PITO
IDENT1 CONTRACT
Northrop Grumman
Released under FOI in full on 15th July 2008
SCHEDULE K
SECURITY
Schedule K (Security)
Signature Version
Released under FOI in full on 15th July 2008
PITO
IDENT1 CONTRACT
Northrop Grumman
Released under FOI in full on 15th July 2008
CONTENTS
1
INTRODUCTION....................................................................................................................1
2
BACKGROUND.......................................................................................................................1
3
GUIDANCE ON THE SECURITY PRINCIPLES AND PROTECTIVE MARKING OF
ASSETS FOR IDENT1............................................................................................................1
4
ACCREDITATION .................................................................................................................4
5
GUIDANCE ON PERSONNEL VETTING ..........................................................................5
ANNEX K-1 GLOSSARY OF DEFINITIONS .................................................................................7
Schedule K (Security)
i
Signature Version
Released under FOI in full on 15th July 2008
PITO
IDENT1 CONTRACT
Northrop Grumman
Released under FOI in full on 15th July 2008
1
INTRODUCTION
1.1
This Schedule details the security requirements which the Contractor shall abide by for the
provision of IDENT1. It gives a brief overview of the security requirements for the provision
of Services under this Contract and sets out the responsibilities incumbent upon the
Contractor in relation to all activities in support of the provision of the Services. These
requirements therefore apply not only to the Services, but to the Contractor’s procedures,
staff, facilities and systems which are used in association with the provision of the Services.
The Authority may, according to English Law and to Treaties between the United Kingdom
and other Countries, from time to time amend this Schedule (or Schedule D (Detailed
Operational Requirements)) and any associated annexes which will clarify, augment or
supersede the provisions of this Schedule without recourse to Schedule L (Change Control
Procedures). The Contractor, its subcontractors and agents shall adhere to the provisions of
this Schedule and to any subsequent amendments or annexes.
1.2
The Requirements relating directly to the IDENT1 Service are set out in Schedule D
(Detailed Operational Requirements).
1.3
Definitions
The Glossary of Terms attached at Annex K-1 applies to this Schedule K (Security) only.
2
BACKGROUND
2.1
This Contract requires the Contractor to hold UK Protectively Marked material (that is,
material which is classified under the UK Government Protective Marking Scheme)
according to the prescribed standards. The standard of protection prescribed varies with the
level of protective marking.
2.2
The Contractor shall submit the IDENT1 Service to formal accreditation by the National
Accreditor for Police Systems and achieve formal accreditation by that body. The Accreditor
is responsible to the Police Information Assurance Board (PIAB), a sub-committee of the
ACPO Information Management Business Area. Both the PIAB and ACPO IMBA have
Scottish representation.
3
GUIDANCE ON THE SECURITY PRINCIPLES AND PROTECTIVE MARKING OF
ASSETS FOR IDENT1
3.1
General Principles
3.1.1 These security aspects are based upon UK Government information protection and
security guidelines, and are aligned with the security requirements for the Services,
including those security requirements set out in Schedule D (Detailed Operational
Requirements).
3.1.2 Disclosure of Protectively Marked Assets must be strictly in accordance with the
‘Need to Know’ principle. It must be confined to those Contractor employees whose
access to the Assets is essential for the purpose of the Contract.
3.1.3 The Contractor shall obtain prior written approval of the Authority before any
Protectively Marked documents, knowledge, information, data or hardware is
released or passed to any third party, and in particular to any foreign government,
organisation, company or individual.
3.2
Personnel Security
Schedule K (Security)
1
Signature Version
Released under FOI in full on 15th July 2008
PITO
IDENT1 CONTRACT
Northrop Grumman
Released under FOI in full on 15th July 2008
3.2.1 The Contractor shall warn individuals having access to Protectively Marked Assets
against divulging them to any unauthorised party and shall inform individuals that the
Official Secrets Acts 1911-1989 apply to them.
3.2.2 Unless otherwise agreed with the Authority the Contractor shall submit its entire staff
nominated to work on IDENT1 for security vetting by the Authority. The Authority
will endeavour to progress vetting applications in a timely manner, in association
with the Government Department(s) responsible.
(a)
The Contractor shall ensure that staff nominated to work on IDENT1 who
need privileged access to (NAFIS), SAFR and IDENT1 operational Assets,
namely systems administrators, key operational support staff and developers,
have been security cleared to SC level before they take up duty in such roles.
(b)
The Contractor shall ensure that staff nominated to work on IDENT1 who
require access to certain Police Force’s Information Technology installations,
such as data centre or data communications rooms, have been security cleared
to SC level before they take up duty in such roles.
(c)
The Contractor shall ensure that staff nominated to work on IDENT1 who
need access to certain Police Force establishments, other than access to areas
as detailed in Clause 3.2.2(b) above, have been security cleared to CTC level
in addition to the standard BC clearance level before they take up duty in
such roles.
(d)
The Contractor shall ensure that all other staff nominated to work on IDENT1
who are not covered by the provisions of Clauses 3.2.2(a), 3.2.2(b) and
3.2.2(c) above shall be cleared to BC level at a minimum before they take up
duty on IDENT1.
3.3
Asset Classification
3.3.1 Material passed to the Contractor by the Authority will bear the Protective Marking
appropriate to it.
3.3.2 All Assets provided by the Contractor in relation to the delivery of the IDENT1
Service shall be classified and Protectively Marked as follows:
(a)
Assets which do not contain sensitive information, or which contain
information which is already authorised to be in the public domain, should
not be protectively marked. Optionally, for clarity, such assets may be
marked NOT PROTECTIVELY MARKED.
(b)
Assets which contain information which the Authority considers to be
RESTRICTED, or which contain your proprietary technical or commercial
information which you do not wish to be disclosed into the public domain, or
the disclosure of which to unauthorised third parties would prejudice your
tender or your competitive position, should be marked RESTRICTED.
(c)
Assets which are protectively marked may additionally contain a descriptor
where this helps to identify to others the nature of the sensitivity and the
groups, roles or people to whom access to the information should be
confined.
Schedule K (Security)
2
Signature Version
Released under FOI in full on 15th July 2008
PITO
IDENT1 CONTRACT
Northrop Grumman
Released under FOI in full on 15th July 2008
3.3.3 As an example, documents in relating to technical solutions, or pricing, should be
protectively
marked
RESTRICTED,
RESTRICTED
–
COMMERCIAL,
RESTRICTED – CONTRACTS or RESTRICTED – IDENT1; whereas copies of
public domain company financial statements or product brochures should not be
protectively marked.
3.3.4 Should the Authority need to apply a protective marking of CONFIDENTIAL or
above to any Assets, the Authority will inform the Contractor of appropriate
instructions for managing such Assets. In the absence of such specific instructions,
the aspects described in this Schedule shall apply by default.
3.3.5 The legacy protective marking of COMMERCIAL-IN-CONFIDENCE is equivalent
to RESTRICTED – COMMERCIAL.
3.3.6 Documents which do not attract a protective marking should not be protectively
marked, as this would impose unnecessarily onerous overheads upon all Parties; nor
should documents be unnecessarily ‘over classified’ as this dilutes the value of the
protective marking scheme.
3.3.7 Further information on protective marking is set out in the enclosed leaflet entitled
“Handling of Protectively Marked Material – A Guide for Police Personnel (October
2001)”.
3.4
Transmission within Company Premises
Protectively Marked Assets shall be transmitted within the Contractor’s premises only in such
a way as to ensure that no unauthorised person has access.
3.5
Use of Automated Processing Systems
The use of automated processing systems for the management of Protectively Marked
IDENT1 and associated Assets shall be subject to approval and accreditation as part of the
IDENT1 accreditation process as detailed in Clause 4 below by the National Accreditor for
Police systems. Additionally physical site visits may be made as part of the Accreditation
process by the Accreditor or authorised agents approved by the Authority. Where the
Contractor provides the necessary assurance that the ‘Need To Know’ principle is being
enforced, that any risk of compromise of Assets is being mitigated, then approval and/or
accreditation will not be unreasonably withheld.
3.6
Use of Mobile or Home Working Computers
The Contractor shall use mobile or home working automated processing systems only as
approved and accredited according to Clause 4 below. Any Contractor’s mobile or home
working computer used to process or store such information should not be transported outside
of the UK without prior written approval of the Authority.
3.7
Transmission Outside Contractor’s Premises
3.7.1 In addition to the use of CAPS approved cryptographic products, the Authority
approves the use of the PGP V8.0 or later commercial cryptographic product for the
protection of RESTRICTED Assets whilst in transit (including over the public
internet) and in storage electronically.
Schedule K (Security)
3
Signature Version
Released under FOI in full on 15th July 2008
PITO
IDENT1 CONTRACT
Northrop Grumman
Released under FOI in full on 15th July 2008
3.7.2 The Contractor shall not transmit Protectively Marked information via IT networks or
via the public internet in any other way without the prior written approval of the
Authority.
3.8
Transmission Abroad
Subject to the provisions of the Data Protection Act 1998, the Authority authorises shipment
of RESTRICTED assets outside the UK by first class mail, by overnight commercial
delivery services or hand-carried (with courier certificate), where the material is double
wrapped, with the protective marking shown on the inner wrapper but not however on the
outer wrapper.
3.9
Loss
Any loss or compromise of Protectively Marked Assets by the Contractor, its subcontractors
or agents shall be reported by the Contractor to the Authority without delay.
3.10
Destruction
As soon as they are no longer required, the Contractor shall return protectively marked
operational Assets and document originals and master copies to the Authority. Protectively
Marked non-operational Assets shall be destroyed by the Contractor in such a way as to make
reconstitution very difficult or impossible, for example, by burning, shredding, tearing into
small pieces or degaussing. Protectively Marked non-operational Assets which are not
required by the Contractor but which cannot be destroyed in such a way shall be returned by
the Contractor to the Authority.
3.11
Operational Assets
The Contractor shall treated all operational IDENT1 data, information and other Assets,
including legacy NAFIS, SAFR and Police Service data, information and other Assets that do
not possess an explicit Protective Marking, as RESTRICTED.
4
ACCREDITATION
4.1
The Contractor shall submit the IDENT1 Service and all supporting Contractor and
subcontractor facilities to formal accreditation by the National Accreditor for Police Systems
and obtain formal accreditation prior to TOR. Where appropriate, the Authority will take
advice on this matter from CESG and the Security Service. Thereafter, the IDENT1 Service
and all supporting Contractor and subcontractor facilities shall be submitted for and obtain
accreditation at least once every two years or at such time as the Accreditor deems
appropriate.
4.2
The Contractor shall conduct a formal Security Risk Assessment using a recognised risk
assessment methodology such as CRAMM.
4.3
The Accreditation process shall be against extant HMG Information Assurance Policy,
including, but not limited to, HMG IS 1-5.
4.4
The Accreditation process shall include an assessment against the ISO17799 standard. The
Contractor shall undertake an analysis of its own premises, staff, sub-contractors and
technical aspects as deemed appropriate by the Accreditor.
Schedule K (Security)
4
Signature Version
Released under FOI in full on 15th July 2008
PITO
IDENT1 CONTRACT
Northrop Grumman
Released under FOI in full on 15th July 2008
4.5
The Contractor shall supply all documents relevant to Accreditation and shall work closely
with the Accreditor to achieve Accreditation. For the avoidance of doubt, the Accreditor will
decide if a document shall be relevant to the Accreditation process.
4.6
The Contractor shall provide a single point of contact to which all security aspects will be
referred in the first instance.
4.7
The Contractor shall submit the system to an independent IT Health Check prior to formal
Accreditation; this shall be undertaken by a CESG CHECK approved consultant. The scope
of the Health Check shall be determined by the Accreditor. For the avoidance of doubt, the
requirement hereunder for a Health Check shall not replace the requirement as set out in
Section 13.3 of the Non-Functional Requirements of Schedule D (Detailed Operational
Requirements).
4.8
The Contractor shall provide to the Authority an Accreditation Document Set, the broad
format of which should be taken from HMG IS2 and accompanying documents (as set forth in
documents 49 to 56 of Schedule O (Documentation).
5
GUIDANCE ON PERSONNEL VETTING
5.1
The aim of personnel security vetting is to identify those persons who may pose a threat to
security and thereby, to exclude them from access to valuable Government assets, particularly
sensitive or protectively marked material and sensitive sites.
5.2
Personnel vetting requirements for IDENT1 can be roughly divided in two areas. One, where
access to Protectively Marked material is required and two, in areas where Protectively
Marked assets could be of use to criminals.
5.3
The vetting system in use by Government departments is detailed in HMG Manual of
Protective Security (MoPS). The defined vetting levels are as follows:
5.4
Security Check (SC)
5.4.1 is carried out when regular access to SECRET or occasional access to TOP
SECRET is involved;
5.4.2 involves a check of departmental records, where they exist, completion of a security
questionnaire, a criminal record check, a credit check and a check against security
records;
5.4.3 a subject interview may be carried out in a small proportion of cases;
5.4.4 is reviewed every ten (10) years; and
5.4.5 is reviewed after three (3) years for contractors.
5.5
Developed Vetting (DV)
5.5.1 is carried out only when long-term, frequent and uncontrolled access to TOP
SECRET information or to equivalent operations is involved;
5.5.2 involves all the process carried out for the Security Check, if these have not been
carried out already, has a subject interview and a field investigation, which will
involve interviews with referees and current and previous supervisors; and
Schedule K (Security)
5
Signature Version
Released under FOI in full on 15th July 2008
PITO
IDENT1 CONTRACT
Northrop Grumman
Released under FOI in full on 15th July 2008
5.5.3 is reviewed at varying intervals, usually five (5) years initially and thereafter every
seven (7) years. Reviews can he brought forward at any time at the discretion of the
DSO (Departmental Security Officer). In the case of people under twenty-one (21),
reviews may be annual.
5.6
Counter Terrorist Check (CTC):
5.6.1 is carried out where a building or site is considered to be at serious risk of terrorist
attack and also where information, possibly not protectively marked, is held which
may be of use to terrorists; and
5.6.2 involves the completion of a security questionnaire, a check of criminal and counter
terrorist records and very occasionally a subject interview.
5.7
Basic Check (BC):
5.7.1 is the minimum requirement for access to RESTRICTED and CONFIDENTIAL
material and for occasional access to SECRET, although in some agreed cases there
will be additional requirements;
5.7.2 is not a security check as such but is a package of pre-employment checks designed to
provide a level of assurance of probable reliability; and
5.7.3 involves a check of original personal documentation, such as passports, driving
licences etc. and the taking up of several references.
The National Accreditor may, at his discretion, authorise the Contractor perform checks of
Contractor staff equivalent to the Basic Check on behalf of the Authority.
5.8
Basic Check Enhanced (BC(E)):
5.8.1 is a Home Office enhanced check approved by Cabinet Office;
5.8.2 involves all the processes carried out for the Basic Check; and
5.8.3 involves a criminal record check.
Schedule K (Security)
6
Signature Version
Released under FOI in full on 15th July 2008
PITO
IDENT1 CONTRACT
Northrop Grumman
Released under FOI in full on 15th July 2008
ANNEX K-1
GLOSSARY OF DEFINITIONS
The defined terms below shall only apply to this Schedule.
Asset: any thing of value, either tangible or intangible, that is owned or used by an organisation or
business, including documents and information, materials or equipment, cash, operating systems,
employee knowledge and skills, etc.
Availability: the continuous or timely access to information, systems or physical assets by authorised
individuals.
Compromise: an accidental or deliberate violation of asset CONFIDENTIALITY or loss of
INTEGRITY or AVAILABILITY due to, for example, unauthorised disclosure, loss, theft,
destruction, tampering and deliberate or accidental damage.
Confidentiality: the restriction of information and other valuable assets to authorised individuals.
Integrity: the maintenance of information systems and physical assets in their complete and usable
form.
Protective Marking System: a method of assigning asset values to things to indicate an appropriate
level of security or protection required. Assets may be marked physically, for example, within headers
and footers on printed documents, or for risk management purposes, may be treated as if they are
marked.
Protective Markings: RESTRICTED, CONFIDENTIAL, SECRET and TOP SECRET are
standard terms used to convey the value levels of sensitive assets and the commensurate amount of
protection required for them.
Risk: the combination of threat and vulnerability. The probability or likelihood of an attack
succeeding or of damage being sustained as a result of compromise to an asset. An acceptable risk is
simply the level of risk that the manager is prepared to accept.
Risk Analysis: the process of determining the likelihood of an asset being compromised by
considering the vulnerabilities of the asset against the known threats to that asset.
Risk Management: the management process designed to reduce the risk of a successful attack to an
acceptable level, and to limit damage resulting from the compromise of an asset or assets. This is
achievable in several ways, for example, by acceptance of the risk; transference of part of the risk by
providing insurance or by moving the assets to another site; by implementing protective security. The
process necessarily involves a comprehensive analysis and assessment of the risks as a preliminary
step. Risk management is a dynamic process that needs to be kept under regular review.
Security Control: a method, device or activity designed to provide a degree of protection.
Threat: the probability or likelihood of an attack or a potentially compromising event taking place.
Where a threat is from a human source, it is influenced by such factors as the capability, resources and
intentions of those involved, and the value or attractiveness and accessibility of the asset.
Vulnerability: a feature or characteristic of an asset which could be exploited in an attack, for
example, a VDU which emits radiation, windows which could shatter scattering lethal splinters of
glass in an explosion, something which makes an asset particularly susceptible to compromise in the
event of a disaster, such as, sub-ground areas liable to flooding.
Schedule K (Security)
7
Signature Version
Released under FOI in full on 15th July 2008