This is an HTML version of an attachment to the Freedom of Information request 'IDENT1 contract'.
PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 15th July 2008 
SCHEDULE K 
SECURITY
Schedule K (Security) 
 
Signature Version 
 
Released under FOI in full on 15th July 2008 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 15th July 2008 
CONTENTS 
 

INTRODUCTION....................................................................................................................1 

BACKGROUND.......................................................................................................................1 

GUIDANCE ON THE SECURITY PRINCIPLES AND PROTECTIVE MARKING OF 
ASSETS FOR IDENT1............................................................................................................1 

ACCREDITATION .................................................................................................................4 

GUIDANCE ON PERSONNEL VETTING ..........................................................................5 
ANNEX K-1  GLOSSARY OF DEFINITIONS .................................................................................7 
 
 
Schedule K (Security) 

Signature Version 
 
Released under FOI in full on 15th July 2008 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 15th July 2008 

INTRODUCTION 
1.1 
This  Schedule  details  the  security  requirements  which  the  Contractor  shall  abide  by  for  the 
provision of IDENT1.  It gives a brief overview of the security requirements for the provision 
of  Services  under  this  Contract  and  sets  out  the  responsibilities  incumbent  upon  the 
Contractor  in  relation  to  all  activities  in  support  of  the  provision  of  the  Services.    These 
requirements  therefore  apply  not  only  to  the  Services,  but  to  the  Contractor’s  procedures, 
staff, facilities and systems which are used in association with the provision of the Services.  
The Authority may, according to English Law and to Treaties between the United Kingdom 
and  other  Countries,  from  time  to  time  amend  this  Schedule  (or  Schedule  D  (Detailed 
Operational  Requirements))  and  any  associated  annexes  which  will  clarify,  augment  or 
supersede the provisions of this Schedule without recourse to Schedule L (Change Control 
Procedures).  The Contractor, its subcontractors and agents shall adhere to the provisions of 
this Schedule and to any subsequent amendments or annexes. 
1.2 
The  Requirements  relating  directly  to  the  IDENT1  Service  are  set  out  in  Schedule  D 
(Detailed Operational Requirements). 
1.3 
Definitions 
The Glossary of Terms attached at Annex K-1 applies to this Schedule K (Security) only. 

BACKGROUND 
2.1 
This  Contract  requires  the  Contractor  to  hold  UK  Protectively  Marked  material  (that  is, 
material  which  is  classified  under  the  UK  Government  Protective  Marking  Scheme) 
according to the prescribed standards.  The standard of protection prescribed varies with the 
level of protective marking. 
2.2 
The  Contractor  shall  submit  the  IDENT1  Service  to  formal  accreditation  by  the  National 
Accreditor for Police Systems and achieve formal accreditation by that body.  The Accreditor 
is  responsible  to  the  Police  Information  Assurance  Board  (PIAB),  a  sub-committee  of  the 
ACPO  Information  Management  Business  Area.    Both  the  PIAB  and  ACPO  IMBA  have 
Scottish representation. 

GUIDANCE ON THE SECURITY PRINCIPLES AND PROTECTIVE MARKING OF 
ASSETS FOR IDENT1 
3.1 
General Principles 
3.1.1  These  security  aspects  are  based  upon  UK  Government  information  protection  and 
security  guidelines,  and  are  aligned  with  the  security  requirements  for  the  Services, 
including  those  security  requirements  set  out  in  Schedule  D  (Detailed  Operational 
Requirements). 
3.1.2  Disclosure  of  Protectively  Marked  Assets  must  be  strictly  in  accordance  with  the 
‘Need to Know’ principle. It must be confined to those Contractor employees whose 
access to the Assets is essential for the purpose of the Contract. 
3.1.3  The  Contractor  shall  obtain  prior  written  approval  of  the  Authority  before  any 
Protectively  Marked  documents,  knowledge,  information,  data  or  hardware  is 
released  or  passed  to  any  third  party,  and  in  particular  to  any  foreign  government, 
organisation, company or individual. 
3.2 
Personnel Security 
Schedule K (Security) 

Signature Version 
 
Released under FOI in full on 15th July 2008 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 15th July 2008 
3.2.1  The  Contractor  shall  warn  individuals  having  access  to  Protectively  Marked  Assets 
against divulging them to any unauthorised party and shall inform individuals that the 
Official Secrets Acts 1911-1989 apply to them. 
3.2.2  Unless otherwise agreed with the Authority the Contractor shall submit its entire staff 
nominated to work on IDENT1 for security vetting by the Authority.  The Authority 
will  endeavour  to  progress  vetting  applications  in  a  timely  manner,  in  association 
with the Government Department(s) responsible.   
(a) 
The  Contractor  shall  ensure  that  staff  nominated  to  work  on  IDENT1  who 
need  privileged  access  to  (NAFIS),  SAFR  and  IDENT1  operational  Assets, 
namely systems administrators, key operational support staff and developers, 
have been security cleared to SC level before they take up duty in such roles.   
(b) 
The  Contractor  shall  ensure  that  staff  nominated  to  work  on  IDENT1  who 
require access to certain Police Force’s Information Technology installations, 
such as data centre or data communications rooms, have been security cleared 
to SC level before they take up duty in such roles.   
(c) 
The  Contractor  shall  ensure  that  staff  nominated  to  work  on  IDENT1  who 
need access to certain Police Force establishments, other than access to areas 
as detailed in Clause 3.2.2(b) above, have been security cleared to CTC level 
in  addition  to  the  standard  BC  clearance  level  before  they  take  up  duty  in 
such roles.   
(d) 
The Contractor shall ensure that all other staff nominated to work on IDENT1 
who  are  not  covered  by  the  provisions  of  Clauses  3.2.2(a),  3.2.2(b)  and 
3.2.2(c) above shall be cleared to BC level at a minimum before they take up 
duty on IDENT1. 
3.3 
Asset Classification 
3.3.1  Material passed to the Contractor by the Authority will bear the Protective Marking 
appropriate to it. 
3.3.2  All  Assets  provided  by  the  Contractor  in  relation  to  the  delivery  of  the  IDENT1 
Service shall be classified and Protectively Marked as follows: 
(a) 
Assets  which  do  not  contain  sensitive  information,  or  which  contain 
information  which  is  already  authorised  to  be  in  the  public  domain,  should 
not  be  protectively  marked.  Optionally,  for  clarity,  such  assets  may  be 
marked NOT PROTECTIVELY MARKED. 
(b) 
Assets  which  contain  information  which  the  Authority  considers  to  be 
RESTRICTED,  or  which  contain  your  proprietary  technical  or  commercial 
information which you do not wish to be disclosed into the public domain, or 
the  disclosure  of  which  to  unauthorised  third  parties  would  prejudice  your 
tender or your competitive position, should be marked RESTRICTED. 
(c) 
Assets  which  are  protectively  marked  may  additionally  contain  a  descriptor 
where  this  helps  to  identify  to  others  the  nature  of  the  sensitivity  and  the 
groups,  roles  or  people  to  whom  access  to  the  information  should  be 
confined. 
Schedule K (Security) 

Signature Version 
 
Released under FOI in full on 15th July 2008 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 15th July 2008 
3.3.3  As  an  example,  documents  in  relating  to  technical  solutions,  or  pricing,  should  be 
protectively 
marked 
RESTRICTED, 
RESTRICTED 
– 
COMMERCIAL, 
RESTRICTED  –  CONTRACTS  or  RESTRICTED  –  IDENT1;  whereas  copies  of 
public  domain  company  financial  statements  or  product  brochures  should  not  be 
protectively marked. 
3.3.4  Should  the  Authority  need  to  apply  a  protective  marking  of  CONFIDENTIAL  or 
above  to  any  Assets,  the  Authority  will  inform  the  Contractor  of  appropriate 
instructions for managing  such Assets.  In the absence of such specific instructions, 
the aspects described in this Schedule shall apply by default. 
3.3.5  The  legacy  protective  marking  of  COMMERCIAL-IN-CONFIDENCE  is  equivalent 
to RESTRICTED – COMMERCIAL. 
3.3.6  Documents  which  do  not  attract  a  protective  marking  should  not  be  protectively 
marked, as this would impose unnecessarily onerous overheads upon all Parties; nor 
should  documents  be  unnecessarily  ‘over  classified’  as  this  dilutes  the  value  of  the 
protective marking scheme. 
3.3.7  Further  information  on  protective  marking  is  set  out  in  the  enclosed  leaflet  entitled 
“Handling of Protectively Marked Material – A Guide for Police Personnel (October 
2001)”. 
3.4 
Transmission within Company Premises 
Protectively Marked Assets shall be transmitted within the Contractor’s premises only in such 
a way as to ensure that no unauthorised person has access. 
3.5 
Use of Automated Processing Systems 
The  use  of  automated  processing  systems  for  the  management  of  Protectively  Marked 
IDENT1  and  associated  Assets  shall  be  subject  to  approval  and  accreditation  as  part  of  the 
IDENT1  accreditation  process  as  detailed in  Clause  4  below  by  the  National  Accreditor  for 
Police  systems.    Additionally  physical  site  visits  may  be  made  as  part  of  the  Accreditation 
process  by  the  Accreditor  or  authorised  agents  approved  by  the  Authority.  Where  the 
Contractor  provides  the  necessary  assurance  that  the  ‘Need  To  Know’  principle  is  being 
enforced,  that  any  risk  of  compromise  of  Assets  is  being  mitigated,  then  approval  and/or 
accreditation will not be unreasonably withheld. 
3.6 
Use of Mobile or Home Working Computers 
The  Contractor  shall  use  mobile  or  home  working  automated  processing  systems  only  as 
approved  and  accredited  according  to  Clause  4  below.    Any  Contractor’s  mobile  or  home 
working computer used to process or store such information should not be transported outside 
of the UK without prior written approval of the Authority. 
3.7 
Transmission Outside Contractor’s Premises 
3.7.1  In  addition  to  the  use  of  CAPS  approved  cryptographic  products,  the  Authority 
approves the use of the PGP V8.0 or later commercial cryptographic product for the 
protection  of  RESTRICTED  Assets  whilst  in  transit  (including  over  the  public 
internet) and in storage electronically. 
Schedule K (Security) 

Signature Version 
 
Released under FOI in full on 15th July 2008 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 15th July 2008 
3.7.2  The Contractor shall not transmit Protectively Marked information via IT networks or 
via  the  public  internet  in  any  other  way  without  the  prior  written  approval  of  the 
Authority. 
3.8 
Transmission Abroad 
Subject to the provisions of the Data Protection Act 1998, the Authority authorises shipment 
of  RESTRICTED  assets  outside  the  UK  by  first  class  mail,  by  overnight  commercial 
delivery  services  or  hand-carried  (with  courier  certificate),  where  the  material  is  double 
wrapped,  with  the  protective  marking  shown  on  the  inner  wrapper  but  not  however  on  the 
outer wrapper. 
3.9 
Loss 
Any loss or compromise of Protectively Marked Assets by the Contractor, its subcontractors 
or agents shall be reported by the Contractor to the Authority without delay. 
3.10 
Destruction 
As  soon  as  they  are  no  longer  required,  the  Contractor  shall  return  protectively  marked 
operational  Assets  and  document  originals  and  master  copies  to  the  Authority.  Protectively 
Marked non-operational Assets shall be destroyed by the Contractor in such a way as to make 
reconstitution  very  difficult  or  impossible,  for  example,  by  burning,  shredding,  tearing  into 
small  pieces  or  degaussing.    Protectively  Marked  non-operational  Assets  which  are  not 
required by the Contractor but which cannot be destroyed in such a way shall be returned by 
the Contractor to the Authority. 
3.11 
Operational Assets 
The  Contractor  shall  treated  all  operational  IDENT1  data,  information  and  other  Assets, 
including legacy NAFIS, SAFR and Police Service data, information and other Assets that do 
not possess an explicit Protective Marking, as RESTRICTED. 

ACCREDITATION 
4.1 
The  Contractor  shall  submit  the  IDENT1  Service  and  all  supporting  Contractor  and 
subcontractor facilities to formal accreditation by the National Accreditor for Police Systems 
and  obtain  formal  accreditation  prior  to  TOR.    Where  appropriate,  the  Authority  will  take 
advice on this matter from CESG and the Security Service.  Thereafter, the IDENT1 Service 
and  all  supporting  Contractor  and  subcontractor  facilities  shall  be  submitted  for  and  obtain 
accreditation  at  least  once  every  two  years  or  at  such  time  as  the  Accreditor  deems 
appropriate.     
4.2 
The  Contractor  shall  conduct  a  formal  Security  Risk  Assessment  using  a  recognised  risk 
assessment methodology such as CRAMM. 
4.3 
The  Accreditation  process  shall  be  against  extant  HMG  Information  Assurance  Policy, 
including, but not limited to, HMG IS 1-5.   
4.4 
The  Accreditation  process shall  include  an assessment  against  the  ISO17799  standard.   The 
Contractor  shall  undertake  an  analysis  of  its  own  premises,  staff,  sub-contractors  and 
technical aspects as deemed appropriate by the Accreditor. 
Schedule K (Security) 

Signature Version 
 
Released under FOI in full on 15th July 2008 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 15th July 2008 
4.5 
The  Contractor  shall  supply  all  documents  relevant  to  Accreditation  and  shall  work  closely 
with the Accreditor to achieve Accreditation.  For the avoidance of doubt, the Accreditor will 
decide if a document shall be relevant to the Accreditation process. 
4.6 
The  Contractor  shall  provide  a  single  point  of  contact  to  which  all  security  aspects  will  be 
referred in the first instance. 
4.7 
The  Contractor  shall  submit  the  system  to  an  independent  IT  Health  Check  prior  to  formal 
Accreditation; this shall be undertaken by a CESG CHECK approved consultant.  The scope 
of the Health Check shall be determined by the Accreditor.  For the avoidance of doubt, the 
requirement  hereunder  for  a  Health  Check  shall  not  replace  the  requirement  as  set  out  in 
Section  13.3  of  the  Non-Functional  Requirements  of  Schedule  D  (Detailed  Operational 
Requirements).   
4.8 
The  Contractor  shall  provide  to  the  Authority  an  Accreditation  Document  Set,  the  broad 
format of which should be taken from HMG IS2 and accompanying documents (as set forth in 
documents 49 to 56 of Schedule O (Documentation).     

GUIDANCE ON PERSONNEL VETTING 
5.1 
The  aim  of  personnel  security  vetting  is to identify  those  persons  who  may  pose  a threat to 
security and thereby, to exclude them from access to valuable Government assets, particularly 
sensitive or protectively marked material and sensitive sites. 
5.2 
Personnel vetting requirements for IDENT1 can be roughly divided in two areas. One, where 
access  to  Protectively  Marked  material  is  required  and  two,  in  areas  where  Protectively 
Marked assets could be of use to criminals. 
5.3 
The  vetting  system  in  use  by  Government  departments  is  detailed  in  HMG  Manual  of 
Protective Security (MoPS). The defined vetting levels are as follows: 
5.4 
Security Check (SC) 
5.4.1  is  carried  out  when  regular  access  to  SECRET  or  occasional  access  to  TOP 
SECRET is involved; 
5.4.2  involves a check of departmental records, where they exist, completion of a security 
questionnaire,  a  criminal  record  check,  a  credit  check  and  a  check  against  security 
records; 
5.4.3  a subject interview may be carried out in a small proportion of cases; 
5.4.4  is reviewed every ten (10) years; and 
5.4.5  is reviewed after three (3) years for contractors. 
5.5 
Developed Vetting (DV) 
5.5.1  is  carried  out  only  when  long-term,  frequent  and  uncontrolled  access  to  TOP 
SECRET information or to equivalent operations is involved; 
5.5.2  involves  all  the  process  carried  out  for  the  Security  Check,  if  these  have  not  been 
carried  out  already,  has  a  subject  interview  and  a  field  investigation,  which  will 
involve interviews with referees and current and previous supervisors; and 
Schedule K (Security) 

Signature Version 
 
Released under FOI in full on 15th July 2008 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 15th July 2008 
5.5.3  is  reviewed  at  varying  intervals,  usually  five  (5)  years  initially  and  thereafter  every 
seven (7) years.  Reviews can he brought forward at any time at the discretion of the 
DSO  (Departmental  Security  Officer).  In  the  case  of  people  under  twenty-one  (21), 
reviews may be annual. 
5.6 
Counter Terrorist Check (CTC): 
5.6.1  is carried out where a building or site is considered to be at serious risk of terrorist 
attack  and  also  where  information,  possibly  not  protectively  marked,  is  held  which 
may be of use to terrorists; and 
5.6.2  involves the completion of a security questionnaire, a check of criminal and counter 
terrorist records and very occasionally a subject interview. 
5.7 
Basic Check (BC): 
5.7.1  is  the  minimum  requirement  for  access  to  RESTRICTED  and  CONFIDENTIAL 
material and for occasional access to SECRET, although in some agreed cases there 
will be additional requirements; 
5.7.2  is not a security check as such but is a package of pre-employment checks designed to 
provide a level of assurance of probable reliability; and 
5.7.3  involves  a  check  of  original  personal  documentation,  such  as  passports,  driving 
licences etc. and the taking up of several references. 
The  National  Accreditor  may,  at  his  discretion,  authorise  the  Contractor  perform  checks  of 
Contractor staff equivalent to the Basic Check on behalf of the Authority. 
5.8 
Basic Check Enhanced (BC(E)): 
5.8.1  is a Home Office enhanced check approved by Cabinet Office; 
5.8.2  involves all the processes carried out for the Basic Check; and 
5.8.3  involves a criminal record check. 
Schedule K (Security) 

Signature Version 
 
Released under FOI in full on 15th July 2008 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 15th July 2008 
ANNEX K-1 
 
GLOSSARY OF DEFINITIONS 
The defined terms below shall only apply to this Schedule. 
 
Asset:  any  thing  of  value, either tangible  or  intangible,  that  is  owned  or  used  by  an  organisation or 
business,  including  documents  and  information,  materials  or  equipment,  cash,  operating  systems, 
employee knowledge and skills, etc. 
Availability: the continuous or timely access to information, systems or physical assets by authorised 
individuals. 
Compromise:  an  accidental  or  deliberate  violation  of  asset  CONFIDENTIALITY  or  loss  of 
INTEGRITY  or  AVAILABILITY  due  to,  for  example,  unauthorised  disclosure,  loss,  theft, 
destruction, tampering and deliberate or accidental damage. 
Confidentiality: the restriction of information and other valuable assets to authorised individuals. 
Integrity: the  maintenance  of  information  systems  and  physical  assets  in their  complete  and  usable 
form. 
Protective Marking System: a method of assigning asset values to things to indicate an appropriate 
level of security or protection required. Assets may be marked physically, for example, within headers 
and  footers  on  printed  documents,  or  for  risk  management  purposes,  may  be  treated  as  if  they  are 
marked. 
Protective  Markings:  RESTRICTED,  CONFIDENTIAL,  SECRET  and  TOP  SECRET  are 
standard  terms  used to  convey  the  value  levels  of sensitive  assets  and the  commensurate  amount  of 
protection required for them. 
Risk:  the  combination  of  threat  and  vulnerability.  The  probability  or  likelihood  of  an  attack 
succeeding or of damage being sustained as a result of compromise to an asset. An acceptable risk is 
simply the level of risk that the manager is prepared to accept. 
Risk  Analysis:  the  process  of  determining  the  likelihood  of  an  asset  being  compromised  by 
considering the vulnerabilities of the asset against the known threats to that asset. 
Risk Management: the management process designed to reduce the risk of a successful attack to an 
acceptable  level,  and  to  limit  damage  resulting  from  the  compromise  of  an  asset  or  assets.  This  is 
achievable in several ways, for example, by acceptance of the risk; transference of part of the risk by 
providing insurance or by moving the assets to another site; by implementing protective security. The 
process  necessarily  involves  a  comprehensive  analysis  and  assessment  of  the  risks  as  a  preliminary 
step. Risk management is a dynamic process that needs to be kept under regular review. 
Security Control: a method, device or activity designed to provide a degree of protection. 
Threat: the probability or likelihood of an attack or a potentially compromising event taking place.  
Where a threat is from a human source, it is influenced by such factors as the capability, resources and 
intentions of those involved, and the value or attractiveness and accessibility of the asset. 
Vulnerability:  a  feature  or  characteristic  of  an  asset  which  could  be  exploited  in  an  attack,  for 
example,  a  VDU  which  emits  radiation,  windows  which  could  shatter  scattering  lethal  splinters  of 
glass in an explosion, something which makes an asset particularly susceptible to compromise in the 
event of a disaster, such as, sub-ground areas liable to flooding. 
Schedule K (Security) 

Signature Version 
 
Released under FOI in full on 15th July 2008