SCHEDULE O 
DOCUMENTATION REQUIREMENTS
Schedule O (Documentation Requirements) 
 
Version 1.0 
FINAL 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
CONTENTS 
 
 
1. 
INTRODUCTION....................................................................................................................1 
2. 
SCOPE OF DOCUMENTATION ..........................................................................................1 
3. 
FORM AND CONTENT .........................................................................................................1 
4. 
GENERAL ................................................................................................................................2 
ANNEX O-1  DOCUMENT DESCRIPTION SUMMARY...............................................................1 
 
 
Schedule O (Documentation Requirements) 

Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
SCHEDULE O 
 
DOCUMENTATION REQUIREMENTS 
1. 
INTRODUCTION  
This  Schedule  specifies  the  contractual,  technical  and  operational  documentation  which  the 
Contractor will provide to the Authority so that the Authority has sufficient information as it 
needs to manage the Contract, ensure efficient and cost effective implementation and use of 
the Services and any contract management tasks and issues that arise. 
2. 
SCOPE OF DOCUMENTATION 
2.1 
Reference  to  “Documentation”  or  “Document”  shall  mean  all  documents  that  the 
Contractor is required to provide under this Contract in whatever media is specified or that is 
otherwise  deemed  appropriate  by  the  Authority,  and  it  includes  the  documents,  information 
and reports described in this Schedule.  
2.2 
Documentation  shall  include  detailed  system  documentation,  including  user  manuals, 
technical  manuals,  operations  procedures,  relevant  available  information  about  proprietary 
products, tools and methods, information about current project work.  
2.3 
Unless  agreed  otherwise  by  the  Parties,  copies  of  all  Documentation  provided  by  the 
Contractor  directly  to  Police  Forces  shall  simultaneously  be  provided  to  the  Authority  for 
information and retention at the address detailed in the Contract.  This Documentation shall 
include but not be limited to any Orders placed under the Contract as detailed in Schedule R 
(Livescan and EIUs).  
3. 
FORM AND CONTENT 
3.1 
To the extent not already specified in this Schedule or in any other Schedule of the Contract, 
the  Contractor  shall  work  with  the  Authority  to  agree  the  form  and  content  of  the 
Documentation  to  be  provided  by  the  Contractor  and  such  form  and  content  shall  be 
incorporated into Annex O-1 as soon as it is agreed by the Parties.  
3.2 
Unless  otherwise  stated  the  Contractor  shall  make  available  to  the  Authority  all 
Documentation  electronically  via  a  web-portal  based  solution  as  detailed  in  Schedule  Q 
(Contractor’s Solution) to facilitate the efficient and timely sharing of Documentation in a 
secure fashion between the Contractor and the Authority. The Contractor shall be responsible 
for the configuration management of the documentation provided through the web-portal. 
3.3 
If the Contractor indicates that Documentation is to be compliant with recognised methods or 
processes  (e.g.  PRINCE2,  RUP,  ITIL,  etc)  or  Documentation  arises  from  such  recognised 
methods  or  processes,  the  Contractor  shall  comply  with  the  appropriate  composition  and 
quality criteria specified by those methods or processes, unless otherwise agreed in advance 
with the Authority in writing.  
1.1 
The  Contractor  shall  provide  a  Product  Description  (as  described  in  PRINCE2)  for  each 
document item identified in this Schedule. These Product Descriptions shall be maintained by 
the  Contractor  and  made  available  to  the  Authority  through  the  web  portal  as  described  in 
Clause 3.2 above. 
Schedule O (Documentation Requirements) 

Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
4. 
GENERAL 
1.2 
The  Contractor  shall  make  all  versions  of  the  Documentation  and  other  relevant  current 
information  relating  to  the  Service,  including  technical  and  systems  architectures,  design, 
operation,  maintenance  and  testing  available  to  the  Authority  upon  request  under  the  web 
portal as described in Clause 3.2 above. 
4.1 
The Contractor shall maintain a revision control process in the production of Documentation 
such that the Authority is in possession of, as far as is appropriate, consistent and up-to-date 
Documentation  relating  to  the  relevant  elements  of  the  provision  of  the  Services.    The 
Contractor  and  the  Authority  may  agree  any  additional  Documentation  requirements  of  the 
Authority  and/or  the  Police  Forces  subject  to  the  Change  Control  Procedure  as  set  out  in 
Schedule L (Change Control Procedure). 
4.2 
The  Contractor  shall  supply  the  Documentation  detailed  in  Annex  O-1  at  the  Milestones  or 
frequency defined, in a form suitable for the Authority to agree or review, where indicated, or 
for  information  only,  allowing  sufficient  time  for  the  Authority  to  carry  out  the  indicated 
verification method specified in this Schedule. 
Schedule O (Documentation Requirements) 

Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
ANNEX O-1 
 
DOCUMENT DESCRIPTION SUMMARY 
Cross –Reference to 
Schedule Q or other 
Document Set and ID 
Document Name 
Schedules (where 
relevant) 
Testing 
 
 
1.   
Test Plan(s) 
Q7 
2.   
Test Procedure Specification 
Q7 
3a. 
Test Readiness Review Report 
Q7 
3.   
Test Readiness Review Minutes 
Q7 
4.   
Test Summary Report 
Q7 
5.   
Completion  Review Minutes 
Q1.3 
6.   
Acceptance Event Report 
H3.6 
7.   
IAR Closure Minutes 
H3.6 
8.   
Installation Checklist 
H3.5 
Programme Management 
 
 
9.   
Programme Initiation Review Documentation 
Q1.5 
10.  
Programme Quality Plan 
Q1.6 and Q7 
11.  
Integrated Master Schedule (IMS) 
Q1.3 Q1.5 and G Annex 2 
12.  
Programme Status Review Report (PSR) 
Q1.1 and Q1.3 
Project Management 
 
 
13.   
Project Approach 
 
14.   
Risk Management Plan 
Q1.3 
15.  
Communication Plan 
Q1.4 
16.  
Exception Report(s) 
Q1.3 
17.  
Project Board Briefing Reports  
Q1.3 
18.  
Stage Plan 
Q1.3 and Q1.5 and Q1.8 
and Q7.1 
19.  
Memoranda of Understanding (MOU) 
Q3.1 
20.  
Engineering Reports 
Q1.2 
21.  
Configuration Management Baseline, 
Q1.2 and Q6.1 
including the list of Assets 
22.  
Product Breakdown Structure 
Q1.3 
Training  
 
 
23.  
Training Plan 
Q5.2 and Q5.2.5 
24.  
User Manuals 
Q5.2.4 and Q5.2.5 
25.  
Training Manuals 
Q5.2.5 
26.  
Training Materials 
Q5.2.5 
27.  
Training Accreditation Scheme 
Q5.1 
28.  
CBT Design and Development Documentation  Q5.2.3 
29.  
Training Needs Analysis Report 
Q5.2 
30.  
Security Awareness Training Programme 
Q9 
Transition 
 
 
31.  
Transition Plan(s) 
Q2.1, Schedule G 
Development  
 
 
32.  
Software Development Plan(s) 
Q6.1 
33.  
Requirements Management Plan 
Q1.1 
34.  
Configuration Management Plan 
Q1.7 and Q5.1 and Q7 
35.  
Glossary 

Schedule O (Documentation Requirements) 

Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –Reference to 
Schedule Q or other 
Document Set and ID 
Document Name 
Schedules (where 
relevant) 
36.  
Business Process Models 
Q6.1 
37.  
Use Case Model 
Q6.1 
38.  
Use Case Model Survey 
Q6.1 
39.  
Supplementary Requirement Specification 
Q1.3 and Q1.7 
40.  
Requirements Traceability 
Q1.3 and Q1.7 
41.  
COTS Product Evaluations 
Q6.1 
42.  
COTS Products Register 
Q6.1 
43.  
Systems Architecture Model 
Q6.1 
44.  
Conceptual and Logical Data Models 
Q6.1 
45.  
Physical  Data Models 
Q6.1 
46.  
External ICD(s) 
Q6.1 
47.  
Livescan Interface Specification 
 
48.  
Usability Analysis 
Q6.2 
Security 
 
 
49.  
Part 1 Basic Information 
K4 
50.  
Part 2 Risk Assessment and Management 
K4 
51.  
Part 3 Security Operating Procedures 
K4 
52.  
ISO17799 Statement of Applicability 
K4 
53.  
3rd Party IT Health Check Report 
K4 
54.  
Semi-annual Health Check Report 
K4 
55.  
Security Risk Assessment 
K4 
56.  
Security Management Plan 
K4 
57.  
Impact Analysis 
Q9 
Service Management 
 
 
58.  
Operations and Maintenance Support Plan 
Q2.2.2 
59.  
Incident & Problem Analysis & Review 
Q2.2 
60.  
Service Level Report (SLR) 
Schedule F 
61.  
BS 15000 Audit Report 
Q2.2 
62.  
Interface SLAs 
Q2.2.1 
63.   
Availability Plan 
Q2.1.1 
64.  
Capacity Plan 
Q8 
65.  
Business Continuity Plan 
Q2.1.2 
66.  
Business Continuity Test Report 
Q2.1.2 
67.  
Performance Risk Assessment 
Q2.2.4 
68.   
Performance Models 
Q2.2.4 
69.   
Performance Modelling Report(s) 
Q2.2.4 
70.  
HCI Style Guide 
Q6.2 
Schedule O (Documentation Requirements) 

Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
ANNEX O-1 
 
DOCUMENT DESCRIPTION  
 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
Testing 
 
 
 
 
1.   
Test Plan(s) 
Details the scope, approach, 
Draft version (for 
 
resources and schedules of the 
Authority review) 
no later than 45 
testing activities for specific 
calendar days 
phases/iteration within the life 
of the IDENT1 Service. 
prior to SAR4 
(Product 
Identifies the items being tested, 
Verification 
the features to be tested, the 
Review, as 
testing tasks to be performed, 
described in 
personnel responsible for each 
Schedule H 
task and the risks associated 
(Acceptance 
with the Test Plan.   
Procedures)) 
where the Test 
Within each Test Plan for 
Plan applies to 
formal Acceptance Events, a 
formal Acceptance 
cross-reference matrix shall be 
Events, unless 
included that links each 
otherwise agreed 
requirement to a particular 
in writing by the 
individual test step or steps, and 
Authority. 
each test to one or more 
 
requirement. 
The Authority 
shall submit 
Formatted in accordance with 
consolidated 
the IEEE Standard for Software 
comments to the 
Test Documentation (IEEE std 
Contractor on the 
829-1998) and includes all 
draft version 
relevant sections of the RUP 
within 30 calendar 
Iteration Test Plan Artefact. 
days of receipt of 
the draft version, 
unless otherwise 
agreed in writing 
by the Authority. 
 
Final version 
(incorporating 
Authority 
consolidated 
review comments) 
within 15 calendar 
days of the 
Contractor’s 
receipt of the 
Authority’s 
Schedule O (Documentation Requirements) 

Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
returned draft 
version, unless 
otherwise agreed 
in writing by the 
Authority. 
 
Note:  Test Plans 
produced by the 
Contractor for test 
phases prior to 
acceptance testing 
shall be made 
available to the 
Authority at 
mutually agreed 
time periods for 
review or 
information 
purposes. 
2.   
Test Procedure 
Defines the steps for executing a  Draft version (for 
Q7 
Specification 
set of test cases or, more 
Authority review) 
generally, the steps used to 
no later than 35 
analyse a test item in order to 
calendar days 
evaluate a set of features.    
prior to SAR4 
 
(Product 
Will include: 
Verification 
 
Review, as 
Test Design Specification; and 
described in 
Test Case Specification. 
Schedule H 
 
(Acceptance 
Formatted in accordance with 
Procedures)) 
the IEEE Standard for Software 
where the Test 
Test Documentation (IEEE std 
Procedure 
829-1998) and includes all 
Specification 
relevant sections of the RUP 
applies to formal 
Test Script Artefact. 
Acceptance 
 
Events, unless 
otherwise agreed 
in writing by the 
Authority. 
 
The Authority 
shall submit 
consolidated 
comments to the 
Contractor on the 
draft version 
within 15 calendar 
Schedule O (Documentation Requirements) 

Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
days of receipt of 
the draft version, 
unless otherwise 
agreed in writing 
by the Authority. 
 
Final version 
(incorporating 
Authority 
consolidated 
review comments) 
within 15 calendar 
days of the 
Contractor’s 
receipt of the 
Authority’s 
returned draft 
version, unless 
otherwise agreed 
in writing by the 
Authority. 
 
Note:  Test 
Procedure 
Specifications 
produced by the 
Contractor for test 
phases prior to 
acceptance testing 
shall be made 
available to the 
Authority at 
mutually agreed 
time periods for 
review or 
information 
purposes. 
3a. 
Test Readiness 
The Test Readiness Review 
No later than 7 
Q7 
Review Report 
Report shall detail the 
working days prior 
Contractors readiness for 
to the 
proceeding to an associated 
commencement of 
Acceptance Event.   
the Readiness 
 
Review meeting 
The report shall summarise the 
for the execution 
results of testing activities prior 
of an associated 
to acceptance testing, provides a 
Acceptance Event, 
list of outstanding problems, 
unless otherwise 
roles and responsibilities and a 
agreed in writing 
Schedule O (Documentation Requirements) 

Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
schedule of the Acceptance 
by the Authority. 
Event.   
 
 
3.   
Test Readiness 
A written record of what 
As required by the 
Q7 
Review 
transpired at an associated 
Authority after the 
Minutes 
Readiness Review 
Readiness Review meeting 
between the Authority and the 
meeting.    
Contractor. 
4.   
Test Summary 
Summarises the results of the 
No later than 10 
Q7 
Report 
calendar days 
designated testing activities and 
prior to the 
provides evaluations based on 
these results. 
Completion 
Review meeting 
Within each Test Summary 
marking the 
Report, a record of requirement 
completion of the 
verification, including 
associated 
traceability to each contracted 
Acceptance Event, 
deliverable requirement shall be 
unless otherwise 
included. As will the Test 
agreed in writing 
Incident Report and the Test 
by the Authority. 
Log. 
 
Formatted in accordance with 
Note:  Test 
the IEEE Standard for Software 
Summary Reports 
Test Documentation (IEEE std 
produced by the 
829-1998) and includes all 
Contractor for test 
relevant sections of the RUP 
phases prior to 
Test Evaluation Summary 
acceptance testing 
Artefact.    
shall be made 
available to the 
Authority at 
mutually agreed 
time periods for 
review or 
information 
purposes. 
1.   
Completion  
A written record of what 
As required by the 
Q1.3 
Review 
Authority after the 
transpired at an associated 
Minutes 
Completion Review meeting 
Completion 
between the Authority and the 
Review meeting. 
Contractor. 
For Minutes, the 
Contractor shall 
A written record of what 
deliver the 
transpired at an event meeting 
Minutes to the 
between the Authority and 
Authority 5 
Contractor (Minutes). 
working days after 
the event and the 
Schedule O (Documentation Requirements) 

Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
Authority shall 
submit 
consolidated 
comments / 
approval to the 
Contractor with 5 
working days of 
receipt of the 
Minutes from the 
Contractor, unless 
otherwise agreed 
in writing by the 
Authority.    
6.   
Acceptance 
The Acceptance Event Report 
Draft version (for 
H3.6 
Event Report 
shall provide comprehensive 
Authority review) 
within 30 calendar 
details of the outcome of an 
Acceptance Event and at a 
days of the 
minimum shall include details 
Completion 
of: 
Review meeting 
marking the 
completion of the 
•  Names and roles of 
associated 
participants and attendees. 
Acceptance Event, 
unless otherwise 
•  The status of the Acceptance  agreed in writing 
Event environment. 
by the Authority. 
 
•  The achievement of the 
  
criteria for Acceptance 
The Authority 
Event readiness. 
shall submit 
consolidated 
•  The Acceptance Event 
comments to the 
conduct. 
Contractor on the 
draft version 
•  The outcome of Regression 
within 30 calendar 
Testing. 
days of receipt of 
the draft version, 
•  The achievement of the 
unless otherwise 
criteria for successful 
agreed in writing 
Acceptance Event 
by the Authority. 
completion. 
 
Final version 
•  Any deviations from the 
(incorporating 
criteria for successful 
Authority 
Acceptance Event 
consolidated 
completion. 
review comments) 
within 30 calendar 
•  Any Defects and 
days of the 
Schedule O (Documentation Requirements) 

Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
deficiencies in the services 
Contractor’s 
or capabilities undergoing 
receipt of the 
acceptance, and an 
Authority’s 
associated resolution plan. 
returned draft 
version, unless 
•  The requirements verified 
otherwise agreed 
and/or validated by the 
in writing by the 
Acceptance Event. 
Authority. 
 
7.   
IAR Closure 
A written record of what 
As required by the 
H3.6.4 
Minutes 
Authority after the 
transpired at an associated IAR 
Closure meeting between the 
IAR Closure 
Authority and the Contractor. 
meeting.    
They will include the IAR 
Closure Report, a draft of which 
will be provided to the 
Authority 5 days before the 
Review. 
8.   
Installation 
A record that details all 
No less than 7 
H3.5 
Checklist 
calendar days 
necessary equipment has been 
provided, installed, configured 
prior to the 
and can be shown to be working 
commencement of 
the associated 
in the operational environment 
(bureaux) as part of Installation 
SAR6 
Checkout Acceptance Events (as  (Operational 
described in Schedule H 
Acceptance 
(Acceptance Procedures)) 
Review), unless 
otherwise agreed 
in writing by the 
Authority. 
 
Programme 
 
 
 
 
Management 
9.   
Programme 
Describes the programme and 
17th January 2005  
Q1.5 
Initiation 
project management methods 
 
Review 
and tools to be used throughout 
 
Documentation 
the Services.  
 
Describes the Contractor’s 
programme and project 
management structure 
(including roles and 
Schedule O (Documentation Requirements) 

Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
responsibilities).  
 
 
 
Validated Requirements 
Baseline 
 
Describes how the Contractor 
and the Authority will interact at 
management level.  
 
Defines the IDENT1 
Programme Lifecycle.  
 
The agenda items to be 
discussed and briefed at the 
Programme Initiation Review 
meeting.  Such agenda items 
shall include but shall not be 
limited to the following: 
 
• 
Transition Strategy 
• 
Development Strategy 
• 
Test and Acceptance 
Strategy 
• 
Capacity Management and 
Performance Assurance 
Strategy 
• 
Requirements Management 
Strategy 
• 
Communications Strategy 
 
For the avoidance of doubt, the 
above bullet items are not 
separate deliverable documents.   
 
Training Approach 
 
High Level Business Process 
Model 
 
Plans for data exchange 
Business process approach 
 
Management Approach. 
 
System Architecture Model. 
Schedule O (Documentation Requirements) 

Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
 
Service Management Strategy. 
 
Operations and Maintenance 
Support Plan. 
10.  
Programme  
Describes at a minimum: 
45 calendar days 
Q1.6 
Quality Plan 
•  QA Roles and 
after Effective 
And 
Responsibilities 
Date.   
Q7 
•  Quality Criteria 
 
•  Applicable Standards 
Updated whenever 
•  QC Procedures 
significant 
•  Quality Review Procedures 
changes occur 
with Authority 
•  Schedule of QA activities 
and Corresponding Quality 
approval. 
Log 
•  Subcontractor QA 
Requirements 
 
11.  
Integrated 
Detailed schedule of milestones 
Programme 
Q1.3 
Master 
and activities in MS Project 
Initiation then 
Q1.5 and G4.3 
Schedule (IMS)  Format. 
monthly or 
Annex 2 
 
whenever 
The IMS shall include the 
significant 
critical path for IDENT1. 
changes occur 
with Authority 
approval. 
12.  
Programme 
Details the overall programme 
Monthly, 
Q1.1 
Status Review 
status for use at PSR meetings.  
delivered at PSR 
and 
Report (PSR) 
This shall include as a 
meetings 
Q1.3 
minimum: 
•  Progress against the 
IMS 
•  Changes to the IMS 
•  Delivery of products 
defined in the Product 
Log 
•  Tolerance conditions 
•  Outputs from the Risk 
Management Board 
•  Risk Log 
•  Issues Log 
•  Change Log 
•  Summary of outcome of 
any Project Review 
Authority (PRA) review 
Schedule O (Documentation Requirements) 
10 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
Project 
 
 
 
 
Management 
13.  
Project 
Defines the type of solution for 
10 calendar days 
 
 
Approach 
the products that a project 
prior to the 
 
delivers, reason for chosen 
commencement of 
approach and method for 
any project not 
delivery.  
identified  in 
 
Schedule G 
It shall identify project issues 
(Transition). 
and risks. 
 
This document shall be 
formatted in accordance with the 
PRINCE2 Project Brief format. 
 
 
14.  
Risk 
This will document the risk 
45 calendar days 
Q1.3 
 
Management 
management processes activity 
after Effective 
 
Plan 
that the Contractor will be 
Date.   
conducting. 
 
As a minimum this will include: 
•  Risk identification 
•  Risk evaluation  
•  Risk ownership 
•  Risk profiling 
•  Risk reporting 
•  Risk mitigation 
15.  
Communication  Describes how the Contractor 
TOR NAFIS.   
Q1.4 
Plan 
will manage communications 
 
relating to IDENT1 in 
Updated annually 
conjunction with the Authority 
as a minimum. 
on an annual basis, including but 
not limited to: 
•  User advocate activities 
•  Conference attendance 
•  Newsletter publication 
•  Status reports 
•  Web portal updates 
•  Management reviews 
•  User group activity 
•  Information days. 
•  Deployment activities 
 
Schedule O (Documentation Requirements) 
11 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
16.  
Exception 
Informs the Authority/project 
Within 7 calendar 
Q1.3 
Report(s) 
board of actual or anticipated 
days of an 
project tolerances being 
exception being 
exceeded. 
identified or as 
 
soon as it has been 
This document shall be 
anticipated. 
formatted in accordance with the 
PRINCE2 Exception Report 
format. 
 
17.  
Project Board 
Briefings for the Authority 
As requested by 
Q1.3 
 
Briefing 
project boards on ad-hoc project 
the Authority 
Reports  
and programme related issues. 
18.  
Stage Plan 
Identifies the scope of work to 
TOR NAFIS, 
Q1.3 
be performed, the schedule it is 
TOR SAFR, FOC.  And 
being performed under, the 
Q1.5 
staffing and any Authority 
And 
responsibilities during that 
Q1.8 
stage.   
And 
 
Q7.1 
This document shall be 
formatted in accordance with the 
PRINCE2 Stage Plan format. 
 
19.  
Memoranda of 
Force Installations to include 
As Required. 
Q3.1 
Understanding 
roles and responsibilities, 
(MOU) 
schedule, specific requirements 
for each Force Bureau and 
Custody Suites to include, but 
are not limited to: 
•  Hardware Configuration 
•  Facility Layout diagram 
•  Furniture Requirements 
•  Electrical Power 
requirements 
•  Heating & Cooling 
Requirements 
•  Communication 
Requirements 
•  Data 
•  Personnel 
•  Training 
•  Facility Access procedures 
and schedule 
•  Data Protection 
Requirements 
Schedule O (Documentation Requirements) 
12 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
20.  
Engineering 
Content is dependent on the 
As required 
Q1.2 
 
Reports 
topic of the report, but typically 
 
will include: 
•  Identification of issue 
analysed 
•  Technical options 
•  Estimated impacts 
•  Recommendations 
21.  
Configuration 
Q1.2 and Q6.1 
• 
Full detail of the 
• 
At FOC and 
Management 
configuration of the 
updated upon 
Baseline 
any major 
deployed IDENT1 system 
change 
• 
A list of Assets as required 
 
under Schedule T (Assets). 
• 
At TOR 
NAFIS, the 
final list of 
Legacy 
Assets to be 
provided. 
 
22.  
Product 
At Project 
Q1.3 
Description of the hierarchical 
Breakdown 
Initiation and for 
order of products to achieve key 
Structure 
milestones 
Next Stage plans 
Training  
 
 
 
 
23.  
Training Plan 
Training Plan describes the 
90 days after 
Q5.2 
overall IDENT1 training 
Effective Date and  And 
programme. This will include 
updated annually 
Q5.2.5 
the results of the initial and 
or at appropriate 
annual update of the Training 
milestones 
Needs Analysis. The Plan will 
throughout the  
detail the overall strategy and an  Term. 
overview for the subsequent 
specific training areas of 
transition, specialist training and 
training of bureaux trainers. The 
plan will detail the approach and 
activities to design and 
development of the training 
systems and CBT, including 
appropriate timescale 
information. The Plan shall 
include details of, but not be 
limited to: 
 
•  Training Customers 
•  Locations 
Schedule O (Documentation Requirements) 
13 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
•  Training Systems 
•  Training Approach 
•  Course Design 
•  Additional Support 
•  Course Timetables 
•  Local Capabilities 
•  Training Delivery reports 
•  Supporting Plans 
•  Training Staff and 
Qualifications 
 
24.  
User Manuals 
The User Manuals shall describe  10 days prior to 
Q5.2.4 and 
the use and operational 
the deployment of 
Q5.2.5 
processes of the IDENT1 
the relevant 
Services and all aspects of the 
functionality or 
system. 
service. Updated 
 
in line with the 
rollout of 
additional 
functionality or 
services.  
25.  
Training 
The Training Manuals shall 
Prior to associated 
Q5.2.5 
Manuals 
include all relevant details 
training event. 
(including, but not limited to, 
user guides and aides-memoirs) 
regarding the specific training 
event. 
26.  
Training 
Training materials associated 
Prior to relevant 
Q5.2.5 
 
Materials 
with the delivery of training 
training.  
 
courses by organisations such as 
CENTREX as described in 
Schedule D (Detailed 
Operational Requirements) or 
by Contractor lead events 
27.  
Training 
Description of proposed 
Within 6 months 
Q5.1 
Accreditation 
accreditation scheme for 
of Effective Date 
Scheme 
Trainers at Fingerprint Training 
Schools and its operation 
28.  
CBT Design 
Series of documentation 
At appropriate 
Q5.2.3 
and 
addressing the design, 
milestones 
Development 
development and deployment of 
identified in the 
Documentation 
the IDENT1 Computer Based 
Training Plan 
Training System. 
29.  
Training Needs 
This document shall provide 
90 days after 
Q5.2 
Analysis 
results of the training needs 
Effective Date and 
Report 
analysis (as agreed between the 
updated annually 
Contractor and the Authority).  
throughout the 
Schedule O (Documentation Requirements) 
14 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
IDENT1 Contract 
Term 
30.  
Security 
The Contractor’s Security 
Annually and 
Q9 
Awareness 
Awareness Training Programme 
upon new users 
Training 
shall provide annual 
being added to the 
Programme 
documented training to all users.  system. 
Transition 
 
 
 
 
31.  
Transition 
Describes in detail the roles and 
35 calendar days 
Q2.1 
 
Plan(s) 
responsibilities of the 
prior to each 
Schedule G 
Contractor, Authority, and 
Transition.  
(Transition) 
Bureaux personnel, the 
Project in 
procedures to be implemented, 
sequence as 
and the schedule for each of the 
follows: Scotland, 
Transition events.  These will 
Palms, Migration, 
include Transition Plans for 
SISP. 
transitioning from NAFIS to 
IDENT1 for England, and Wales 
and transitioning SAFR to 
IDENT 1 for Scotland.  As a 
minimum each Transition Plan 
will include: 
 
• 
Transition Strategy 
• 
Business Continuity 
• 
Data Migration (including 
BRC) 
• 
Training. 
 
The Transition Plan shall contain 
the following information, to be 
updated by the Contractor 
throughout the Transition Period 
in accordance with the 
following: 
( )  applicable activities to be 
performed by the 
Contractor relating to 
and/or, as appropriate, 
details concerning, in 
respect of each Transition 
Milestone, taking account 
of Annex G-2 of Schedule 
G (Transition);  
(i)   Transition activities 
for TOR – England 
Schedule O (Documentation Requirements) 
15 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
and Wales; 
(ii)  Transition activities 
for TOR – Scotland; 
(iii)  Transition activities 
for FOC – England 
and Wales; 
(iv)  Transition activities 
for FOC – Scotland; 
(v)  Transition of 
Livescan/EIU in (a) 
England & Wales; 
and (b) Scotland as 
separate exercises; 
(vi)  migration of SAFR 
data and information 
to IDENT1 Service; 
(vii)  back record 
conversion activities 
– for England and 
Wales, and Scotland 
(including England & 
Wales Palm data; and 
SAFR and Scottish 
Palms paper 
collection); 
(viii)  the development, 
proving and 
implementation of 
the processes, 
procedures and 
systems required to 
deliver the IDENT1 
Services, including 
education and 
support arrangements 
between the 
Contractor and 
individual Police 
Forces;  
(ix)  staff to be transferred 
Schedule O (Documentation Requirements) 
16 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
from the Incumbent 
Supplier, as 
appropriate; 
(x)  staff to be recruited 
and/or transferred 
from other parts of 
the Contractor’s 
organisation as 
appropriate; 
(xi)  premises 
requirements to 
include site surveys 
and Memoranda of 
Understanding; 
(xii)  activities to ensure 
subcontracts are in 
place by TOR for 
England and Wales 
and by TOR SAFR 
for Scotland; 
(xiii)  activities to ensure 
that Third Party 
Contracts are in place 
by TOR for England 
and Wales and by 
TOR SAFR for 
Scotland as specified 
in Schedule S 
(Software, IPR and 
Third Party 
Contracts) by TOR 
for England and 
Wales and Scotland; 
(xiv)  Transition of the 
Services as specified 
where relevant in 
Schedule G 
(Transition); 
(xv)  CWIP;  
(xvi)  resources to be 
provided by each 
Party, including 
Schedule O (Documentation Requirements) 
17 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
required from the 
Authority; and 
(xvii) how dependencies 
will be managed 
during Transition;  
( )  all Transition Criteria for 
each Transition stage, 
including as a minimum: 
(i)   Lifecycle Objectives 
Review, if applicable; 
(xviii) 
 
Lifecycl
e Architecture 
Review, if 
applicable; 
(xix)  Operational 
Readiness Review; 
(xx)  an ITED release; and 
(xxi)   
detailed stage 
project plans from 
the Integrated Master 
Schedule (IMS); 
( )  the schedule of meetings to 
report on plans and 
progress; and  
( )  any further detail or 
information as may be 
required by either Party 
from time to time to enable 
good project management 
and control and to enable 
the Contractor to 
demonstrate to the 
Authority that the 
implementation of 
Transition is on time and 
under control.  
Development    
 
 
 
32.  
Software 
The Software Development Plan  60 days after 
Q6.1 
Development 
details all aspects of the 
Effective Date. 
Schedule O (Documentation Requirements) 
18 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
Plan(s) 
IDENT1 software development 
 
process, incorporating aspects of  Updated as 
the Contractor’s standard 
necessary. 
methodologies, the RUP, 
PRINCE2 and User Centred 
Design.   
 
Details timelines and 
interdependencies of 
development tasks, addresses 
roles of Contractor, Authority 
(and users). 
 
This equates to the Software 
Development Plan as defined by 
RUP  
 
33.  
Requirements 
The Requirements Management 
60 days after 
Q1.1 
Management 
Plan will specify the information  Effective Date and 
Plan 
and control mechanisms that 
updated 
 
will be collected and used for 
throughout the life 
measuring, reporting and 
of the IDENT1 
controlling changes, to the 
Service 
requirements. 
 
This equates to the 
Requirements Management Plan 
as defined by RUP 
34.  
Configuration 
Defines the Contractors software  60 days after 
Q1.7 
 
Management 
configuration management 
Effective Date and  And 
Plan 
approach.  The document shall 
updated 
Q5.1 
detail all aspects of the software 
throughout the life  And 
configuration process, 
of the IDENT1 
Q7 
including: 
Service with 
•  Configuration Identification;  Authority 
•  Configuration Control; 
approval. 
•  Configuration Status 
Accounting; 
•  Configuration 
Authentication. 
 
35.  
Glossary in 
 
TOR NAFIS. 

Schedule D 
 
 
(Detailed 
The Authority and the 
 
Operational 
Contractor are both responsible 
Updates shall be 
Requirements)  for ensuring that the glossary is 
made throughout 
Schedule O (Documentation Requirements) 
19 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
kept up to date and that all new 
the life of the 
documentation including 
IDENT1 Service 
updates is consistent with the 
with Authority 
current version of the Glossary.  
approval. 
 
The master copy of this 
document shall be held by 
Authority and changes are made 
by agreement between the 
Authority and the Contractor. 
 
36.  
Business 
Business Process Models shall 
Key business 
Q6.1 
 
Process Models  be provided demonstrating 
process models 
current processes identifying 
provided by SAR1 
existing problems and new 
for SISP project. 
processes designed to solve 
 More detailed 
these problems. 
models provided 
 
by SAR3 for SISP 
Models shall be provided in a 
project. 
format that can be exported to a 
commercially available business 
process tool. 
37.  
Use Case 
The Use Case Model is a model 
A draft version 
Q6.1 
Model 
of the system’s intended 
will have been 
functions and it’s environment, 
provided for 
and is used as an essential input 
review in 
to analysis, design and test. 
preparation for a 
 
SAR1 and SAR2. 
The use case model will include:  Final version 
 
provided for a 
•  Use Case packages 
SAR3. 
o  Defining the 
structure of the 
model using UML 
models and textual 
specifications 
•  Use Cases 
o  Containing UML 
models and textual 
Use Case 
specifications 
•  Actors 
o  Defining a set of 
roles which interact 
with the system 
 
Schedule O (Documentation Requirements) 
20 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
UML models shall be provided 
in a format exportable to 
Rational Rose. Use Case 
specifications shall be 
exportable to DOORS. 
38.  
Use Case 
A full report on the Use Case 
Draft version due 
Q6.1 
Model Survey 
Model. This report equates to 
in preparation for 
the Use Case Model Survey as 
SAR1. 
defined by RUP. 
Baseline version 
 
due in preparation 
for SAR2. 
Updated as and 
when major 
changes occur. 
39.  
Supplementary 
The Supplementary 
A version will be 
Q1.3 and Q1.7 
 
Requirement 
Requirements Specification 
provided for 
Specification 
further defines the system 
review in 
requirements through the 
preparation for a 
iterative Use Case development 
SAR1, SAR2 and 
process. 
SAR3. 
 
The Supplementary 
Requirements Specification 
equates to the Supplementary 
Specification in RUP. 
 
The Supplementary 
Requirements shall be provided 
in a format exportable to 
DOORS 
40.  
Requirements 
Traceability shall be maintained 
Iniktial 
Q1.3 and Q1.7 
Traceability 
within the development 
traceability set up 
environment to enable reports to 
by SAR1. 
be produced as necessary.  
 
Requirements Traceability shall 
The relevant 
include: 
project portion due 
at each SAR for 
that project. 
•  traceability of system 
 
requirements to use 
The latest version 
cases and non-
of the 
functional requirements.  Requirements 
Database available 
•  traceability of test cases 
to the Authority 
to use cases 
on request. 
Schedule O (Documentation Requirements) 
21 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
41.  
COTS Product 
This document shall detail 
Prior to the 
Q6.1 
 
Evaluations 
formal justification for the 
selection of a 
selection of a COTS product and  COTS product for 
will include 
integration into the 
•  Cost of ownership 
IDENT1 solution 
•  Maintainability 
•  Obsolescence management 
concerns 
42.  
COTS Products  This document shall contain, for  As required 
Q6.1 
Register 
each COTS software product 
that is required, incorporated 
and/or included as partof the 
delivery of the Services: Name, 
Version Number, Ratings, 
Certifications, Industry 
Standards, etc. achieved and any 
modifications. 
43.  
Systems 
A comprehensive System 
Draft version due 
Q6.1 
Architecture 
Architecture Model, detailing 
at SAR 2. 
Model 
the major components of the 
 
IDENT1s system. 
Updated version 
 
due at SAR 3, and 
•  Documents views of the 
then regularly 
IDENT1 system architecture  updated in line 
satisfying various 
with significant 
viewpoints (including as a 
changes to the 
minimum:- logical, 
System 
implementation, 
Architecture. 
distribution, data, Physical, 
size and performance, and 
security viewpoints). 
•  Records any known 
inconsistency between 
views. 
•  Provides rationale for 
architectural decisions. 
 
Must be supplied in form of 
Rational Rose model, in 
addition to any textual 
descriptions. 
 
44.  
Conceptual and  This shall be a conceptual model  Initial model at 
Q6.1 
Logical Data 
and a logical model of the data 
SAR2 for SISP 
Schedule O (Documentation Requirements) 
22 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
Models 
managed in the IDENT1 system,  Project. 
demonstrating alignment with 
 
CorDM. 
Updated as 
 
required for SAR 
Also forms part of System 
2 and 3. 
Architecture Model. 
45.  
Physical Data 
This shall be a physical 
Model provided at 
Q6.1 
 
Model 
model(s) of the data managed in 
FOC.  
the IDENT1 system, 
 
Updates as 
required. 
46.  
External ICD(s)  Defines external interfaces 
Initial draft at 
Q6.1 
between the IDENT1 system 
TOR-NAFIS + 30 
and other systems,  
days for existing 
encompassing:- 
interfaces. 
•  Physical view; 
 
•  Logical or Transaction 
Draft version for 
view; 
new external 
•  Functional view; 
interfaces at 
relevant SAR 3 
•  Performance view. 
and “as built” 
version at SAR 6. 
 
This is to include Avon & 
Somerset and Kent system 
ICDs, plus any relevant legacly 
NAFIS ICDs (e.g. PNC) that 
need an IDENT1 format. 
47.  
Livescan 
Defines the interface between 
TOR-NAFIS + 30 
 
Interface 
days and then 
the Livescan sub-systems and 
Specification 
IDENT1. Specifically defines 
updated in line 
with changes to 
elements of UK version of the 
ANSI/NIST standard for 
the Livescan 
exchange of fingerprint images. 
interface. 
48.  
Usability 
Reports of usability analysis 
As Required 
Q6.2 
Analysis 
covering the method, results and 
derived usability requirements. 
 
Includes: 
Task Analysis 
User Analysis 
Environmental Analysis 
Security 
 
 
 
 
49.  
Part 1 Basic 
Following the principles of 
At TOR-NAFIS, 
K4 
Information 
HMG IS2, this should cover 
thereafter annually 
Schedule O (Documentation Requirements) 
23 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
purpose, accreditation scope, 
or after a major 
user groups. 
system change. 
50.  
Part 2 Risk 
Following the principles of 
At TOR-NAFIS, 
K4 
Assessment and  HMG IS2, this should include a 
thereafter annually 
Management 
full risk assessment using HMG 
or after a major 
IS1 and another comprehensive 
system change. 
risk assessment tool e.g. 
CRAMM. 
51.  
Part 3 Security 
Following the principles of 
At TOR-NAFIS, 
K4 
Operating 
HMG IS2, this should include 
thereafter annually 
Procedures 
SyOps for all users or groups of 
or after a major 
users of the system. 
system change. 
52.  
ISO17799 
Shows the Contractors 
At TOR-NAFIS, 
K4 
Statement of 
conformance to the standard 
thereafter annually 
Applicability 
within the confines of the 
or after a major 
system, will make up part of the 
system change. 
ADS in order to comply with the 
CJX CoCo v2. 
53.  
3rd Party IT 
Will detail the scope and 
At TOR-NAFIS, 
K4 
Health Check 
methodology used by the 
thereafter annually 
Report 
CHECK provider and the results  or after a 
of the test 
significant system 
change. 
54.  
Semi-annual 
Will detail the scope and 
Six months after 
K4 
Health Check 
methodology used by the 
TOR-NAFIS and 
Report 
CHECK provider and the results  annually thereafter 
of the test 
55.  
Security Risk 
This should be conducted using 
At TOR-NAFIS, 
K4 
Assessment 
HMG IS1 as a baseline and 
thereafter annually 
other risk analysis tools as 
or after a major 
appropriate e.g. CRAMM. 
system change. 
56.  
Security 
Detail how the Contractor is 
35 calendar days 
K4 
Management  
adhering to its Information 
after signing 
Plan 
Security Management System as  contract.   
laid down in ISO17799. 
Updated whenever 
significant 
changes occur 
with Authority 
approval. 
57.  
Impact 
Conducted by the Contractor 
As appropriate, 
Q9 
Analysis 
after a known security breach.    
but delivered to 
the Authority 
within 48 hours of 
the breach.   
Service 
 
 
 
 
Management 
58.  
Operations and 
Comprehensive plan for the 
35 calendar days 
Q2.2.2 
Schedule O (Documentation Requirements) 
24 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
Maintenance 
operations and maintenance 
prior to TOR 
Support Plan 
support of the IDENT1 
NAFIS, updated 
Service.  
as needed but as a 
The document shall include 
minimum 
details of, but not limited to: 
annually. 
•  Overview of Service 
Management and Support 
services 
•  Structure, operating 
procedures, tool 
selection/usage, location 
and continuity 
arrangements for the 
Service Desk 
•  Detailed process 
descriptions including 
procedures, guidelines, 
support tools, roles and 
responsibilities for ITIL 
Service Support 
activities: 
o  Incident 
Management 
o  Problem 
Management 
o  Configuration 
Management 
o  Operational 
Service 
Change 
Management 
o  Release 
Management 
•  Detailed process 
descriptions including 
procedures, guidelines, 
support tools, roles and 
responsibilities for ITIL 
Service Delivery 
activities: 
o  Service Level 
Management 
o  Availability 
Management 
o  Capacity 
Management 
o  Service 
Schedule O (Documentation Requirements) 
25 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
Continuity 
Management 
•  Operation of maintenance 
and service support 
structure including  
o  Location and 
operating 
procedures of 
support units 
o  Proposed 
inventories of  
spares for the 
IDENT1 
o  equipment 
o  High value or 
limited 
availability 
consumables. 
 
59.  
Incident & 
Analysis of workload of 
1 year after TOR 
Q2.2 
Problem 
Incidents, including spotting 
NAFIS, and 
Analysis & 
trends and any 
annually there 
Review 
recommendations and actions 
after or at any 
arising from analysis including 
intermediate 
the results of proactive Problem 
review 
Management process (ITIL) 
60.  
Service Level 
Service Level Report, detailing 
1 Month after 
Schedule F 
Report (SLR) 
general reporting on service 
TOR NAFIS and 
(Service Level 
levels, service levels and scoring  Monthly there 
Requirements) 
for Service Level Metrics, 
after. 
Service Categories and Overall 
Service, as described in 
Schedule F (Service Level 
Requirements) 
61.  
BS 15000 
Audit reports of the ITIL 
Within 15 days of 
Q2.2 
Audit Report 
Service Management as part of 
audit 
the ongoing BS15000 
accreditation 
62.  
Interface SLAs 
Service or Operational Level 
At appropriate 
Q2.2.1 
Agreement(s) relating to any 
development point 
system or service interface to the  and any change 
IDENT1 Service (eg PIFE, 
point for each 
PNC, PSNI, Custody) 
Interface 
63.   
Availability 
Plan detailing the outcomes of 
At TOR NAFIS 
Q2.1.1 
 
Plan 
the Availability design and 
and at least 
ongoing management. The 
annually there 
report shall include: 
after or at any 
Schedule O (Documentation Requirements) 
26 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
• 
process Availability and 
appropriate 
recovery design criteria 
development 
for each service 
points 
• 
details of the 
Availability techniques 
deployed to provide 
additional Infrastructure 
resilience to prevent or 
minimise the impact of 
component failure to the 
Service  
• 
targets of availability, 
reliability and 
maintainability for the 
IT Infrastructure 
components that 
underpin the Service(s)  
• 
Reporting and analysis 
of Availability, 
reliability and 
maintainability 
including predictive 
performance 
• 
Recommendation and 
actions to maintain or 
improve the Availability 
of the Service 
 
64.  
Capacity Plan 
1 Month prior to 
Q8 
Plan detailing the outcomes of 
Capacity Management Process. 
TOR NAFIS and 
at 6 month 
The report shall include:  
intervals there 
•  Problems being 
after 
experienced or 
envisaged due to over or 
under Capacity 
•  the degree to which 
service levels are being 
achieved or exceeded 
•  what has changed that 
has a impact on capacity 
since the last issue of 
this plan.  
•  Any known changes that 
will happen that will 
impact future capacity 
•  Summary of service 
Schedule O (Documentation Requirements) 
27 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
usage against demand 
forecasts/ Contract 
targets. 
•  Analysis of trends and 
existing predictions for 
future demand forecasts. 
•  Summary of current and 
recent Resource usage 
across the system 
•  Analysis of actual 
resource usage against 
predicted. 
•  Prediction of future 
Capacity needs 
supported by 
Performance modelling 
as appropriate. 
•  Identification of 
additional Resources 
and their deployment 
programme. 
•  Any additional 
recommendation or 
actions 
65.  
Business 
Documents the plan for 
1 month prior to 
Q2.1.2 
Continuity Plan  continuity of business 
TOR NAFIS, and 
operations for the IDENT1 
annually thereafter  
Service at local and national 
 
level, including: 
 
•  Threat analysis 
including business 
impact analysis and risk 
assessment 
•  Identification of 
significant Disaster / 
Business Continuity 
scenarios 
•  Options and counter 
measures 
•  Specific Continuity 
Procedures and recovery 
plans for identified 
Disaster/ Continuity 
Scenarios 
66.  
Business 
Report on the testing of the 
Within 15 days of 
Q2.1.2 
Continuity Test  Business Continuity Procedures 
each testing event. 
Report 
Schedule O (Documentation Requirements) 
28 
Version1.0 
FINAL 
 
18 July 2005 
 
Released under FOI in full on 13th December 2005 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
Released under FOI in full on 13th December 2005 
Cross –
Reference to 
Delivery 
Schedule Q or 
Document 
Document 
Milestone and/or 
Description of Document 
other 
Set and ID 
Name 
Frequency (all in 
Schedules 
calendar days) 
(where 
relevant) 
67.  
Performance 
As discussed in the Performance  Revised version 
Q2.2.4 
Risk 
Assurance section of Schedule 
aligned with each 
Assessment 
D (Detailed Operational 
SAR2, and any 
Requirements). 
PARs, with a 
performance 
dimension. 
68.  
Performance 
Static and dynamic simulation 
Annually and at 
Q2.2.4 
Models 
performance and sizing models. 
each project 
 
milestone. 
69.  
Performance 
Result from Performance 
At appropriate 
Q2.2.4 
Modelling 
Modelling as described in 
development point 
Report(s) 
Section 8.4 of Schedule D  
identified in 
(Detailed Operational 
Capacity 
Requirements) Non Functional 
Management and 
Performance 
Assurance 
Strategy 
70.  
HCI Style 
Details of the Design Guidelines  Working copy 
Q6.2 
Guide 
and Standards to be used for the 
available to the 
IDENT1 Services. 
Authority to 
 
support all UIEs 
Includes: 
(as set out in the 
Design principles and rules 
IMS) with final 
derived from these principles; 
version delivered 
Identification of relevant 
under IDENT1 
Standards and how they will be 
System HCI 
implemented. 
Milestone. 
 
 
 
 