average Time for FPO to view a single finger ten-
First one 
First one 
Respondent 
print respondent for a mark to print search at the 
98.8 sec 
78.5 sec 
Viewing Time 
second or third level 
Others 85.8 
Others 71.5 
(Compare 2/3) 
sec 
sec 
Palm Mark-to-Print Processing 
Case Control 
Time for FPO Create a case and enter details 
N/A 
58 sec 
Capture Lift 
Average time for FPO to capture a lift image 
N/A 
11.5 sec 
Capture Mark 
Time for FPO to define and clip the image for one 
N/A 
20 
from Lift 
mark from a lift 
Edit Image 
Average Time for FPO to manually edit minutiae for  N/A 
280 sec 
an image 
Request Search 
Time for FPO to set parameters and start search 
N/A 
5 sec 
Mark-to-Print 
Average Time for FPO to view a single finger ten-
First one 
Others 30.2 
Respondent 
print respondent for a mark to print search at the first  40.2 sec 
sec 
Viewing Time 
level 
(Compare 1) 
Mark-to-Print 
Average Time for FPO to view a single finger ten-
First one 78 
Others 81.2 
Respondent 
print respondent for a mark to print search at the 
sec Others  
sec 
Viewing Time 
second or third level 
91.2 sec 
(Compare 2/3) 
Figure 2.3-22   Operator Task Times 
Schedule F, Service Level Requirements 
62 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Note  that  the  “TOR  times”  are  applicable  after  the  Linux  workstations  have  been 
deployed. This is scheduled to occur shortly after TOR. 
By  FOC,  Figure  2.3-22  will  be  updated  to  include  operator  task  times  for  Print  to 
Mark searches, searches against the Police Elimination Database and the Operational 
Response  Database,  and  the  Livescan  processes.    In  addition  a  tabulation  of  search 
response times for Police Elimination Database, the Operational Response Database 
and Serious Crime Cache searches will be added for audit and reporting purposes as 
needed rather than SLR scoring, if agreed between the Contractor and the Authority. 
Schedule F, Service Level Requirements 
63 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
2.4 
Technical Support Service 
Technical Support Service will be measured in terms of response time for trouble calls made to the 
Contractor Help Desk.  Response time is defined as the Contractor’s level of responsiveness to any 
Bureaux, Central, DRS and training incident, see Figure 2.4-1 for the definition of each response 
level. 
Response 
Title 
Description 
Level 

Receive incident call 
Answer the incoming call at the help desk and resolve or 
escalate. 

Respond with Status 
Resolved incident over the phone or escalate to next level. 
Update 

Restore service to faulty 
Site support sent to correct incident and/or restore service 
item  
to sufficient IDENT1 functional and performance 
capability to process their normal workload within the 
measures defined within this SLR. 

Global Changes 
Deploy hardware or software fixes to all sites to restore 
IDENT1 operational functionality.  This response level is 
not applicable to all incidents, but only those incidents 
which cause a loss of operational services (as defined in 
Section 2.1 of this document) at Central, Bureaux, or 
Training Centres. 
Figure 2.4-1  Definition of Response Levels 
The Help Desk, at the first level, will determine the severity of the incident through the information 
provided by the caller and in accordance with the Help Desk calling procedures defined in the 
IDENT1 Maintenance Plan.  In some cases, where sites have only one workstation, it may be 
determined that those sites may not employ a level 1 fault severity but fall into a level 2 fault severity.  
Figure 2.4-2 defines each fault severity rating for IDENT1. 
Fault 
Severity 
Title 
Description 
Level 

Non-fault 
All system or service matters that do not equate to a fault.  
This will include all calls to the Help Desk that do not fall 
into one of the other severity levels. 

Single User Fault or Non 
Faults affecting: 
Critical Fault 
• 
a single user account or workstation   
• 
non-critical equipment as defined in Section 6.1 of 
this SLR  
• 
non-essential IDENT1 software capabilities  that 
do not cause a loss of Site Services. 

Bureau Site Fault 
Faults causing a loss of Bureaux Site services involving 
critical IDENT1 equipment as defined in Section 6.1 or 
Schedule F, Service Level Requirements 
64 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
essential IDENT1 software capabilities. 
3a     3b 
(a) Central Segment - 
Faults causing a loss of Central Segment - Primary 
Primary Fault  (b) Central 
services involving critical IDENT1 equipment as defined 
Segment - DRS Fault     
in Section 2.1 or essential software capabilities   Faults 
causing a loss of DRS services involving critical IDENT1 
equipment as defined in Section 2.1 or essential IDENT1 
software capabilities  

Global Fault 
Faults causing a loss of services between Central and 
Bureaux Sites, or between Central and PNC, due to one or 
more faults. 
Figure 2.4-2  Definition of Fault Severity Levels 
Non-fault Calls 
Some calls received by the Help Desk may not relate to an actual fault but refer to other system or 
service matters.  Examples are queries about use of the system, user account changes and calls in 
connection with user training.  The Help Desk will record these calls under one of the following 
categories - for analysis and reporting purposes: 
•  Unconfirmed faults (i.e. problems/suspected faults which, upon examination, do not represent a 
failure of the system) 
•  User queries 
•  User training (calls in connection with training centre or other recognised training sessions). 
Based on the Response Levels defined in Figure 2.4-1 and the Fault Severity Levels defined in Figure 
2.4-2, the target response times in Figure 2.4.3 have been established.  
Fault Severity Levels 




0 Non Fault 
1 Minute 
30 Minutes 
Not Applicable 
Not 
Applicable 
1 Single User Fault/Non Critical  1 Minute 
30 Minutes 
24 Hours 
6 Months 
Fault 
2 Bureau Site Fault 
1 Minute 
30 Minutes 
4 Hours 
6 Months 
3a Central Segment - Primary 
1 Minute 1 
30 Minutes 
2 Hours 8 Hours 
6 Months 6 
Fault 3b Central Segment - DRS  Minute 
30 Minutes 
Months 
Fault 
4 Global Fault 
1 Minute 
30 Minutes 
3 Hours 
6 Months 
Figure 2.4-3  Target Response Times 
Restoration of Service is defined as restoration of sufficient IDENT1 functional capability to enable 
Bureaux to process their normal workload within the measures defined within this SLR. This will be 
agreed between the Help Desk and the bureau.  Technical Support Service will be measured with 
respect to response times for each Response Level to trouble calls as defined in Figure 2.4-1.  In view 
Schedule F, Service Level Requirements 
65 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
of the variable nature of Non-faults (Fault Severity Level 0), Target Response Times for Response 
Levels 3 and 4 will not be applicable and will not be scored 
Once the response times for each level is computed, a SCORE can be calculated for each response 
level.  This score is calculated on a monthly basis and is illustrated in Section 2.4.1 through 2.4.4.  To 
compute an OVERALL SCORE for Technical Support Service each response level measure Score 
will be computed and applied to Figure 2.4-4.  The following steps are used to compute an Overall 
Service Support Score: 
1.  The SCORE for each Measure within Technical Support Service is applied to Figure 2.4-4.  These 
scores are computed from the scoring tables defined in Section 2.4.1 through 2.4.4 of this SLR. 
2.  The Sum of the Scores is calculated and then divided by the total number of Measure Scores to 
obtain an Overall Service Support Score as shown in Figure 2.4-4. 
Measure 
SCORE 
OVERALL SCORE 
Receive Incident Call 
 
 
Respond with Status Update 
 
 
Restore Service to Faulty Item 
 
 
Global Changes 
 
 
Overall Service Support Score 
 
 
Figure 2.4-4  Technical Support Service Score 
The OVERALL Service Support SCORE will be applied to Figure 4.1-1 for SLR reporting. 
2.4.1 
Receive Incident Call 
The  first  level  of  maintenance  response  is  provided  by  the  Contractor’s  Help  Desk 
which  is  located  at  the  Central  Site.    For  any  Bureau  question  or  maintenance 
problem that is beyond user’s level of expertise, an incident call, which can originate 
as a telephone call, electronic mail, or FAX, will be placed to the Contractor’s Help 
Desk.  Each IDENT1 Site is provided a Problem Reporting Checklist developed for 
IDENT1  operations  which  is  defined  in  the  IDENT1  Maintenance  Plan.    This 
Problem Report Checklist includes the required information needed by the Help Desk 
to assess the Incident’s severity. 
To  compute  a  measure  for  Incident  Calls  the  following  equation  and  steps  will  be 
used: 
 Number of Calls Re sponded to in1min 
Equation 2.4-1: 
Re ceive Incident Call =
×100





Number of Incident calls received

 
where 
(a) 
The Number of Incident Calls responded to in 1 minute is defined as the Help 
Desk’s answering any incoming incident calls within 1 minute.   
Schedule F, Service Level Requirements 
66 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
(b) 
The  denominator  of  the  equation  is  the  total  Number  of  Incident  Calls 
received at the Help Desk. 
The Receive Incident call measure value will be computed using Equation 2.4-1. 
Once the value has been computed, a Service Level Score will be selected from the 
Scoring Table presented as Figure 2.4-5. In the event that no applicable incident calls 
are made to the help desk in the reporting period, a fixed Service Level Score of 100 
shall be applied.   
Receive 
Receive 
Receive 
Receive 
Receive 
Incident  SCORE  Incident  SCORE  Incident  SCORE  Incident  SCORE  Incident  SCORE 
Call 
Call 
Call 
Call 
Call 
100 
110 
89 
94 
78 
83 
67 
72 
56 
61 
99 
108 
88 
93 
77 
82 
66 
71 
≤55 
60 
98 
106 
87 
92 
76 
81 
65 
70 
 
 
97 
104 
86 
91 
75 
80 
64 
69 
 
 
96 
102 
85 
90 
74 
79 
63 
68 
 
 
95 
100 
84 
89 
73 
78 
62 
67 
 
 
94 
99 
83 
88 
72 
77 
61 
66 
 
 
93 
98 
82 
87 
71 
76 
60 
65 
 
 
92 
97 
81 
86 
70 
75 
59 
64 
 
 
91 
96 
80 
85 
69 
74 
58 
63 
 
 
90 
95 
79 
84 
68 
73 
57 
62 
 
 
Figure 2.4-5  Receive Incident Call Scoring Table 
Once  a  Service  Level  Score  has  been  selected,  it  will  be  applied  to  the  Technical 
Support  Service  table,  Figure  2.4-4,  in  order  to  compute  an  overall  support  service 
score. 
2.4.2 
Respond With Status Update 
Once the Incident call details are entered into the Help Desk Management System, the 
Help  Desk  Operator  will  then  try  to  either  resolve  the  incident  call  or  escalate  the 
incident as follows: 
(a) 
Provide  telephone  support  using  a  series  of  scripts  residing  within  the  Help 
Desk Management System.  If telephone support provides a solution for the 
Incident,  and  the  user  concurs  with  the  corrective  action,  the  status 
information  will  be  logged  within  the  Help  Desk  Management  System,  and 
the incident report closed. 
Schedule F, Service Level Requirements 
67 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
(b) 
If  telephone  support  does  not  provide  a  satisfactorily  resolution,  the  Help 
Desk  Operator  will  then  prioritise  and  categorise  the  incident,  and  pass  the 
incident  on  to  the  most  appropriate  third  party  provider  in  accordance  with 
the IDENT1 Maintenance Plan.  The Help Desk Operator will then provide a 
status update to the user as to what the next step is in correcting the incident. 
(c) 
Non-fault calls (Fault Severity Level 0).  If the Help Desk Operator is unable 
to resolve a Non-fault call over the telephone, the call will be escalated within 
the  Contractor  or  Authority  service  organisation,  as  appropriate,  to  be  dealt 
with - and a status update provided to the user.  This will represent close-out 
of the call as far as the SLR is concerned.  It will be for the person to whom 
the call is escalated to respond to the caller and/or agree a suitable response 
time - although the Help Desk will continue to track the call until resolved 
In  computing  a  value  for  the  “Respond  With  Status  Update”  measure  the  following 
equation and steps will be used: 
 (
{ Number resolved × )
1
.
1
+ Number statused}
Equation 2.4-2: 
Re spond with StatusUpdate =
×100





Number of Incident calls

 
where 
(d) 
The  Number resolved  and the  Number  statused is defined as the  Help  Desk 
either  resolving  the  incident  or  escalating  the  incident  and  providing  the 
Bureau  updated  status  within  30  minutes.  Calls  that  are  resolved  within  30 
minutes are awarded a premium by multiplying the Number resolved by 1.1 
(e) 
The  denominator  of  the  equation  is  the  total  Number  of  Incident  Calls 
received at the Help Desk. 
The Respond with status update measure will be computed using Equation 2.4-2. 
Once  a  value  has  been  computed,  a  Service  Level  Score  will  be  selected  from  the 
Scoring Table presented as Figure 2.4-6. In the event that no applicable status updates 
are required by the help desk in the reporting period, a fixed Service Level Score of 
100 shall be applied. 
Respond 
Respond 
Respond 
Respond 
Respond 
Respond 
with 
with 
with 
with 
with 
with 
SCORE 
SCORE 
SCORE 
SCORE 
SCORE 
SCORE 
Status 
Status 
Status 
Status 
Status 
Status 
Update 
Update 
Update 
Update 
Update 
Update 
110 
120 
99 
104 
88 
93 
77 
82 
66 
71 
55 
60 
109 
118 
98 
103 
87 
92 
76 
81 
65 
70 
 
 
108 
116 
97 
102 
86 
91 
75 
80 
64 
69 
 
 
107 
114 
96 
101 
85 
90 
74 
79 
63 
68 
 
 
106 
112 
95 
100 
84 
89 
73 
78 
62 
67 
 
 
105 
110 
94 
99 
83 
88 
72 
77 
61 
66 
 
 
104 
109 
93 
98 
82 
87 
71 
76 
60 
65 
 
 
Schedule F, Service Level Requirements 
68 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
103 
108 
92 
97 
81 
86 
70 
75 
59 
64 
 
 
102 
107 
91 
96 
80 
85 
69 
74 
58 
63 
 
 
101 
106 
90 
95 
79 
84 
68 
73 
57 
62 
 
 
100 
105 
89 
94 
78 
83 
67 
72 
56 
61 
 
 
Figure 2.4-6  Respond with Status Update Scoring Table 
Once  a  Service  Level  Score  has  been  selected,  it  will  be  applied  to  the  Technical 
Support  Service  table,  Figure  2.4-4,  in  order  to  compute  an  overall  support  service 
score.   
2.4.3 
Restore Service to Faulty Item 
For  those  Incident  calls  not  resolved  by  the  Help  Desk,  escalated  to  a  third  party 
provider,  and  a  status  update  provided  to  the  user,  as  discussed  in  Section  2.4.2,  a 
third  party  technician  will  be  dispatched  to  the  site  reporting  the  incident.    The 
technician  will  follow  the response  procedures  defined  in  the  IDENT1  Maintenance 
Plan.    To  restore  service  of  a  hardware  or  software  faulty  item,  the  dispatched 
technician will perform the following maintenance tasks: 
(a) 
Verification 
(b) 
Fault Isolation 
(c) 
Remove/Replace  or  Repair  the  faulty  item  (hardware  or  software)  as 
appropriate 
(d) 
Operational Check-out. 
Once the hardware or software fault has been corrected, the on-site technician will co-
ordinate the incident call close-out with the Site personnel and the Contractor’s Help 
Desk, prior to leaving the site. 
Restore  Service  to  a  Faulty  Item  measure  may  be  one  of  five  (5)  severity  levels  as 
defined in  Figure  2.4-2.    The  response time  for each is  slightly  different,  leading  to 
slightly different values.  In computing a value for each severity level the following 
equation and steps will be used five (5) times, once each for each severity level: 
 Number of Incident calls resolved 
Equation 2.4-3: 
Re store Serviceto a Faulty Item =
×100




 Number of Incident calls escalated 
 
where 
(e) 
The  Number  of  Incident  Calls  resolved  is  defined  in  terms  of  those  calls 
resolved within the times shown in Figure 2.4-7.  The time taken to resolve a 
call will be measured from the moment the third party provider receives a call 
from the Contractor’s Help Desk until the moment when all parties involved 
agree that the incident call has been resolved and the incident is closed.  The 
threshold  for  the  numerator  is  based  upon  the  severity  of  the  faulty  item  as 
defined in Figure 2.4-2. In the event of a disaster at the Primary Site and the 
use of the DRS to support IDENT1 operations, the 2 hour restore service to 
faulty item value shall apply to the DRS. 
Schedule F, Service Level Requirements 
69 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Fault Severity 
Restore service to faulty item  
1 Single User Fault/Non Critical Fault 
24 Hours 
2 Bureau Site Fault 
4 Hours 
3a Central Segment Primary Fault 
2 Hours 
3b Central Segment - DRS 
8 Hours 
4 Global Fault 
3 Hours 
Figure 2.4-7    Restore Service to Faulty Item Response times 
(f) 
The  denominator  of  the  equation  is  the  total  Number  of  Incident  Calls 
escalated by the Help Desk for each of the severity levels defined in Figure 
2.4-2. 
The Restore Service to a Faulty Item measure will be computed using Equation 2.4-1 
five  (5)  times,  once  for  each  severity  level  defined  in  Figure  2.4-2.    The  value 
calculated for each severity level will be applied to Figure 2.4-8. 
Schedule F, Service Level Requirements 
70 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
 
Severity Level 
% Single 
Weighted 
User 

Score 
Average 
 
Fault/Non 
% Bureau 
Global 
% Central Segment Fault 
Critical 
Site Fault 
Fault 
Fault 
 
 
 
Primary 
DRS 
 
 
 
Weight 
.25 
.25 
.20 
.05 
.25 
 
 
Restore 
 
 
 
 
 
 
 
Service to 
Faulty Item 
Figure 2.4-8.  Measured Restore Service to Faulty Item Score 
The  five  (5)  values  will  be  multiplied  by  their  weights  and  summed  to  produce  a 
weighted average for the Restore Service to Faulty Item measure. 
Once an Average has been computed, a Service Level Score will be selected from the 
Scoring  Table  presented  as  Figure  2.4-9  and  applied  to  Figure  2.4-8.    This  Service 
Level Score will be carried forward and applied to Figure 2.4-4.  In the event that no 
applicable  service  incidents  are  made  during  the  reporting  period,  a  fixed  Service 
Level Score of 100 shall be applied. 
Restore 
Restore 
Restore 
Restore 
Restore 
Service to  SCORE  Service to  SCORE  Service to  SCORE  Service to  SCORE  Service to  SCORE 
Faulty Item 
Faulty Item 
Faulty Item 
Faulty Item 
Faulty Item 
100 
110 
89 
94 
78 
83 
67 
72 
56 
61 
99 
108 
88 
93 
77 
82 
66 
71 
≤55 
60 
98 
106 
87 
92 
76 
81 
65 
70 
 
 
97 
104 
86 
91 
75 
80 
64 
69 
 
 
96 
102 
85 
90 
74 
79 
63 
68 
 
 
95 
100 
84 
89 
73 
78 
62 
67 
 
 
94 
99 
83 
88 
72 
77 
61 
66 
 
 
93 
98 
82 
87 
71 
76 
60 
65 
 
 
92 
97 
81 
86 
70 
75 
59 
64 
 
 
91 
96 
80 
85 
69 
74 
58 
63 
 
 
90 
95 
79 
84 
68 
73 
57 
62 
 
 
Figure 2.4-9  Measured Restore Service to Faulty Item Scoring Table 
In  the  event  of  a  disaster  at  the  primary  site  and  the  use  of  the  DRS  to  support 
Schedule F, Service Level Requirements 
71 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
IDENT1 operations, no % Central Segment Fault-Primary will be computed.  Rather 
the  %  Central  Segment  Fault  of  the  DRS  site  will  be  used  with  a  weight  of  .25  in 
Figure 2.4-8.  If there is a disaster at the DRS, the % Central Segment Fault- Primary 
value will be computed as normal and a weight of .25 will be used in Figure 2.4-8. 
2.4.4 
Global Changes 
In  addition  to  incident  calls  related  to  problems  discussed  in  Section  2.4.3,  some 
incidents may be referred to the Contractor’s engineers for resolution in future system 
releases.    These  escalated  incidents  will  be  considered  global  changes  as  they 
constitute changes that need to be applied to IDENT1 as a whole. Incidents that affect 
operational services at Central, Bureaux, or Training Centres will be resolved by the 
Contractor’s  development/test  group  and  included  in  new  releases  within  the  time 
scales specified in Figure 2.4-3.  Incidents that do not affect operational services will 
not be included in global changes and will not subject to the time scales specified in 
Figure  2.4-3.    The  status  of  all  applicable  escalated  incidents  will  be  tracked 
separately, with status reporting on a monthly basis, as a minimum, and a resolution 
target as defined in Figure 2.4-3. 
To compute a measure for Global Changes the following equation and steps will be 
used: 
 Number of Incident calls resolved 
Equation 2.4-4: 
Global Changes =
×100





Number of Incident calls

 
where 
(a) 
The  Number  of  Incident  Calls  resolved  is  defined  as  the  number  of  calls 
escalated to the Contractor’s development/test group and resolved, installed, 
checked out, and closed out in 6 months. 
(b) 
The  denominator  of  the  equation  is  the  total  Number  of  Incident  Calls 
escalated to the Contractor’s development/test group for resolution. 
The Global Changes measure will be computed using Equation 2.4-4. 
Once  a  value  has  been  computed,  a  Service  Level  Score  will  be  selected  from  the 
Scoring  Table  presented  as  Figure  2.4-10.    The  resulting  score  will  be  applied  to 
Figure 2.4-4.  In the event that no applicable incidents are outstanding or scheduled to 
be fixed at the time of the Service Review, a fixed Service Level Score of 100 shall 
be applied to Global Changes.   
Global 
Global 
Global 
Global 
Global 
SCORE 
SCORE 
SCORE 
SCORE 
SCORE 
Changes 
Changes 
Changes 
Changes 
Changes 
100 
110 
89 
94 
78 
83 
67 
72 
56 
61 
99 
108 
88 
93 
77 
82 
66 
71 
≤55 
60 
98 
106 
87 
92 
76 
81 
65 
70 
 
 
97 
104 
86 
91 
75 
80 
64 
69 
 
 
Schedule F, Service Level Requirements 
72 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
96 
102 
85 
90 
74 
79 
63 
68 
 
 
95 
100 
84 
89 
73 
78 
62 
67 
 
 
94 
99 
83 
88 
72 
77 
61 
66 
 
 
93 
98 
82 
87 
71 
76 
60 
65 
 
 
92 
97 
81 
86 
70 
75 
59 
64 
 
 
91 
96 
80 
85 
69 
74 
58 
63 
 
 
90 
95 
79 
84 
68 
73 
57 
62 
 
 
Figure 2.4-10  Measured Global Changes Scoring Table 
2.4.5 
Future Changes for Service Management 
No changes of the target values for the helpdesk response times are currently planned. 
The mechanism for faster response time will continue to be the incentive built into the 
SLR scoring structure. 
The  focus  for  this  service  level  criterion  after  TOR  will  be  on  the  definition, 
evaluation  of  shadow  metrics  that  reflect  user  service  satisfaction  both  from  a 
helpdesk  perspective  and  the  overall  service  support.  Depending  on  the  evaluation 
results, it is a goal that at or prior to FOC, one or more user oriented metrics will be 
implemented and integrated into the IDENT1 SLR structure described in Section 1.0 
2.5 
Search Accuracy 
AFR Accuracy will be measured in terms of matcher performance.  Matcher performance is 
defined  as  the  systems’  accuracy  when  performing  a  search.    The  Contractor  and  the 
Authority  will  establish  a  background  database  called  a  Quality  Assurance  (QA)  Collection 
database located at the Central Site. The objective of this QA Collection database is to ensure 
that  search  accuracy  is  not  degraded  due  to  changes,  enhancements,  or  upgrades  to  system 
equipment  or  matcher  algorithms.    This  database  will  consist  of  Ten  Prints  and  Marks, 
enquiry Ten Prints and Marks, identification of the correct match (ident) for each enquiry, and 
sets  of  respondent  IDs  and  scores  from  previous  runs.  Maintaining  the  ident  information 
allows  the  QA  run  results  to  be  measured  in  terms  of  the  position  on  each  respondent  list. 
Improvements in accuracy from one QA run to the next is then measured as the amount that 
the ident has moved towards the top of the respondent list. 
In measuring matcher performance, a limited number of known searches will be run.  These 
known searches are run to ensure that the system provides the same score as established with 
the baseline database, should no changes have been made.  In addition, if changes have been 
made  the  QA  run  of  known  searches  should  yield  the  same  results  and  not  degrade  the 
baseline  search  accuracy.  See  Section  2.5.1  of  this  SLR  for  a  description  of  how  AFR 
Accuracy will be measured. 
2.5.1 
Matcher Performance 
Matcher  Performance  Accuracy  will  be  assessed  monthly  from  each  QA  Collection 
database run.  A QA run consists of running searches using each enquiry item.  The 
top  portion  of  the  respondent  list  is  retained  as  the  baseline,  see  Figure  2.5-1.    The 
Schedule F, Service Level Requirements 
73 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
initial  baseline  QA  Collection  database  will  be  implemented  from  data  obtained  at 
previous AFR trials and augmented with data to be provided by the Authority. 
Background 
Respondent IDs & 
Search Type 
Enquires 
Database 
Scores to Save 
Print-to-Print 
500 
50,000 
Top 3 (All 3 fingers 
searched) 
Mark-to-Print 
400 
50,000 
Top 15 
Print-to-Mark 
125 
5,000 
Top 10 
Mark-to-Mark 
125 
5,000 
Top 5 
Figure 2.5-1 Search Type Data Saved 
Search  accuracy  will  be  measured  for  each  search  type  as  defined  in  Figure  2.5-1.  
Data obtained for each search type will be compared for both the QA run (Test Set) 
and the existing baseline (Baseline Set) as shown in Figure 2.5-2. 
The data resulting from each search type will be a percentage value of idents in the 
Nth  position  as  shown in Figure  2.5-2,  based  on the  definitions  of each  search  type 
below: 
1.  Print-to-Print:  N is 1, ≤ 2, ≤ 3, >3 
2.  Mark-to-Print:  N is 1, ≤ 10, ≤ 15, >15 
3.  Print-to-Mark:  N is 1, ≤ 10, >10 
4.  Mark-to-Mark:  N is 1, ≤ 5, >5. 
 
Schedule F, Service Level Requirements 
74 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Matcher Quality Assurance Report 
Test Data Set:ref_num, run_num, date 
Baseline Data Set:  ref_num, run_num, date 
 
Print to Print 
   
Test Set 
Baseline Set 
  Idents in top position   
00% 
00% 
  Idents in top 2 positions   00% 
00% 
  Idents in top 3 positions   00% 
00% 
  Idents not in top 3 positions 
00%  00% 
 
Mark to Print 
   
Test Set 
Baseline Set 
  Idents in top position   
00% 
00% 
  Idents in top 10 positions  00% 
00% 
  Idents in top 15 positions  00% 
00% 
  Idents not in top 15 positions 
00%  00% 
 
Print to Mark 
   
Test Set 
Baseline Set 
  Idents in top position   
00% 
00% 
  Idents in top 10 positions  00% 
00% 
  Idents not in top 10 positions 
00%  00% 
 
Print to Mark Serious Crime Cache 
   
Test Set 
Baseline Set 
  Idents in top position   
00% 
00% 
  Idents in top 10 positions  00% 
00% 
Schedule F, Service Level Requirements 
75 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
  Idents not in top 10 positions 
00%  00% 
 
Mark to Mark 
   
Test Set 
Baseline Set 
  Idents in top position   
00% 
00% 
  Idents in top 5 positions   00% 
00% 
  Idents not in top 5 positions 
00%  00% 
Figure 2.5-2  Matcher QA Report 
The monthly assessment will be run based on one of the following: 
(a) 
Should there be no changes to the baseline IDENT1 design configuration, a 
subset  of  the  enquiries  will  be  searched  for  each  search  type  to  ensure  that 
percentages for both the Baseline Set and Test Set remain the same. 
(b) 
For  Intermediate  cases  where a  new  version  of the  UNIX  operating  system, 
new  version  of  the  compiler  is  installed,  there  may  be  slight  changes  (i.e., 
rounding  off  changes).    These  will  be  considered  as  scores  remaining  the 
same. 
(c) 
For  situations  where  a  known  IDENT1  configuration  is  brought  down  and 
then rebuilt, a subset of the enquiries will be searched for each search type to 
verify that percentages for both the Baseline Set and the Test Set remain the 
same. 
(d) 
For  the  situation  where  a  matcher  upgrade  is  installed,  the  entire  set  of 
searches  would  be re-searched.    For  the  upgrade  to  pass,  accuracy  must  not 
be  degraded  for  any  search  type.    For  Print-to-Print,  accuracy  must  not 
decrease for top 1, top 2 and top 3 respondent positions.  For Mark-to-Print, 
accuracy must not decrease for top 1, top 10, and top 15 positions.  For Print-
to-Mark, accuracy must not decrease for top 1 and top 10 positions. For Print-
to-Mark Serious Crime Cache, accuracy must not decrease for top 1 and top 
10  positions.    For  Mark-to-Mark,  accuracy  must  not  decrease  for  top  1  and 
top 5 positions.   
These criteria may be relaxed with Authority approval.  If the QA run passes, then the 
new set of scores becomes the new Score baseline. 
2.5.2 
Matcher Score 
In  computing  a  monthly  measure  for  AFR  Performance  the  data  collected  and 
compared in the Matcher QA Report, shown in Figure 2.5-2 within this SLR, will be 
used.    The  Service  Level  Score  will  be  determined  by  comparing  the  Baseline  Set 
percentages and the Test Set percentages for each measure in Figure 2.5-3: 
 
Schedule F, Service Level Requirements 
76 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
 
Test Set 
Baseline Set 
Difference 
Score 
Print to Print 
 
 
 
 
• 
Idents in top position 
0% 
0% 
0.0% 
 
• 

Idents in top 2 positions 
0% 
0% 
0.0% 
 
• 
Idents in top 3 positions 
0% 
0% 
0.0% 
 
• 

Idents not in top 3 positions 
0% 
0% 
0.0% 
 
Mark to Print 
 
 
 
 
• 

Idents in top position 
0% 
0% 
0.0% 
 
• 
Idents in top 10 positions 
0% 
0% 
0.0% 
 
• 
Idents in top 15 positions 
0% 
0% 
0.0% 
 
• 
Idents not in top 15 
0% 
0% 
0.0% 
 
positions 
Print to Mark 
 
 
 
 
• 
Idents in top position 
0% 
0% 
0.0% 
 
• 

Idents in top 10 positions 
0% 
0% 
0.0% 
 
• 

Idents not in top 10 
0% 
0% 
0.0% 
 
positions 
Print to Mark Serious Crime 
 
 
 
 
Cache 
• 

Idents in top position 
0% 
0% 
0.0% 
 
• 

Idents in top 10 positions 
0% 
0% 
0.0% 
 
• 

Idents not in top 10 
0% 
0% 
0.0% 
 
positions 
Mark to Mark 
 
 
 
 
• 

Idents in top position 
0% 
0% 
0.0% 
 
• 

Idents in top 5 positions 
0% 
0% 
0.0% 
 
• 

Idents not in top 5 positions 
0% 
0% 
0.0% 
 
Figure 2.5-3   Matcher QA Report 
The Difference will be computed by subtracting the Baseline Set percentage from the 
Schedule F, Service Level Requirements 
77 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Test  Set  percentage.    If  the  Difference  is  0.0  then  a  score  of  100  will  be  applied  to 
Figure  2.5-3  and  carried  forward  to  Figure  4.1-1  for  each  Bureau.    If  a  Difference 
other than 0.0 is obtained for any of the measures in Figure 2.5-3, then a score of 0 
will be applied to Figure 2.5-3 and carried forward to Figure 4.1-1 for each Bureau.  
2.5.3 
Future Changes for Search Accuracy 
Significant changes for the search accuracy service level criterion will be made after 
TOR.  These include  the  benchmark  measurement  of  accuracy  improvement  and  the 
integration  of  the  results  with  the  existing  quality  control  metric  to  determine  the 
service level score for the search accuracy criterion. 
2.5.3.1  Accuracy Improvement Metrics 
To  support  the  need  for  continuing  accuracy  improvement  for  IDENT1,  search 
accuracy metrics are defined to measure planned improvements using benchmarking 
every 2 or 3 years. To facilitate the benchmarking process, three search types, print-
to-print, finger mark-to-print, and palm mark-to-print are used to represent the overall 
search accuracy of the system. In all cases, the most important Top 1 accuracy will be 
used  as the  metric.  Figure  2.5-4  shows  the  planned  evolution  of  the  target  accuracy 
levels from FOC to FOC+1 and FOC + 4 years.  
Search Type 
Metrics 
Target Accuracy Levels 
 
 
FOC 
FOC+1 
FOC+4 
Print-to-Print 
Top 1 
T1=99.8% 
No Change 
No Change 
Finger Mark-to-
Top 1 
T2=54.2% 
T2+5% 
T2+10% 
Print 
Palm Mark-to-
Top 1 
T3=76.2 % 
T4+3% 
T4+5% 
Print 
Figure 2.5-4  Search Accuracy Target Values 
Where  the  target  accuracy  levels  for  the  searches  are  specified  in  terms  of  the 
IDENT1 benchmark results, T1, T2, T3 and T4 as defined below: 
T1 = Northrop Grumman IDENT1 ITT Benchmark Print-to-Print accuracy 
T2  =  Northrop  Grumman  IDENT1  ITT  Benchmark  Finger  Mark-to-Print 
accuracy 
T3  =  Northrop  Grumman  IDENT1  ITT  Benchmark  Palm  Mark-to-Print 
accuracy based on a 80K subject dataset 
T4 = Northrop Grumman IDENT1 Benchmark Palm Mark-to-Print accuracy on 
a 1 million  subject dataset measured at FOC 
Note  that  the  target  accuracy  levels  assume  searches  against  a  1  million-person 
background database unless indicated otherwise. For the Mark to Print (Palm) search 
accuracy  measurement  there  does  not  currently  exist  a  background  data  set  of  1 
million  subjects  for  benchmarking  purposes.  The  Accuracy  figure  for  T4  for  a  1 
million  database  at  FOC  will  be  measured  concurrent  with  the  search  accuracy 
Schedule F, Service Level Requirements 
78 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
measurement on the 80k subject database at FOC as part of the same benchmark.  All 
benchmarking for subsequent milestones for the search accuracy measurements based 
on T4 will use a 1 million subject database. 
For  each  search  type,  the  search  accuracy  for  SLR  purposes  is  calculated  as  the 
percentage of searches for which the specified mate (or any duplicate) is identified in 
the top one position, ie (Number of top one Idents/Total number of searches) * 100. 
For  finger  mark-to-print  searches,  the  accuracy  improvement  at  FOC  will  be  based 
primarily  on  the  fusion  of  SAGEM  and  NAFIS  matcher  results.    Improvements  at 
FOC+1 will derive from the use of multi-rolls and flats.  Note that although these are 
FOC functionality, they will be benchmarked at FOC+1 to ensure that the benchmark 
background  database  will  contain  adequate  representation  of  these  prints.    Further 
accuracy improvements at FOC+4 will be based on future algorithm enhancements. 
The  benchmark  search  accuracy  measurement  will  be  made  against  a  standard  1 
million subject background database, for example, the IDENT1 benchmark database.  
The  same  edited  mark  search  prints  will  be  used  to  eliminate  variations  due  to 
operators.    To  avoid  algorithm  tailoring,  additional  tests  can  be  conducted  using 
marks that are identified during operation with the background database appropriately 
seeded with the identified mates. 
The  approach  to  each  search  accuracy  benchmarking  event  will  be  agreed  between 
the  Contractor  and  Authority  and  documented  prior  to  the  start  of  the  associated 
benchmark. 
Further accuracy improvements beyond the target values specified in Figure 2.5-4 for 
Mark  to  Print  Searches  will  be  through  the  scoring  tables  that  provide  appropriate 
incentives for superior performance. Accuracy improvement for Print – Print Search 
Accuracy  are  not  readily  distinguishable  within the  constraints  of  these  benchmarks 
and  appropriate  confidence  intervals.  The  T1  Accuracy  will  be  validated  at  FOC 
through  the  benchmark  test.  Successful  completion  of  this  benchmark,  within 
confidence limits agreed as part of the benchmark, will result in the re-base lining of 
the  QA  test  as  described  in  section  2.5.1.  Benchmarking  events  for  Print  to  Print 
search accuracy at milestones after FOC will be used for information purposes only.  
The scoring tables, for mark-to-print searches are provided in Figure 2.5-6. The table 
is normalized to provide a score of 100 for the specified target accuracy level for the 
specific milestone. 
Finger Mark-to-Print 
Score 
Mark-to-Print Accuracy 
Score 
Accuracy 
TL > 5.0% 
120 
TL - 2.0% 
92 
TL + 5.0% 
120 
TL - 2.5% 
90 
TL + 4.5% 
118 
TL - 3.0% 
88 
TL + 4.0% 
116 
TL - 3.5% 
86 
TL + 3.5% 
114 
TL - 4.0% 
84 
TL + 3.0% 
112 
TL - 4.5% 
82 
Schedule F, Service Level Requirements 
79 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
TL + 2.5% 
110 
TL - 5.0% 
80 
TL + 2.0% 
108 
TL - 6.0% 
75 
TL + 1.5% 
106 
TL - 7.0% 
70 
TL + 1.0% 
104 
TL - 8.0% 
65 
TL + 0.5% 
102 
TL - 9.0% 
60 
Target Level (TL) 
100 
TL - 10% 
55 
TL - 0.5% 
98 
TL - 11% 
50 
TL - 1.0% 
96 
< (TL - 11%) 
50 
TL - 1.5% 
94 
 
 
Figure 2.5-6  Mark-to-Print Accuracy Scoring Tables 
 
Schedule F, Service Level Requirements 
80 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
The scoring table for palm mark-to-print search accuracy is provided by Figure 2.5-7 
Palm Mark-to-Print 
Score 
Mark-to-Print Accuracy 
Score 
Accuracy 
TL > 5.0% 
120 
TL - 2.0% 
92 
TL + 5.0% 
120 
TL - 2.5% 
90 
TL + 4.5% 
118 
TL - 3.0% 
88 
TL + 4.0% 
116 
TL - 3.5% 
86 
TL + 3.5% 
114 
TL - 4.0% 
84 
TL + 3.0% 
112 
TL - 4.5% 
82 
TL + 2.5% 
110 
TL - 5.0% 
80 
TL + 2.0% 
108 
TL - 6.0% 
75 
TL + 1.5% 
106 
TL - 7.0% 
70 
TL + 1.0% 
104 
TL - 8.0% 
65 
TL + 0.5% 
102 
TL - 9.0% 
60 
Target Level (TL) 
100 
TL - 10% 
55 
TL - 0.5% 
98 
TL - 11% 
50 
TL - 1.0% 
96 
< (TL - 11%) 
50 
TL - 1.5% 
94 
 
 
Figure 2.5-7 Palm Accuracy Scoring Table 
2.5.3.2  Integration with Quality Control Metric 
As previously described, the NAFIS quality control metric on search accuracy will be 
retained for IDENT1. This metric measures rank consistency using a small database 
to  ensure  software  and  system  changes  will  not  adversely  impact  the  search 
performance.  For  IDENT1,  data  on  score  consistency  though  not  used  for  scoring 
purposes, will also be made available for review purposes.  
The integration of the accuracy improvement metrics and the existing QC metric will 
be  accomplished  in  the  following  manner.  Currently,  the  QC  metric  is  measured 
monthly. Depending on if the consistency check is successful or not, a target score of 
100 or zero is assigned.  With the inclusion of the accuracy improvement metrics, this 
scheme  will  be  retained  except  the  target  score  will  be  determined  by  the  accuracy 
levels and therefore scores achieved during the last benchmark for the T2, T3 and T4 
accuracy measures, as above in Figure 2.5-4. 
For each accuracy benchmark, separate scores will be calculated for finger mark-to-
Schedule F, Service Level Requirements 
81 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
print and palm mark-to-print searches based on the measured accuracy levels. For the 
print to print search accuracy a score of 100 will be assigned. The overall benchmark 
score is then calculated as the weighted sum of these individual scores. The weights 
for the print-to-print, finger mark-to-print and palm mark-to-print scores are 0.1, 0.6 
and 0.3 respectively (these weight will be re-normalized if one or more of the search 
types  is  not  benchmarked).  This  benchmark  score  will  serve  as  the  target  score  for 
monthly QC until it is modified during the next benchmark. 
The monthly derived QC score using this target value will be the service level score 
for the search accuracy criterion. A 10% weight will be used for this Service Criteria 
score in calculating the overall service level score. 
Schedule F, Service Level Requirements 
82 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 

SHADOW METRICS 
Shadow metrics are new metrics proposed to enable the SLR to achieve a better reflection of system 
performance, business value and user satisfaction. As previously described, they are the means for 
evolving the initial IDENT1 system-centric SLA structure to a structure that also measures and 
addresses business values and user needs. 
Prior to the implementation of these new metrics, they need to be carefully measured and evaluated to 
determine the utility and also to establish the baseline values.  Figure 3.5-1 provides the initial list of 
shadow metrics that have been identified in each metric category and their implementation time 
frames. 
Category 
Shadow Metrics 
Implementation Timeframe 
System Performance 
Live ID Response Time 
No later than FOC 
Planned Downtime 
No later than FOC 
Interface Metrics 
Post FOC 
Business Values 
Number of Idents 
Post FOC 
Number of Idents per Search 
Post FOC 
or Labor Hour 
User Effort per Transaction or 
Post FOC 
Business Thread 
User 
Helpdesk Service Satisfaction 
No later than FOC 
Overall Service Support 
No later than FOC 
Satisfaction 
Figure 3.5-1 Initial Shadow Metrics 
The listed shadow metrics will be further defined, agreed with the Authority and evaluated after TOR 
for potential implementation depending on the evaluation results. The process for evaluating, 
implementing the shadow metrics and changes to the SLR will be in accordance with the change 
control process defined in Part 1 of this Schedule. 
 
Schedule F, Service Level Requirements 
83 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 

SERVICE SCORE 
4.1 
SERVICE PROVISION SCORES 
This section defines how the various Service Level Metrics measured for each individual IDENT1 site 
or centrally are summated to derive an overall Service Scores for individual sites and how the Overall 
Score for the Service is derived from the individual site Service Scores. 
The  Monthly  Service  Charge  for  the  IDENT1  Service  is  detailed  in  Schedule  E  (Pricing).    The 
adjustment to the Monthly Service Charge (Service Credits or Service Incentivisation Payments) are 
based on the quality of service delivered to the individual IDENT1 Sites (Police Force and Training 
Centres) and measured under the SLR.   
Monthly, the Contractor will present the Service Score associated with each Service Level Metric and 
the  summary  Service  Score  for  each  IDENT1  site.  The  computation  of  the  Service  Score  from  the 
Measure for each Service Level Metric is detailed in Section 2.0, step #1 and the computation of the 
Service  Score  for  the  individual  IDENT1  site  is  detailed  in  Section  2.0,  step  #2.  The  calculated 
Service  Scores  will  be  presented  in  tabular  format  based  on  Figure  4.1-1.  The  agreed  weightings 
between each Service Level Metric and Service Criteria are detailed in the header of the row of the 
figure. In addition, the Contractor will present the individual Service Measures for each Service Level 
Metric in tabular form as defined and detailed in Section 2 and 3 of this Part. 
The Service Scores for individual IDENT1 sites are taken through to Schedule E (Pricing) to derive 
the Service Credit or Service Incentive Payment for each site, which are then aggregated to form the 
Actual Service Charge for the month. 
The Actual Service Score for the IDENT1 Service is derived from the individual site service scores. 
Each individual site is allocated to a tier based on its associated workload/ throughput.  The Overall 
Score  is  calculated  from  the  aggregate  of  Service  Scores  for  the  individual  site  multiplied  by  the 
weighting  associated  with  the  tier  it  is  in.  The  allocation  of  bureaux  to  Tiers  and  the  normalised 
weighting is detailed in Section 3 of Schedule E (Pricing). 
In  addition  to  the  summary  scoring  tabulation  and  weighting  given  in  Figure  4.1-1,  the  Site  Scores 
and Overall Score for the preceding 6 months as illustrated as a spreadsheet in Figure 4.1-2 will be 
presented  monthly  for  the  purposes  of  identifying  any  trigger  conditions  described  in  Section  5 
Escalation of Service Related Failure of Part 1 of this Schedule and to identify ongoing trends. 
Figures 4.1-1 and 4.1-2 will be updated as additional bureau are deployed under the Contract and in 
line with the identified changes in the preceding Sections of this Part. 
Schedule F, Service Level Requirements 
84 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
MONTHLY 
Service Level 
Operational 
Technical 
Throughput 
System Performance 
AFR 
SERVICE 
Criteria 
Availability 
Support 
SCORE 
Central  Central 
P-M 
M- Quoted 
Site  Ten Print 
Mark 
P-P  P-M 
M-P 
Service 
AFR 
Measure 
Ao  - 
Ao  - 
SCC 

CRO 
 
A
Throughput Throughput Perf. Perf. 
Perf. 
Support  Accuracy 
Primary  DRS 

Perf. 
Perf.  Perf. 
Weight 
0.07 
0.03  0.10 
0.10 
0.10 
0.10  0.05  0.0  0.10  0.05  0.05 
0.15 
0.10 
 
Avon + Somerset   
 
 
 
 
 
 
 
 
 
 
 
 
 
Bedfordshire 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
British Transport   
 
 
 
 
 
 
 
 
 
 
 
 
 
Police 
Cambridgeshire 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Cheshire 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
City of London  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Cleveland 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Cumbria 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Customs and 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Excise 
Derbyshire 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Devon + 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Cornwall 
Dorset 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Durham 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Dyfed Powys 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Essex 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Gloucestershire 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Greater 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Manchester 
Gwent 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Hampshire 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Hertfordshire  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Humberside 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Schedule F, Service Level Requirements 
85 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
MONTHLY 
Service Level 
Operational 
Technical 
Throughput 
System Performance 
AFR 
SERVICE 
Criteria 
Availability 
Support 
SCORE 
Central  Central 
P-M 
M- Quoted 
Site  Ten Print 
Mark 
P-P  P-M 
M-P 
Service 
AFR 
Measure 
Ao  - 
Ao  - 
SCC 

CRO 
 
A
Throughput Throughput Perf. Perf. 
Perf. 
Support  Accuracy 
Primary  DRS 

Perf. 
Perf.  Perf. 
Weight 
0.07 
0.03  0.10 
0.10 
0.10 
0.10  0.05  0.0  0.10  0.05  0.05 
0.15 
0.10 
 
Kent 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Lancashire 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Leicestershire 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Lincolnshire 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Merseyside 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Metropolitan  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
N.I.S./Residual 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Bureau 
Norfolk 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
North Wales 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
North Yorkshire   
 
 
 
 
 
 
 
 
 
 
 
 
 
Northamptonshire  
 
 
 
 
 
 
 
 
 
 
 
 
 
Northumbria 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nottinghamshire    
 
 
 
 
 
 
 
 
 
 
 
 
 
South Wales  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
South Yorkshire    
 
 
 
 
 
 
 
 
 
 
 
 
 
Staffordshire  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Suffolk 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Surrey 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Sussex  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Thames Valley 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Warwickshire 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
West Mercia 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
West Midlands 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Schedule F, Service Level Requirements 
86 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
MONTHLY 
Service Level 
Operational 
Technical 
Throughput 
System Performance 
AFR 
SERVICE 
Criteria 
Availability 
Support 
SCORE 
Central  Central 
P-M 
M- Quoted 
Site  Ten Print 
Mark 
P-P  P-M 
M-P 
Service 
AFR 
Measure 
Ao  - 
Ao  - 
SCC 

CRO 
 
A
Throughput Throughput Perf. Perf. 
Perf. 
Support  Accuracy 
Primary  DRS 

Perf. 
Perf.  Perf. 
Weight 
0.07 
0.03  0.10 
0.10 
0.10 
0.10  0.05  0.0  0.10  0.05  0.05 
0.15 
0.10 
 
West Yorkshire 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Wiltshire 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Ext. Transaction   
 
 
 
 
 
 
 
 
 
 
 
 
 
Bureau 
Weight   
0.25 
0.00  0.40 
0.00 
0.00 
0.00  0.00  0.00  0.00  0.00  0.00 
0.30 
0.05 
 
Hendon Training   
 
 
 
 
 
 
 
 
 
 
 
 
 
Centre 
Durham Training   
 
 
 
 
 
 
 
 
 
 
 
 
 
Centre 
Monthly Service   
 
 
 
 
 
 
 
 
 
 
 
 
 
Score 
Figure 4.1-1  Service Scores for Individual Bureaux 
 
Schedule F, Service Level Requirements 
87 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Service 
Service 
Service 
Service 
Service 
Current 
Score 
Score 
Score 
Score 
Score 
Month 
IDENT1 Site Bureaux 
Month 
Month 
Month 
Month 
Month 
(CM) 
CM - 5  
CM - 4 
CM -3 
CM - 2 
CM - 1 
Service 
Score 
Avon + Somerset 
 
 
 
 
 
 
Bedfordshire 
 
 
 
 
 
 
British transport Police 
 
 
 
 
 
 
Cambridgeshire 
 
 
 
 
 
 
Cheshire 
 
 
 
 
 
 
City of London 
 
 
 
 
 
 
Cleveland 
 
 
 
 
 
 
Cumbria 
 
 
 
 
 
 
Customs and Excise 
 
 
 
 
 
 
Derbyshire 
 
 
 
 
 
 
Devon + Cornwall 
 
 
 
 
 
 
Dorset 
 
 
 
 
 
 
Durham 
 
 
 
 
 
 
Dyfed Powys 
 
 
 
 
 
 
Essex 
 
 
 
 
 
 
Gloucestershire 
 
 
 
 
 
 
Greater Manchester 
 
 
 
 
 
 
Gwent 
 
 
 
 
 
 
Hampshire 
 
 
 
 
 
 
Hertfordshire 
 
 
 
 
 
 
Humberside 
 
 
 
 
 
 
Kent 
 
 
 
 
 
 
Lancashire 
 
 
 
 
 
 
Leicestershire 
 
 
 
 
 
 
Schedule F, Service Level Requirements 
88 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
Lincolnshire 
 
 
 
 
 
 
Merseyside 
 
 
 
 
 
 
Metropolitan 
 
 
 
 
 
 
N.I.S./Residual Bureau 
 
 
 
 
 
 
Norfolk 
 
 
 
 
 
 
North Wales 
 
 
 
 
 
 
North Yorkshire 
 
 
 
 
 
 
Northamptonshire 
 
 
 
 
 
 
Northumbria 
 
 
 
 
 
 
Nottinghamshire 
 
 
 
 
 
 
South Wales 
 
 
 
 
 
 
South Yorkshire 
 
 
 
 
 
 
Staffordshire 
 
 
 
 
 
 
Suffolk 
 
 
 
 
 
 
Surrey 
 
 
 
 
 
 
Sussex 
 
 
 
 
 
 
Thames Valley 
 
 
 
 
 
 
Warwickshire 
 
 
 
 
 
 
West Mercia 
 
 
 
 
 
 
West Midlands 
 
 
 
 
 
 
West Yorkshire 
 
 
 
 
 
 
Wiltshire 
 
 
 
 
 
 
External Transaction Bureau 
 
 
 
 
 
 
Hendon Training Centre 
 
 
 
 
 
 
Durham Training Centre 
 
 
 
 
 
 
Overall Service Score 
 
 
 
 
 
 
Figure 4.1-2.  Service Scores for Individual Bureaux 
Schedule F, Service Level Requirements 
89 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
4.2 
Score Adjustment 
At  the  Monthly  Service  Review,  the  Contractor  shall  present  to  the  Authority  any  score 
adjustments that  must  be made.    The  charges awarded  to  the  Contractor as a  result  of these 
scores are established in Schedule E (Pricing).  Score adjustments may be made as a result of: 
Under Performance.  If, in any monthly reporting period, the Service Level Score for any of 
the five Service Level Criteria at any site is at the minimum allowable Service Level Score, 
then the Contractor will not be awarded a charge above 100% in that month even if Service 
Level Scores in other Service Level Criteria at other sites are above 100%.  This is to ensure 
adequate levels of service in all areas.   
Excessive Bureau Workload. If, in any monthly reporting period, the workload generated by a 
Fingerprint  Bureau  is  above  its  Bureau  Maxima  by  volume,  priority,  or  geographic  search 
scope  (identified  in  Section  5),  then  the  bureau’s  performance  value  will  be  adjusted  as 
follows:  
(a) 
Print-to-Print Searches 
(i) 
If the monthly Bureau Maximum is exceeded, and the achieved performance 
is lower than 90, adjust the performance value to 90.   
(ii) 
If  the  excess  workload  is  greater  than  20%  of  the  Bureau  Maximum  adjust 
the performance value to 100.  
(b) 
Print-to-Mark, Mark-to-Print, Mark-to-Mark Searches 
(i) 
If the monthly Bureau Maximum is exceeded, and the achieved performance 
is lower than 90, adjust the performance value to 90. For those bureaux that 
may perform 100% National searches, this adjustment is made before adding 
the ten print National search compensation value. 
(ii) 
If  the  excess  workload is greater  than  20% of  the  Bureau Maximum,  adjust 
the performance value to 100.   
(iii) 
If National searches are more than 5% for any of the search priorities and the 
achieved  performance is  lower  than  90,  adjust the  performance  value to  90.  
This does not apply to those Bureaux that may perform up to 100% National 
searches. 
(iv) 
If National searches are greater than 10% of the monthly Bureau Maximum, 
and the monthly Bureau Maximum has been exceeded adjust the performance 
value  to  100. This  does  not  apply  to  those  Bureaux  that  may  perform  up  to 
100% National searches. 
(v) 
Post TOR, this section will be rewritten as the table at Figure 5.2- is updated. 
Excessive National Workload.  If, in any monthly reporting period, the workload generated by 
the Fingerprint Bureaux collectively is above the National Maxima by priority or geographic 
search  scope  (identified  in  Section  5,  Figure  5.2-),  then  the  Service  Level  Score  will  be 
adjusted to a level of at least 100% for the Search Performance Service Level Criteria.  If the 
unadjusted aggregate Service Level Score for the Search Performance Service Level Criteria 
is above 100%, that computed, unadjusted score will remain.  
Other Exceptions.   
Schedule F, Service Level Requirements 
90 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
(c) 
If,  in  any  reporting  period,  Bureau(x)  working  practices  or  other  exceptions 
detrimentally affect a Service Measure, the Authority may, at its discretion, adjust the 
final Service Score (and thus the Service Charges computed as a result of the Service 
Score  adjustment)  of  any  Service  Level  Criteria  based  on  a  documented  claim  for 
Charge Adjustment provided by the Contractor.   
(d) 
If, in any reporting period, occurrence of a disaster renders a Bureau inoperable, then 
the  Disrupted  Bureau’s  Monthly  Service  Score  (and  thus  the  Service  Charges 
computed as a result of the Service Score adjustment) will be set to 100. This score 
adjustment for the Disrupted Bureau will continue as long as the Bureau is inoperable 
and  will  continue  should  the  Disrupted  Bureau  choose  to  operate  in  a  Reciprocal 
Bureau arrangement. 
(e) 
Reciprocal Bureau Operations 
(i) 
If,  in  any  reporting  period,  a  Disrupted  Bureau  operates  in  a  Reciprocal 
Bureau  arrangement,  then  the  Monthly  Service  Score  (and  thus  the  Service 
Charges  computed  as  a  result  of  the  Service  Score  adjustment)  for  the 
Reciprocal  Bureau  processing  transactions  from  both  the  Disrupted  Bureau 
and  the  Reciprocal  Bureau  will  be  set  to  the  maximum  score.  The  Monthly 
Service Score of the Disrupted Bureau will be set to 100. 
(f) 
Emergency Bureau Operations 
(i) 
If,  in  any  reporting  period,  a  Disrupted  Bureau  operates  at  the  Emergency 
Bureau,  then  the  Disrupted  Bureau’s  Monthly  Service  Score  (and  thus  the 
Service  Charges  computed  as  a  result  of  the  Service Score  adjustment)  will 
be set to the maximum score. 
It  will  be  the  responsibility  of  the  Authority  to  inform  a  bureau  of  any  excess  workload 
submitted  by  the  bureau  and  to  make  policy  changes  to  reduce  the  excess  workload,  if 
necessary.    The  Authority  may  elect  to  initiate  a  formal  change  with  the  Contractor  to 
accommodate  the  excess  workload.    In  the  event  that  a  loss  of  Availability  in  one 
measurement  period  (as  defined  in  Section  2.1)  causes  a  bureau  to  exceed  its  maximum 
workloads  in  a  following  period,  the  Contractor  will  not  receive  any  service  score  above 
100% in respect of that period 

IDENT1 WORKLOAD 
5.1 
National Workload and Sizing Data 
The installed IDENT1 configuration will meet the service levels necessary to support actual 
Police Force workloads, up to the annual Contract Maximum.  IDENT1 may be expanded to 
support workloads in excess of the Contracted Maximum, albeit with additional charges.   
The  annual  Contracted  Maximum  workload  for  each  Bureau  is  expressed  as  the  number  of 
Ten  Prints  and  Marks  processed  by  the  system  and  the  number  retained  in  the  Unified 
Collections.  These figures are defined below for 2004 (figures are derived from the IDENT1 
Detailed Operational Requirement as stated). 
Annually, the figures in 5.1-1 and 5.2-1 will be refreshed using the source figure for the new 
year given in the DOR tables stated in Figure 5.1-1. 
Certain aspects of the IDENT1 service are determined by sizing data inherent in the nature of 
fingerprint  processing.    The  service  provided,  as  specified  in  this  SLR,  takes  into 
Schedule F, Service Level Requirements 
91 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
consideration  these  maximum  workloads  and  sizing  data.    Engineering  margins  have  been 
built into the IDENT1 design to accommodate minor variations of the distribution of the total 
search load between the search types from that specified in DOR Table 2.18. 
Year of Operation
2004
Derivation (ITT DOR references)
Total Ten Print Database Size
     7
  ,529,000 Table 2.7 
Total Ten Prints Received and 
Processed
     2
  ,880,000 Table 2.13 distributed according to Table 2.14  
Total Mark Database Size
     1
  ,238,400 Table 2.10
Total Marks submitted
        8
  89,500 Table 2.16 distributed according to Table 2.11
Total Searches
     7
  ,570,680 Table 2.17
Unverified Identity Check         4
  69,382 Table 2.18 
Other P-P      1
  ,559,560 Table 2.18
Total P-M      3
  ,278,104 Table 2.18 
Total M-P      2
  ,248,492 Table 2.18 
Total M-M           1
  5,141 Table 2.18
 
Figure 5.1-1.  National Workload 
The maximum National workloads in Figure 5.1-1 are represented as yearly totals for 2004.  
The Service Level Criteria presented in Section 2 are based on monthly workload values.  The 
monthly workload values presented in Section 5.2 of this SLR are assumed to be one twelfth 
(1/12) of those shown in Figure 5.1-1.  Actual Bureau workload may vary.   
Note that the figures in this section provide capacity for Scottish Bureaux at TOR, albeit that 
the Bureaux won’t be added to the SLR until a later milestone. 
5.2 
Bureau Workload 
This  section  defines  Bureau  workload  as  a  proportion  of  the  National  Ten  Print  and  Mark 
workloads presented in Section 5.1. Figure 5.2-1 presents the Maximum Monthly Workload 
figures  for  each  Bureau.    Taken  together,  these  values  represent  one-twelfth  (1/12)  of  the 
annual National Workload as presented in Figure 5.1-1. 
Schedule F, Service Level Requirements 
92 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
M o n th ly n o n-
T otal P rin ts  
v e rified  
M on thly P -
M on thly P - T o ta l M arks  
M o n th ly M -
M o nth lyM -
S u b m itted  
id en tity 
P  S ea rc h es   M  
S u b m itte d 
P  S e arc he s  M  
M on th ly
ch e ck
(P P m ax )
S e arc he s
M o nthly
(M P m ax )
S ea rc h es
A von &  S om erset 
5,52 0
1,017
3,379
7,103
4 ,67 0
4,872
33
B edfordshire 
6,24 0
1,134
3,769
7,922
81 5
5,434
37
 C am bridge sh ire 
2,16 0
469
1,560
3,278
1 ,11 2
2,248
15
C he sh ire 
3,36 0
313
1,040
2,185
66 7
1,499
10
C ity of Lon don 
4 80
39
130
273
44 5
187
1
C le veland  
2,88 0
274
910
1,912
1 ,18 6
1,312
9
C um bria 
2,40 0
508
1,690
3,551
14 8
2,436
16
D erb ysh ire 
3,36 0
391
1,300
2,732
59 3
1,874
13
D evo n a nd C ornw a ll 
5,52 0
665
2,209
4,644
81 5
3,185
21
D orset 
1,92 0
587
1,949
4,098
66 7
2,811
19
D urh am  
2,88 0
274
910
1,912
1 ,18 6
1,312
9
D yfed P ow ys 
3,12 0
430
1,430
3,005
22 2
2,061
14
E ssex 
4,56 0
548
1,819
3,824
1 ,70 5
2,623
18
G loucestershire 
1,92 0
469
1,560
3,278
37 1
2,248
15
G re ate r M an ch ester 
1 2,48 0
2,347
7,798
16,391
6 ,07 8
11,242
76
G w ent 
2,88 0
430
1,430
3,005
51 9
2,061
14
H am pshire 
8,40 0
978
3,249
6,829
1 ,33 4
4,684
32
H ertfordshire 
2,88 0
430
1,430
3,005
1 ,92 7
2,061
14
H um be rside 
4,08 0
508
1,690
3,551
7 4
2,436
16
K ent 
6,96 0
1,056
3,509
7,376
2 ,44 6
5,059
34
Lan ca sh ire 
5,76 0
1,330
4,419
9,288
2 ,29 8
6,371
43
Leice stershire 
2,64 0
548
1,819
3,824
1 ,33 4
2,623
18
Lin co lnshire 
2,16 0
235
780
1,639
22 2
1,124
8
M erseyside  
6,72 0
1,291
4,289
9,015
1 ,48 3
6,183
42
M etropolita n 
2 2,32 0
6,689
22,224
46,713
15 ,04 7
32,041
216
N orfolk 
2,64 0
508
1,690
3,551
59 3
2,436
16
N orth W ales 
2,40 0
352
1,170
2,459
29 7
1,686
11
N orth Yorkshire 
2,40 0
352
1,170
2,459
59 3
1,686
11
N ortham ptonshire  
2,64 0
704
2,339
4,917
1 ,48 3
3,373
23
N orthum bria  
9,84 0
743
2,469
5,190
29 7
3,560
24
N ottingha m shire  
5,04 0
508
1,690
3,551
1 ,03 8
2,436
16
S outh W a les 
6,24 0
665
2,209
4,644
89 0
3,185
21
S outh Yorksh ire 
7,20 0
430
1,430
3,005
1 ,26 0
2,061
14
S ta ffordshire 
3,60 0
900
2,989
6,283
1 ,55 7
4,310
29
S uffolk 
1,92 0
156
520
1,093
7 4
749
5
S urrey 
2,40 0
430
1,430
3,005
74 1
2,061
14
S ussex 
4,56 0
782
2,599
5,464
81 5
3,747
25
T ham es V alley 
7,20 0
1,291
4,289
9,015
2 ,52 0
6,183
42
W arw ickshire  
1,92 0
235
780
1,639
22 2
1,124
8
W est M ercia 
3,84 0
391
1,300
2,732
59 3
1,874
13
W est M idlands 
1 5,84 0
1,682
5,588
11,747
1 ,55 7
8,057
54
W est Yorkshire 
1 0,56 0
2,542
8,448
17,756
6 ,96 8
12,179
82
W iltshire 
1,68 0
274
910
1,912
7 4
1,312
9
A berde en
1 4
D un dee
1 4
Includ ed below
Included  be low
E dinb urgh
1 9
G lasgow
1 4,11 2
S cottish F ingerprin t 
S ervice
2,542
8,448
17,756
4 ,52 2
12,179
82
B ritish T ranspo rt 
P olice  
1,44 0
117
390
820
0
562
4
H M  C ustom s &  
E xcise 
2 40
39
130
273
0
187
1
N ation al Ide ntification  
S ervice 
8,40 0
508
1,690
3,551
89 0
2,436
16
N ation al C rim e 
S quad  
2 40
0
0
0
0
0
0
S pecialist C rim es 
B ureau  
0
0
0
0
0
0
0
T O T AL  
24 0,00 0
39 ,11 5
1 29 ,9 63
27 3 ,17 5
7 4,3 47
18 7,37 4
1 ,26 2
 
Figure 5.2-1  Bureau Maximum Monthly Workload  
Schedule F, Service Level Requirements 
93 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
The figure above shows the Bureau Monthly Maximum Ten Print and Mark workloads based on each 
Bureau’s  proportion  of  the  National  Ten  Print  and  Mark  workload  at  2004.  As  stated  above,  these 
figures  will  be refreshed  annually.    The  workload is then  distributed  according  to  search  type:  non-
verified  Live  ID,  Print-to-Print,  Print-to-Mark,  Mark-to-Print,  and  Mark-to-Mark.  Note  that 
engineering margins have been built into the IDENT1 design to accommodate minor variations of the 
distribution of the total search load between the search types from that specified in DOR Table 2.18. 
Bureau workload is based on a set of assumptions presented in Figure 5.2-2.  These assumptions are 
derived  from  the  DOR  and  the  NAFIS  SLA,  were  used  in  the  design  of  IDENT1  and  establish  the 
operational limits of the system.  The assumptions are valid at TOR. At FOC, the FAST priority will 
be  eliminated  and  its  allocated  percentages  combined  with  those  of  the  NORMAL  priority.  In 
addition,  the  geographically  based  search  scope  will  be  adjusted  to  meet  the  Authority’s  database 
penetration requirements as stated in the DOR (Table titled “Authority Indicative Response Times for 
Searches of the Unified Collection”)  
TEN PRINT PROCESSING
Quoted CRO Image Retrievals
69%
Print-to-Print AFR Searches
 o  % URGENT Submissions
10.90%
 o  % FAST Submissions
22.20%
 o  % NORMAL Submissions
66.90%
Print-to-Mark AFR Searches
 o  % URGENT Submissions
2.60%
 o  % FAST Submissions
32.40%
 o  % NORMAL Submissions
65.00%
MARK PROCESSING
Mark-to-Print AFR Searches
 o  % URGENT Submissions
2.60%
 o  % FAST Submissions
32.40%
 o  % NORMAL Submissions
65.00%
M-M AFR Searches
 o  % URGENT Submissions
2.60%
 o  % FAST Submissions
32.40%
 o  % NORMAL Submissions
65.00%
SEARCH SCOPE
P-M, M-P, and M-M Searches
 o  National
5.00%
 o  Regional
50.00%
 o  Local
45.00%  
Figure 5.2-2 National Work Profiles 
This  SLR  has  used  this  set  of  assumptions  to  estimate  the  workloads  expected  during  normal 
operations.   Assumptions 1 through 12, 14 and 15 apply only from TOR until FOC. 
(1) 
Quoted CRO Image Retrieval quantities will be at least 60% of the total Ten Prints received 
and  processed  by  the  Police  Forces.  (derived  from  DOR  (Inf-NF-640)  “Of  the  Print  Sets 
received, current statistics indicate that approximately 69% are Recidivists, with an existing 
Schedule F, Service Level Requirements 
94 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
criminal record, and 31% have no prior entry on the existing system.”) 
(2) 
Print-to-Print Urgent priority AFR search quantities will be no more than 10.90% of all Ten 
Prints submitted for a Print-to-Print AFR search. 
(3) 
The combination of Print-to-Print Urgent and Fast priority AFR search quantities will be no 
more than 33.10% of all Ten Prints submitted for a Print-to-Print AFR search. 
(4) 
Print-to-Mark Urgent priority AFR search quantities will be no more than 2.60% of all Ten 
Prints submitted for a Print-To-Mark AFR search. 
(5) 
The combination of Print-To-Mark Urgent and Fast priority AFR search quantities will be no 
more than 35.00% of all Ten Prints submitted for a Print-to-Mark AFR search. 
(6) 
Mark-to-Print Urgent priority AFR search quantities will be no more than 2.60% of all Marks 
submitted for a Mark-to-Print AFR search. 
(7) 
The combination of Mark-to-Print Urgent and Fast priority AFR search quantities will be no 
more than 35.00% of all Marks submitted for a Mark-to-Print AFR search. 
(8) 
Mark-to-Mark Urgent priority AFR search quantities will be no more than 2.60% of all Marks 
submitted for a Mark-to-Mark AFR search. 
(9) 
The combination of Mark-to-Mark Urgent and Fast priority AFR search quantities will be no 
more than 35.00% of all Marks submitted for a Mark-to-Mark AFR search. 
(10) 
National  search  scope  quantities  will  be  no  more  than  5.00%  of  each  priority  search  type 
within Print-to-Mark, Mark-to-Print, and Mark-to-Mark AFR searches.  
(11) 
Regional level search scope quantities will be no more than 50% of each priority search type 
within Print-to-Mark, Mark-to-Print, and Mark-to-Mark AFR searches.   
(a) 
A local search is defined as a search of the ‘home’ force area only.   
(b) 
A regional search is defined as a search involving a minimum of one station 
and  a  maximum  of  five  police  force  areas.    This  may  include  the  ‘home’ 
force but other forces selected do not have to be contiguous with it. 
(c) 
A national search is defined as a search of the full unified database (i.e., all 
forces) 
(12) 
Local  level  search  scope  quantities  will  be  at  least  45%  of  each  priority  search  type  within 
Print-to-Mark, Mark-to-Print, and Mark-to-Mark AFR searches. 
(13) 
All Operational Response searches will be processed as Normal priority. 
(14) 
British Transport Police searches may be 100% National searches rather than the percentages 
defined above. 
(15) 
Customs  and  Excise  Service  searches  may  be  100%  National  searches  rather  than  the 
percentages defined above. 
(16) 
All  Immigration  and  Nationality  Directorate  P-P  searches  will  be  processed  as  Normal 
priority. 
(17) 
All Immigration and Nationality Directorate P-M searches will be processed as Low priority. 
Schedule F, Service Level Requirements 
95 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009 
 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 16th July 2009 
(18) 
The workload from the Immigration and Nationality Directorate will be 10% CRO retrievals 
and up to 90% Print-to-Print searches. 
Schedule F, Service Level Requirements 
96 
Signature Version 
Part 2 Operations Service Level  
Released under FOI in full on 16th July 2009