This is an HTML version of an attachment to the Freedom of Information request 'IDENT1 contract'.
PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
SCHEDULE E 
PRICING 
Schedule E (Pricing) 
 
Version 1.0 
CCN003, CCN005, CCN007 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
CONTENTS 
 

INTRODUCTION .................................................................................................................................. 1 

GENERAL PRINCIPLES ..................................................................................................................... 1 

MONTHLY BASELINE CHARGES ................................................................................................... 2 

SERVICE CREDITS AND SERVICE INCENTIVE PAYMENTS / ADJUSTMENTS  AND  
CALCULATION OF THE “ACTUAL MONTHLY CHARGES”.................................................... 2 

INVOICING ......................................................................................................................................... 13 

IMPACT OF AN INCREASE OR REDUCTION IN BUREAUX NUMBERS.............................. 14 

POTENTIAL FUTURE CHANGES IN VOLUMETRICS .............................................................. 14 

OPTIONAL SERVICES...................................................................................................................... 14 

VALUE FOR MONEY ........................................................................................................................ 20 
10 
CONTRACT EXTENSION................................................................................................................. 20 
11 
INSURANCE ........................................................................................................................................ 20 
ANNEX E-1  NOT USED................................................................................................................................... 21 
ANNEX E-2  ROLE DEFINITIONS ................................................................................................................ 22 
ANNEX E-3  ADDITION OF A BUREAUX OR REMOVAL OF A BUREAUX OR POLICE FORCE .. 29 
ANNEX E-4  IMPACT OF POTENTIAL FUTURE VOLUME CHANGES ............................................... 34 
ANNEX E-5  INDICATIVE SERVICE CHARGES FOR CONTRACT EXTENSION .............................. 38 
ANNEX E-6  VALUE FOR MONEY MECHANISMS................................................................................... 39 
ANNEX E-7  MAJOR CONTRACT CHANGE .............................................................................................. 50 
ANNEX E-8  CATALOGUE OF OPTIONAL SYSTEMS, SERVICES AND PRODUCTS ....................... 52 
 
Schedule E (Pricing) 

Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
SCHEDULE E 
 
PRICING 

INTRODUCTION  
1.1 
This Schedule sets out the Service Charges (and the calculations, if applicable, for adjusting 
the  Service  Charges)  payable  by  the  Authority  to  the  Contractor  in  consideration  for  the 
provision  of  the  Services  as  defined  in  the  Contract  to  the  Service  Levels  as  detailed  in 
Schedule F (Service Level Requirements).  
1.2 
Subject  to  the  adjustments  described  in  this  Schedule,  the  Service  Charges  due  from  the 
Authority  to  the  Contractor  each  month  under  the  Contract  are  identified  as  the  Monthly 
Baseline Charges in Clause 3.1 below.  Each month, the Monthly Baseline Charges amounts 
are  subject  to  adjustments  (if  any)  relating  to  the  application  of  Service  Credits  or  Service 
Incentive  Payments  and  the  limitation  caps  (i.e.  10%  and  30%  caps  identified  in  Clause  4 
below).    Once  these  adjustments  have  been  made,  the  actual  Service  Charges  due  to  the 
Contractor in the  relevant month  are identified  as the  Actual Monthly  Charges and they  are 
calculated  in  accordance  with  Clause  4  below.    Subject  to  Clause  1.3  below,  in  addition  to 
paying  the  Contractor  the Actual  Monthly  Charges,  Clause  8  below  identifies other  Service 
Charges  that  shall  be  payable  to  the  Contractor  by  the  Authority  or  the  Police  Forces,  as 
applicable,  if  Optional  Services  are  ordered  by  the  Authority  and/or  the  relevant  Police 
Forces.  Clauses 6 and 7 below contain provisions relating to adjustments that shall be made 
to  the  Service  Charges  if  there  are  changes  to  the  number  of  Bureau  or  the  baseline 
volumetrics. 
1.3 
The Service Charges for any Optional Services that may be provided under the Contract are 
set out in Annex E-8 (Catalogue of Optional Systems, Services and Products).  Although 
Livescan  Services  are  a  category  of  Optional  Service,  the  Service  Charges  for the  Livescan 
units identified for Scotland at the Effective Date shall be charged as part of the core Services 
(as such Service Charges are identified in the table at Clause 4.2 below).  The Parties agree 
that such Service Charges shall be payable by the Authority to the Contractor as part of the 
Actual  Monthly  Charges  each  month.    However,  if  any  Livescan  Services  are  ordered  after 
the  Effective  Date,  by  the  relevant  Police  Forces  in  England  and  Wales  or  Scotland  (such 
orders shall be made in accordance with Schedule U (Ordering Procedures) and Schedule R 
(Livescan and EIUs)), the Service Charges for such Livescan Services shall be payable to the 
Contractor by the Police Forces (not the Authority) in accordance with the pricing set out in 
Clause  8.4  below.    Subject  to  Clause  18  of  Schedule  B  (Conditions  of  Contract),  if  any 
disputes  arise  in  relation  to  any  Service  Charges  incurred  in  accordance  with  Schedule  R 
(Livescan  and  EIUs),  the  Contractor  acknowledges  that  such  disputes  are  between  the 
Contractor and the relevant Police Force and the Contractor agrees that it shall not make any 
claim or demand against the Authority in respect of such Service Charges. 
1.4 
The Authority shall pay the Service Charges, identified in this Schedule, in accordance with 
the invoicing procedures set out in Clause 5 below. 
1.5 
Save  as  expressly  set  out  otherwise  in  the  Contract,  the  Service  Charges  are  fixed  for  the 
Term of the Contract until amended in accordance with this Schedule or Schedule L (Change 
Control Procedures).  

GENERAL PRINCIPLES 
2.1 
In  the  event  that  the  UK  adopts  the  Euro  currency  during  the  period  of  this  Contract,  the 
Contractor shall amend the Service Charges in accordance with the conversion provisions of 
Clauses 15.9 and 15.10 of Schedule B (Conditions of Contract). 
Schedule E (Pricing) 

Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
2.2 
The Service Charges identified in this Schedule are exclusive of VAT. 
2.3 
The cost of provision of WAN and LAN services under the Contract, including connections 
and  provision  of  sufficient  bandwidth  to  support  each  aspect  of  the  Services  and  network 
infrastructure to each Police Force Fingerprint Bureaux and Custody Suite where Equipment 
is  installed,  is  included  in  the  Monthly  Baseline  Charges.    The  contract  existing  at  the 
Effective  Date  for  the  PNN/CJX  services  may  be  re-competed  during  the  Term  of  the 
Contract  and  the  costs  that  may  be  incurred  by  the  Contractor  as  a  result  of  such  re-
competition  have  been  included  by  the  Contractor  in  the  pricing  in  this  Schedule.    Any 
amendments  to  the  PNN/CJX  arrangements  that  affect  the  Services  shall  be  agreed  by  the 
Parties in accordance with Schedule L (Change Control Procedures). 
2.4 
Unless  the  Parties  agree  to  use  a  different  mechanism,  the  Parties  shall  use  Major  Contract 
Change  Financial  Model  in  Annex  E-7-A  if  it  is  required  to  calculate  the  IRR  pursuant  to 
Clause 44.1.3 of Schedule B (Conditions of Contract).  

MONTHLY BASELINE CHARGES 
3.1 
The  Monthly  Baseline  Charges  for  England,  Wales  and  Scotland,  (including  Livescan 
Services for Scotland only) are set out in the following table: 
Service Description 
Monthly Baseline Charges (£) 
The  Services  provided  at  the  date  of  TOR 
1,268,540  
for England, Wales and Scotland 
The  Services  provided  at  the  date  of  FOC 
1,268,540  
for England, Wales and Scotland 
 
3.2 
The Monthly Baseline Charges set out in Clause 3.1 above shall be subject to the adjustments 
described in Clause 4 below, and if applicable, adjusted accordingly. 
3.3 
The Monthly Baseline Charges include the following costs: 
3.3.1  all  refresh  of  technology  hardware  and  software  necessary  for  on-going  delivery  of 
the Services, as detailed in Schedule D (Detailed Operational Requirements); 
3.3.2  all costs arising from provision of Assets required to deliver the Services during the 
Term; and 
3.3.3  the  provision  of  Termination  Assistance  in  accordance  with  Schedule  N  (Exit 
Strategy)  but  excluding  Termination  Assistance  provided  after  the  applicable 
Services Transfer Date to the Successor Contractor. 

SERVICE  CREDITS  AND  SERVICE  INCENTIVE  PAYMENTS  /  ADJUSTMENTS  
AND  CALCULATION OF THE “ACTUAL MONTHLY CHARGES” 
4.1 
As  set  out  in  Schedule  F (Service  Level  Requirements), a  total  of  eight  (8)  Bureaux Tiers 
have  been  defined  and  each  Bureaux  in  England,  Wales  and  Scotland  has  been  allocated  at 
TOR to one of the Bureau Tiers, as detailed in the table at Clause 4.1.1 below.  The Bureau 
Tiers  have  been  defined  according  to  volume,  capacity,  throughput  and  equipment 
requirements  in  accordance  with  Schedule  D  (Detailed  Operational  Requirements).    At 
TOR,  the  Monthly  Baseline  Charges  that  apply  to  each  Bureaux  is  set  out  in  the  table  at 
Clause  4.1.1  below  (with  each  Bureaux  in  the  same  Bureau  Tier  having  the  same  Monthly 
Baseline Charges).  The Monthly Baseline Charges for the Livescan Services in Scotland at 
TOR  and  FOC  are  identified  in the tables  at  Clauses  4.1.1  and  4.1.4  below  and  the  table  at 
Schedule E (Pricing) 

Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
Clause  4.2.1  below  provides  a  detailed  breakdown  for  each  of  the  Scottish  Bureaus.    The 
Parties  acknowledge  that,  at  the TOR  date  for  England  and  Wales,  the  Bureau  for  Scotland 
will not be included in the table set out at Clause 4.1.1 below (as described in more detail in 
Clause  4.1.2(a)  below).    However,  the  Bureau  for  Scotland  shall  be  added  to  the  relevant 
Bureau Tier as such Bureau in Scotland are accepted by the Authority by FOC in accordance 
with Schedule H (Acceptance Procedures).  
4.1.1  TOR - Monthly Baseline Charges pricing table. 
Bureau / Livescan:  Schedule E Pricing (TOR) 
Bureau Tier 
Relative 
Normalised 
Number of 
Monthly Baseline 
Overall Monthly 
Bureau 
Bureau 
Bureau / 
Charges (£) per 
Baseline Charges 
Weighting 
Weighting 
Livescan 
Schedule E for each  (£) per Bureau 
Bureaux / Livescan  Tier  
Tier 1 
1.00 
0.12% 
0  (Bureau)  


Tier 2 
2.00 
0.23% 
6 (Bureau) 
4,670 
28,020 
Tier 3 
6.43 
0.74% 
10 (Bureau) 
11,302 
113,020 
Tier 4 
9.44 
1.09% 
15 (Bureau) 
15,804 
237,060 
Tier 5 
18.88 
2.17% 
12 (Bureau) 
29,935 
359,220 
Tier 6 
33.36 
3.84% 
5 (Bureau) 
52,000 
260,000 
Tier 7 
45.80 
5.27% 
0 (Bureau) 


Tier 8 
132.92 
15.30% 
1 (Bureau) 
199,880 
199,880 
Monthly Baseline Charges (for Bureau in 
49 (Bureau) 
 
1,197,200 
England, Wales and Scotland) 
41 (Livescan 
Monthly Baseline Charges (for Scottish Livescan 
1,740 
71,340 
Units)  
Units) 
 
 
 
MONTHLY BASELINE CHARGES 
 
 
1,268,540 
(TOTAL)   
 
4.1.2  TOR  – Monthly Baseline Charges pricing table by Bureaux. 
(a) 
The  table  in  this  Clause  4.1.2  does  not  list  the  Scottish  Bureau  at  the  TOR 
date  for  England  and  Wales  because  such  Bureau  shall  not  be  provided  as 
part of the Services until the relevant TOR date for Scotland - which does not 
occur until after the TOR date for England and Wales.  The Scottish Bureau 
(included  in  Clause  4.1.5  below)  shall  be  added  to  this  table  by  FOC  on 
acceptance of such Bureau by the Authority in accordance with Schedule H 
(Acceptance  Procedures).    The  Parties  acknowledge  that  the  Monthly 
Baseline Charges, identified in Clause 3.1 above, shall not change when such 
Scottish  Bureau  are  added  to  this  table.    However,  when  such  Scottish 
Bureaux  are  accepted  by  the  Authority,  the  table  setting  out  the  weightings 
between  the  Bureau  Tiers  at  Clause  4.1.1  above  shall  be  adjusted,  and  this 
will  impact  the  Service  Credit  and  Service  Incentive  Payments  calculation, 
which in turn, will change the Actual Monthly Charges due to the Contractor, 
as more particularly described in this Schedule.  
 
Schedule E (Pricing) 

Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
Schedule E Pricing  
Actual Monthly Charges For Bureau (TOR) 
 
Monthly 
Monthly 
Service Score 
Baseline 
Actual Monthly 
Bureau / Site 
Tier 
Calculated as  Charges (£) as 
Charges (£) 
per Schedule F  per Schedule E 






1  Avon + Somerset 

Calculation 
29,935.00 
 D Multiplied by E 
2  Bedfordshire 

Calculation 
15,804.00 
 D Multiplied by E 
3  British Transport Police 

Calculation 
4,670.00 
 D Multiplied by E 
4  Cambridgeshire 

Calculation 
11,302.00 
 D Multiplied by E 
5  Cheshire 

Calculation 
11,302.00 
 D Multiplied by E 
6  City of London 

Calculation 
4,670.00 
 D Multiplied by E 
7  Cleveland 

Calculation 
4,670.00 
 D Multiplied by E 
8  Cumbria 

Calculation 
15,804.00 
 D Multiplied by E 
9  Customs and Excise 

Calculation 
4,670.00 
 D Multiplied by E 
10  Derbyshire 

Calculation 
15,804.00 
 D Multiplied by E 
11  Devon + Cornwall 

Calculation 
29,935.00 
 D Multiplied by E 
12  Dorset 

Calculation 
15,804.00 
 D Multiplied by E 
13  Durham 

Calculation 
29,935.00 
 D Multiplied by E 
14  Durham Training Centre 

Calculation 
4,670.00 
 D Multiplied by E 
15  Dyfed Powys 

Calculation 
11,302.00 
 D Multiplied by E 
16  Essex 

Calculation 
29,935.00 
 D Multiplied by E 
17  External Transaction Bureau 

Calculation 
15,804.00 
 D Multiplied by E 
18  Gloucestershire 

Calculation 
11,302.00 
 D Multiplied by E 
19  Greater Manchester 

Calculation 
52,000.00 
 D Multiplied by E 
20  Gwent 

Calculation 
11,302.00 
 D Multiplied by E 
21  Hampshire 

Calculation 
29,935.00 
 D Multiplied by E 
22  Hertfordshire 

Calculation 
15,804.00 
 D Multiplied by E 
23  Humberside 

Calculation 
15,804.00 
 D Multiplied by E 
24  Kent 

Calculation 
29,935.00 
 D Multiplied by E 
25  Lancashire 

Calculation 
52,000.00 
 D Multiplied by E 
26  Leicestershire 

Calculation 
15,804.00 
 D Multiplied by E 
27  Lincolnshire 

Calculation 
11,302.00 
 D Multiplied by E 
28  Merseyside 

Calculation 
29,935.00 
 D Multiplied by E 
29  Metropolitan 

Calculation 
199,880.00 
 D Multiplied by E 
30  Metropolitan  Training 

Calculation 
 D Multiplied by E 
Centre (Hendon) 
 
4,670.00 
31  NIS 

Calculation 
15,804.00 
 D Multiplied by E 
32  Norfolk 

Calculation 
15,804.00 
 D Multiplied by E 
33  North Wales 

Calculation 
11,302.00 
 D Multiplied by E 
34  North Yorkshire 

Calculation 
11,302.00 
 D Multiplied by E 
35  Northamptonshire 

Calculation 
15,804.00 
 D Multiplied by E 
36  Northumbria 

Calculation 
29,935.00 
 D Multiplied by E 
37  Nottinghamshire 

Calculation 
15,804.00 
 D Multiplied by E 
38  South Wales 

Calculation 
29,935.00 
 D Multiplied by E 
39  South Yorkshire 

Calculation 
29,935.00 
 D Multiplied by E 
40  Staffordshire 

Calculation 
15,804.00 
 D Multiplied by E 
41  Suffolk 

Calculation 
11,302.00 
 D Multiplied by E 
42  Surrey 

Calculation 
29,935.00 
 D Multiplied by E 
43  Sussex 

Calculation 
29,935.00 
 D Multiplied by E 
44  Thames Valley 

Calculation 
52,000.00 
 D Multiplied by E 
Schedule E (Pricing) 

Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
Schedule E Pricing  
Actual Monthly Charges For Bureau (TOR) 
 
Monthly 
Monthly 
Service Score 
Baseline 
Actual Monthly 
Bureau / Site 
Tier 
Calculated as  Charges (£) as 
Charges (£) 
per Schedule F  per Schedule E 






45  Warwickshire 

Calculation 
11,302.00 
 D Multiplied by E 
46  West Mercia 

Calculation 
15,804.00 
 D Multiplied by E 
47  West Midlands 

Calculation 
52,000.00 
 D Multiplied by E 
48  West Yorkshire 

Calculation 
52,000.00 
 D Multiplied by E 
49  Wiltshire 

Calculation 
15,804.00 
 D Multiplied by E 
 
Sum 
of 
the  
Monthly Baseline Charges for all Bureau 
above  =  X  (i.e. 
 
for 
the 
TOR 
 
date,  X  should 
 
be £1,197,200) 
 
 
 
 
 
 
Total for all Bureau (Before Cap) 
Sum of the above = Y 
   
 
 
The  difference  between 
X  and  Y  shall  be 
Capping Adjustment  
calculated but Y cannot 
 
be  greater  than  X  by  
 
more  than  10%  or  less 
 
than X by more than 30 
   
%.  If  Y  is  outside  of 
 
these  10%  and  30% 
 
limitation 
caps, 
an 
 
adjustment 
shall 
be 
 
made  to  bring  Y  within 
the caps).  
 
ACTUAL MONTHLY CHARGES (BUREAU) – AT TOR 
Total  (i.e.  Y  plus  or 
 
less any adjustment due 
 
 
to  the  limitation  caps 
 
above) 
 
4.1.3  Post-TOR – Pre-FOC  – Monthly Baseline Charges pricing table by Bureaux. 
Schedule E Pricing  
Actual Monthly Charges For Bureau (TOR) 
 
Monthly 
Monthly 
Service Score 
Baseline 
Actual Monthly 
Bureau / Site 
Tier 
Calculated as  Charges (£) as 
Charges (£) 
per Schedule F  per Schedule E 






1  Avon + Somerset 

Calculation 
29,935.00 
 D Multiplied by E 
2  Bedfordshire 

Calculation 
15,804.00 
 D Multiplied by E 
3  British Transport Police 

Calculation 
4,670.00 
 D Multiplied by E 
Schedule E (Pricing) 

Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
Schedule E Pricing  
Actual Monthly Charges For Bureau (TOR) 
 
Monthly 
Monthly 
Service Score 
Baseline 
Actual Monthly 
Bureau / Site 
Tier 
Calculated as  Charges (£) as 
Charges (£) 
per Schedule F  per Schedule E 






4  Cambridgeshire 

Calculation 
11,302.00 
 D Multiplied by E 
5  Cheshire 

Calculation 
11,302.00 
 D Multiplied by E 
6  City of London 

Calculation 
4,670.00 
 D Multiplied by E 
7  Cleveland 

Calculation 
4,670.00 
 D Multiplied by E 
8  Cumbria 

Calculation 
15,804.00 
 D Multiplied by E 
9  Customs and Excise 

Calculation 
4,670.00 
 D Multiplied by E 
10  Derbyshire 

Calculation 
15,804.00 
 D Multiplied by E 
11  Devon + Cornwall 

Calculation 
29,935.00 
 D Multiplied by E 
12  Dorset 

Calculation 
15,804.00 
 D Multiplied by E 
13  Durham 

Calculation 
29,935.00 
 D Multiplied by E 
14  Durham Training Centre 

Calculation 
4,670.00 
 D Multiplied by E 
15  Dyfed Powys 

Calculation 
11,302.00 
 D Multiplied by E 
16  Essex 

Calculation 
29,935.00 
 D Multiplied by E 
17  External Transaction Bureau 

Calculation 
15,804.00 
 D Multiplied by E 
18  Gloucestershire 

Calculation 
11,302.00 
 D Multiplied by E 
19  Greater Manchester 

Calculation 
52,000.00 
 D Multiplied by E 
20  Gwent 

Calculation 
11,302.00 
 D Multiplied by E 
21  Hampshire 

Calculation 
29,935.00 
 D Multiplied by E 
22  Hertfordshire 

Calculation 
15,804.00 
 D Multiplied by E 
23  Humberside 

Calculation 
15,804.00 
 D Multiplied by E 
24  Kent 

Calculation 
29,935.00 
 D Multiplied by E 
25  Lancashire 

Calculation 
52,000.00 
 D Multiplied by E 
26  Leicestershire 

Calculation 
15,804.00 
 D Multiplied by E 
27  Lincolnshire 

Calculation 
11,302.00 
 D Multiplied by E 
28  Merseyside 

Calculation 
29,935.00 
 D Multiplied by E 
29  Metropolitan 

Calculation 
199,880.00 
 D Multiplied by E 
30  Metropolitan  Training 

Calculation 
 D Multiplied by E 
Centre (Hendon) 
 
4,670.00 
31  NIS 

Calculation 
14,307.50 
 D Multiplied by E 
32  Norfolk 

Calculation 
15,804.00 
 D Multiplied by E 
33  North Wales 

Calculation 
11,302.00 
 D Multiplied by E 
34  North Yorkshire 

Calculation 
11,302.00 
 D Multiplied by E 
35  Northamptonshire 

Calculation 
15,804.00 
 D Multiplied by E 
36  Northumbria 

Calculation 
29,935.00 
 D Multiplied by E 
37  Nottinghamshire 

Calculation 
15,804.00 
 D Multiplied by E 
38  South Wales 

Calculation 
29,935.00 
 D Multiplied by E 
39  South Yorkshire 

Calculation 
29,935.00 
 D Multiplied by E 
40  Staffordshire 

Calculation 
15,804.00 
 D Multiplied by E 
41  Suffolk 

Calculation 
11,302.00 
 D Multiplied by E 
42  Surrey 

Calculation 
29,935.00 
 D Multiplied by E 
43  Sussex 

Calculation 
29,935.00 
 D Multiplied by E 
44  Thames Valley 

Calculation 
52,000.00 
 D Multiplied by E 
45  Warwickshire 

Calculation 
11,302.00 
 D Multiplied by E 
46  West Mercia 

Calculation 
15,804.00 
 D Multiplied by E 
47  West Midlands 

Calculation 
52,000.00 
 D Multiplied by E 
Schedule E (Pricing) 

Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
Schedule E Pricing  
Actual Monthly Charges For Bureau (TOR) 
 
Monthly 
Monthly 
Service Score 
Baseline 
Actual Monthly 
Bureau / Site 
Tier 
Calculated as  Charges (£) as 
Charges (£) 
per Schedule F  per Schedule E 






48  West Yorkshire 

Calculation 
52,000.00 
 D Multiplied by E 
49  Wiltshire 

Calculation 
15,804.00 
 D Multiplied by E 
  IDENT1 QA & Monitoring 
Calculation 
D Multiplied by E 
Capability 
N/A 
1,496.50 
 
Sum 
of 
the  
Monthly Baseline Charges for all Bureau 
above  =  X  (i.e. 
 
for 
the 
TOR 
 
date,  X  should 
 
be £1,197,200) 
 
 
 
 
 
 
Total for all Bureau (Before Cap) 
Sum of the above = Y 
   
 
 
The  difference  between 
X  and  Y  shall  be 
Capping Adjustment  
calculated but Y cannot 
 
be  greater  than  X  by  
 
more  than  10%  or  less 
 
than X by more than 30 
   
%.  If  Y  is  outside  of 
 
these  10%  and  30% 
 
limitation 
caps, 
an 
 
adjustment 
shall 
be 
 
made  to  bring  Y  within 
the caps).  
 
ACTUAL MONTHLY CHARGES (BUREAU) – AT TOR 
Total  (i.e.  Y  plus  or 
 
less any adjustment due 
 
 
to  the  limitation  caps 
 
above) 
 
Explanatory Notes for the table in this Clause 4.1.2 and the tables in Clause 4.1.1 above, and 
Clauses 4.1.4, 4.1.5 and 4.1.5 below:   
Note  1:    Relative  Bureau  Weighting  is  the  weighting  evaluated  for  a  Bureaux  (within  a 
particular  Bureau  Tier)  that  is  used  in  calculating  its  cost  in  comparison  with  the  cost  of  a 
Bureaux in Bureau Tier 1.  The weighting takes account of factors such as volume, capacity, 
throughput  and  equipment  requirements,  as  contained  in  Schedule  D  (Detailed  Operational 
Requirements).    All  changes  to  the  Bureau  weightings  shall  be  made  in  accordance  with 
Schedule L (Change Control Procedure). 
Note  2:    Normalised  Bureau  Weighting  is  the  share  of  the  Monthly  Baseline  Charges 
(including  Livescan  Scotland)  in  percentage  terms  that  an  individual  Bureaux  within  a 
specified Bureau Tier represents. 
Schedule E (Pricing) 

Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
Note  3:    Number  of  Bureau  shows  the  number  of  Bureaux  within  each  Bureau  Tier  at  TOR 
and FOC. 
Note 4:  Monthly Baseline Charges per Bureaux records the monthly cost of a single Bureaux 
within each Bureau Tier (or the monthly cost of a single Livescan Unit for Scotland). 
Note  5:    Overall  Tier  Monthly  Baseline  Charges  are  the  Monthly  Baseline  Charge  per 
Bureaux, for a specified Bureau Tier, multiplied by the number of Bureau in that Bureau Tier 
(or  the  Monthly  Baseline  Charges  of  a  Livescan  Scotland  unit  multiplied  by  the  number  of 
Livescan Scotland units). 
4.1.4  FOC - Monthly Baseline Charges pricing table. 
Bureau / Livescan:  Schedule E Pricing (FOC) 
Bureau Tier 
Relative 
Normalised 
Number of 
Monthly Baseline 
Overall 
Bureau 
Bureau 
Bureau / 
Charges (£) per 
Monthly 
Weighting  
Weighting 
Livescan 
Schedule E for each  Baseline 
Bureaux / Livescan 
Charges (£) per 
Bureau Tier 
Tier 1 
1.00 
0.12% 
4 (Bureau) 
1,496.50 
5,986 
Tier 2 
2.00 
0.23% 
9 (Bureau) 
2,993.00 
26,937 
Tier 3 
6.43 
0.74% 
10 (Bureau) 
9,625.50 
96,255 
Tier 4 
9.44 
1.09% 
15 (Bureau) 
14,126.93 
211,904 
Tier 5 
18.88 
2.17% 
12 (Bureau) 
28,253.92 
339,047 
Tier 6 
33.36 
3.84% 
5 (Bureau) 
49,923.20 
249,616 
Tier 7 
45.80 
5.27% 
1 (Bureau) 
68,540.00 
68,540 
Tier 8 
132.92 
15.30% 
1 (Bureau) 
198,915.00 
198,915 
Monthly Baseline Charges (for Bureau in 
57 (Bureau) 
 
1,197,200 
England, Wales and Scotland) 
Monthly Baseline Charges (for Scottish 
41 (Livescan 
1,740 
71,340 
Livescan) 
Units)  
MONTHLY BASELINE CHARGES 
1,268,540 
 
 
(TOTAL) 
 
 
4.1.5  FOC - Monthly Baseline Charges pricing table by Bureaux. 
(a) 
The Authority shall pay the Monthly Baseline Charges for all Bureau to the 
Contractor each  month,  being  the sum  of  the  Monthly  Baseline  Charges  for 
each Bureaux, pursuant to parameters detailed in Schedule F (Service Level 
Requirements).    The  Monthly  Baseline  Charges  for  each  Bureaux  shall  be 
adjusted  downwards,  by  the  application  of  Service  Credits  and/or  upwards, 
by the application of Service Incentive Payments.  The adjustment for Service 
Credits and Service Incentive Payments shall be achieved by multiplying the 
Monthly  Baseline  Charges  for  a  Bureaux  by  the  Service  Score  for  the 
Bureaux (the Service Score is calculated according to the formula detailed in 
Clause 4 of Part 2 of Schedule F (Service Level Requirements), where the 
latter  is  expressed  as  a  percentage.    The  Actual  Monthly  Charges  for  all 
Bureau shall be the sum of the individual Actual Monthly Charges for each 
Bureaux  after  adjustment  for  the  capping  mechanism  set  out  in  Schedule  F 
(Service Level Requirements). 
Schedule E (Pricing) 

Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
Bureau:  Schedule E Pricing (FOC) 
 
Monthly 
Monthly 
Service Score 
Baseline 
Actual Monthly 
Bureau / Site 
Tier 
Calculated as   Charges (£) as 
Charge (£) 
per Schedule  per Schedule 








1  Avon + Somerset 

Calculation 
28,253.92    D Multiplied by E 
2  Bedfordshire 

Calculation 
14,126.93    D Multiplied by E 
3  Cambridgeshire 

Calculation 
9,625.50    D Multiplied by E 
4  Cheshire 

Calculation 
9,625.50    D Multiplied by E 
5  City of London 

Calculation 
2,993.00    D Multiplied by E 
6  Cleveland 

Calculation 
2,993.00    D Multiplied by E 
7  Cumbria 

Calculation 
14,126.93    D Multiplied by E 
8  Derbyshire 

Calculation 
14,126.93    D Multiplied by E 
9  Devon + Cornwall 

Calculation 
28,253.92    D Multiplied by E 
10  Dorset 

Calculation 
14,126.93    D Multiplied by E 
11  Durham 

Calculation 
28,253.92    D Multiplied by E 
12  Dyfed Powys 

Calculation 
9,625.50    D Multiplied by E 
13  Essex 

Calculation 
28,253.92    D Multiplied by E 
14  Gloucestershire 

Calculation 
9,625.50    D Multiplied by E 
15  Greater Manchester 

Calculation 
49,923.20    D Multiplied by E 
16  Gwent 

Calculation 
9,625.50    D Multiplied by E 
17  Hampshire 

Calculation 
28,253.92    D Multiplied by E 
18  Hertfordshire 

Calculation 
14,126.93    D Multiplied by E 
19  Humberside 

Calculation 
14,126.93    D Multiplied by E 
20  Kent 

Calculation 
28,253.92    D Multiplied by E 
21  Lancashire 

Calculation 
49,923.20    D Multiplied by E 
22  Leicestershire 

Calculation 
14,126.93    D Multiplied by E 
23  Lincolnshire 

Calculation 
9,625.50    D Multiplied by E 
24  Merseyside 

Calculation 
28,253.92    D Multiplied by E 
25  Metropolitan 

Calculation 
198,915.00    D Multiplied by E 
26  Norfolk 

Calculation 
14,126.93    D Multiplied by E 
27  North Wales 

Calculation 
9,625.50    D Multiplied by E 
28  North Yorkshire 

Calculation 
9,625.50    D Multiplied by E 
29  Northamptonshire 

Calculation 
14,126.93    D Multiplied by E 
30  Northumbria 

Calculation 
28,253.92    D Multiplied by E 
31  Nottinghamshire 

Calculation 
14,126.93    D Multiplied by E 
32  South Wales 

Calculation 
28,253.92    D Multiplied by E 
33  South Yorkshire 

Calculation 
28,253.92    D Multiplied by E 
34  Staffordshire 

Calculation 
14,126.93    D Multiplied by E 
35  Suffolk 

Calculation 
9,625.50    D Multiplied by E 
36  Surrey 

Calculation 
28,253.92    D Multiplied by E 
37  Sussex 

Calculation 
28,253.92    D Multiplied by E 
38  Thames Valley 

Calculation 
49,923.20    D Multiplied by E 
39  Warwickshire 

Calculation 
9,625.50    D Multiplied by E 
40  West Mercia 

Calculation 
14,126.93    D Multiplied by E 
41  West Midlands 

Calculation 
49,923.20    D Multiplied by E 
42  West Yorkshire 

Calculation 
49,923.20    D Multiplied by E 
43  Wiltshire 

Calculation 
14,126.93    D Multiplied by E 
44  Aberdeen 

Calculation 
1,496.50    D Multiplied by E 
Schedule E (Pricing) 

Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
Bureau:  Schedule E Pricing (FOC) 
 
Monthly 
Monthly 
Service Score 
Baseline 
Actual Monthly 
Bureau / Site 
Tier 
Calculated as   Charges (£) as 
Charge (£) 
per Schedule  per Schedule 








45  Dundee 

Calculation 
1,496.50    D Multiplied by E 
46  Edinburgh 

Calculation 
1,496.50    D Multiplied by E 
47  Glasgow 

Calculation 
68,540.00    D Multiplied by E 
48  British Transport Police 

Calculation 
2,993.00    D Multiplied by E 
49  Customs and Excise 

Calculation 
2,993.00    D Multiplied by E 
50  NIS 

Calculation 
14,126.93    D Multiplied by E 
51  National Crime Squad 

Calculation 
2,993.00    D Multiplied by E 
52  Specialist Crimes Bureau 

Calculation 
2,993.00    D Multiplied by E 
53  External Transaction Bureau 

Calculation 
14,126.93    D Multiplied by E 
54  Durham Training Centre 

Calculation 
2,993.00    D Multiplied by E 
55  Wyboston Training Centre 

Calculation 
2,993.00    D Multiplied by E 
56  IDENT1 QA & Monitoring 

Calculation 
1,496.50    D Multiplied by E 
Capability 
57  Metropolitan  Training Centre 

Calculation 
2,993.00    D Multiplied by E 
(Hendon) 
  Monthly Service Charge for all Bureau 
Sum 
of 
the  
above  =  X  (i.e. 
for 
the 
TOR 
date,  X  should 
be £1,197,200 
Sum of the above = 
  Total for all Bureau (Before Cap) 

The 
difference 
Capping Adjustment 
between  X  and  Y 
 
shall  be  calculated 
 
but  Y  cannot  be 
 
greater  than  X  by  
 
more  than  10%  or 
 
less than X by more 
 
 
than  30  %.  If  Y  is 
 
outside 
of 
these 
 
10% 
and 
30% 
 
limitation  caps,  an 
 
adjustment  shall  be 
 
made  to  bring  Y 
 
within the caps). 
TOTAL 
(i.e. 

ACTUAL MONTHLY CHARGES – AT FOC 
plus  or  less  any 
 
 
adjustment  due  to 
 
the  limitation  caps 
 
above). 
 
4.2 
Scotland - Livescan Services 
4.2.1  The Actual Monthly Charges for Livescan Scotland in the table in this Clause 4.2.1 
shall be calculated according to the same mechanism applied to the Bureau as set out 
Schedule E (Pricing) 
10 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
in  Clause  4.1.5(a)  above,  with  a  Service  Score  for  Livescan  Scotland applied  to  the 
Monthly Baseline Charges for Livescan Scotland.   
Livescan:  Schedule E Pricing 
  Location 
Charging Station / Site 
Monthly Service  Monthly Baseline  Adjusted Monthly 
 
 
Score per 
Charges (£) per 
Charge (£) 
 
 
Schedule F 
Schedule E 
 
 
 
 






 
 
Central Scotland Police 
 
 
 

Scotland 
Falkirk 
Calculation 
1,740 or less 
D Multiplied by E 

Scotland 
Stirling 
Calculation 
1,740 or less 
D Multiplied by E 
 
 
Dumfries & Galloway 
 
 
 
Constabulary 

Scotland 
Dumfries 
Calculation 
1,740 or less 
D Multiplied by E 

Scotland 
Stranraer 
Calculation 
1,740 or less 
D Multiplied by E 

Scotland 
Lockerbie 
Calculation 
1,740 or less 
D Multiplied by E 
 
 
Grampian Police 
 
 
 

Scotland 
Queen Street, Aberdeen 
Calculation 
1,740 or less 
D Multiplied by E 
(Site1) 

Scotland 
Queen Street, Aberdeen (Site 
Calculation 
1,740 or less 
D Multiplied by E 
2) 

Scotland 
Peterhead 
Calculation 
1,740 or less 
D Multiplied by E 

Scotland 
Elgin 
Calculation 
1,740 or less 
D Multiplied by E 
 
 
Fife Constabulary 
 
 
 
10 
Scotland 
Dunfermline 
Calculation 
1,740 or less 
D Multiplied by E 
11 
Scotland 
Kirkaldy 
Calculation 
1,740 or less 
D Multiplied by E 
12 
Scotland 
Glenrothes 
Calculation 
1,740 or less 
D Multiplied by E 
 
 
Lothians and Borders 
 
 
 
Police 
13 
Scotland 
Dalkeith 
Calculation 
1,740 or less 
D Multiplied by E 
14 
Scotland 
Hawick 
Calculation 
1,740 or less 
D Multiplied by E 
15 
Scotland 
Livingston 
Calculation 
1,740 or less 
D Multiplied by E 
16 
Scotland 
St Leonards 
Calculation 
1,740 or less 
D Multiplied by E 
17 
Scotland 
Wester Hailes 
Calculation 
1,740 or less 
D Multiplied by E 
18 
Scotland 
Drylaw 
Calculation 
1,740 or less 
D Multiplied by E 
19 
Scotland 
Craigmillar 
Calculation 
1,740 or less 
D Multiplied by E 
 
 
Northern Constabulary 
 
 
 
20 
Scotland 
Inverness 
Calculation 
1,740 or less 
D Multiplied by E 
21 
Scotland 
Dingwall 
Calculation 
1,740 or less 
D Multiplied by E 
 
 
Strathclyde Police 
 
 
 
22 
Scotland 
Aitkenhead Road 
Calculation 
1,740 or less 
D Multiplied by E 
23 
Scotland 
Ayr 
Calculation 
1,740 or less 
D Multiplied by E 
24 
Scotland 
Baird Street 
Calculation 
1,740 or less 
D Multiplied by E 
25 
Scotland 
Clydebank 
Calculation 
1,740 or less 
D Multiplied by E 
26 
Scotland 
Coatbridge 
Calculation 
1,740 or less 
D Multiplied by E 
27 
Scotland 
Partrick, Dumbarton Road 
Calculation 
1,740 or less 
D Multiplied by E 
28 
Scotland 
Greenock 
Calculation 
1,740 or less 
D Multiplied by E 
29 
Scotland 
Hamilton 
Calculation 
1,740 or less 
D Multiplied by E 
30 
Scotland 
Helen Street 
Calculation 
1,740 or less 
D Multiplied by E 
31 
Scotland 
Kilmarnock 
Calculation 
1,740 or less 
D Multiplied by E 
32 
Scotland 
London Road 
Calculation 
1,740 or less 
D Multiplied by E 
Schedule E (Pricing) 
11 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
Livescan:  Schedule E Pricing 
  Location 
Charging Station / Site 
Monthly Service  Monthly Baseline  Adjusted Monthly 
 
 
Score per 
Charges (£) per 
Charge (£) 
 
 
Schedule F 
Schedule E 
 
 
 
 






 
 
Central Scotland Police 
 
 
 
33 
Scotland 
Maryhill 
Calculation 
1,740 or less 
D Multiplied by E 
34 
Scotland 
Motherwell 
Calculation 
1,740 or less 
D Multiplied by E 
35 
Scotland 
Paisley 
Calculation 
1,740 or less 
D Multiplied by E 
36 
Scotland 
Stewart Street 
Calculation 
1,740 or less 
D Multiplied by E 
37 
Scotland 
Saltcoats 
Calculation 
1,740 or less 
D Multiplied by E 
 
 
Tayside Police 
 
 
 
38 
Scotland 
Perth 
Calculation 
1,740 or less 
D Multiplied by E 
39 
Scotland 
Dundee 
Calculation 
1,740 or less 
D Multiplied by E 
40 
Scotland 
Arbroath 
Calculation 
1,740 or less 
D Multiplied by E 
 
 
BTP Scotland 
 
 
 
41 
Scotland 
Glasgow 
Calculation 
1,740 or less 
D Multiplied by E 
 
[Total to be   
 
 
 
added] 
  Monthly Baseline Charges for all core Livescan Services in  Sum of the above = 
 
Scotland 
X (i.e. £71,340) 
 
 
Actual Monthly Charges for Livescan Services in Scotland 
Sum of the above = Y 
(The Parties agree that Service Credit caps or Service Incentive Payment caps shall  
  not apply for the Livescan Services provided in Scotland.) 
 
 
 
4.2.2  The Monthly Baseline Charges of £1,740 (shown in the table at Clause 4.2.1 above) 
is the maximum charge for the Livescan Services provided in Scotland.  The Parties 
acknowledge  that  such  Monthly  Baseline  Charges  may  be  less  if  Livescan  volumes 
change in accordance with Clause 8.4 below.   
4.3 
The  Monthly  Baseline  Charges  identified  at  Clause  3.1  above  shall  be  subject  to  changes 
agreed pursuant to the terms of this Schedule and such changes shall be made in accordance 
with the procedures detailed in Schedule L (Change Control Procedures), including but not 
restricted to the re-allocation of a Bureaux to a different Bureau Tier to that agreed at TOR.  
The  addition  or  reduction  of  a  Bureaux  (as  detailed  in  Clause  6  below),  the  addition  or 
reduction  in  the  number  of  Livescan  Scotland  units,  and  changes  to  the  Monthly  Baseline 
Charges will be made at the end of the month in which they occur and shall be reflected in the 
next monthly invoice by the Contractor.  Each year during the Term, on or before 1 April, the 
Parties shall meet to discuss the allocation of Bureau amongst the Bureau Tiers.  If the Parties 
agree any changes that result in the re-allocation of an existing Bureaux from one Bureau Tier 
to another  Bureau Tier, such changes shall be implemented with effect from 1  April of the 
relevant year.  The Monthly Baseline Charges that shall apply at FOC for adding or removing 
individual  Bureau  and/or  Livescan  Services  in  Scotland  is  set  out in  the tables  contained  in 
Annex  E-3  (Addition  of  a  Bureaux  or  Removal  of  a  Bureaux  or  Police  Force).    The 
Authority acknowledges that the Service Charges in Annex E-3 (Addition of a Bureaux or 
Removal of a Bureaux or Police Force) have been calculated based on the assumption that 
the  number  of  Bureau  and  the  number  of  Scottish  Livescan  Units  existing  at  TOR  shall 
remain the same during the period between TOR and FOC. 
Schedule E (Pricing) 
12 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
4.4 
Milestone Pricing / Charges for Change Control Notes ( not included in tables  in  Clause 
4.1.1, 4.1.2, 4.1.4, 4.1.5 and 4.1.5 abov)e.   
ChangeControl 
Description 
Milestone 
Milestone 
Total Charges 
Note (CCN) 
Charges 
 
 
 
£ 
£ 
 
 
 
£ 
£ 
TOTAL Milestone Charges CCNs 
£ 
 
4.5 
Milestone Pricing / Charges for Purchase Orders ordered under Schedule U (Ordering 
Procedures) 
Purchase 
Description 
Milestone 
Milestone 
Total Charges 
Order 
Charges 
PO002 
G-8 
Conference  Conclusion  of  G-8 
£54,100.00 
£54,100.00 
Capability 
Conference 
 
 
 
£ 
£ 
TOTAL Milestone Charges Purchase Orders 
£54,100.00 
 
 

INVOICING 
5.1 
The  Authority  shall  pay  the  Actual  Monthly  Charges  each  month  to  the  Contractor  for  the 
provision of the Services. 
5.2 
The Contractor shall be entitled to submit invoices for payment on a monthly basis, in arrears 
of  provision  of  the  Services.    With  the  exception  of  the  first  and  final  payment,  the  Actual 
Monthly  Charges  shall  be  calculated  as  the  Monthly  Baseline  Charges  for  all  Bureau  and 
Livescan  Scotland  units  operational  for  the  month,  adjusted  by  the  Service  Credits  and 
Service  Incentive  Payments  applicable  for the  preceding  month.   The  first  payment  shall be 
the  Monthly  Baseline  Charges.    The  final  payment  at  the  end  of  the  Term  shall  be  the 
Monthly  Baseline  Charges  for  the  final  month,  adjusted  by  the  Service  Credits  and  Service 
Incentive Payments applicable to the final two (2) months of the Contract. 
5.3 
Subject to Clause 5.5 below, payment shall be made within thirty (30) days of receipt by the 
Authority of a valid invoice from the Contactor.   
5.4 
Invoices  shall  be  addressed  to:  Colin  Patton,  Head  of  Identification  Business,  Police 
Information Technology Organisation, 8th Floor, New King’s Beam House, 22 Upper Ground, 
London SE1 9QY.  From time to time, the Authority shall be entitled to provide notice to the 
Contractor  if  it  wishes  the  Contractor  to  send  the  invoices  to  a  different  person  during  the 
Term.  
Schedule E (Pricing) 
13 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
5.5 
If the Authority elects, at any time, at the Authority’s discretion, in accordance with Schedule 
L (Change Control Procedures), to change its payment terms to fifteen (15) days, in lieu of 
the standard thirty (30) day payment terms detailed in Clause 5.3 above, the discount terms of 
this Clause 5.5 shall apply.  The discount for invoices settled by the Authority within fifteen 
(15)  days  shall  apply  at  the  rate  of  1.2%  on  an  annual  basis  (0.05%  on  the  individual 
invoice/payment  amount).    To  qualify  for  the  discount,  funds  are  to  be  received  by  the 
Contractor  within  fifteen  (15)  days  of    the  Authority  receiving  a  valid  invoice  from  the 
Contractor.    If  the  Authority  fails  to  comply  with  the  fifteen  (15)  day  payment  terms  in  a 
particular  month,  it  shall  not  be  entitled  to  the  discount  set  out  in  this  Clause  5.5  for  that 
month.  Unless otherwise agreed between the Parties, the Authority acknowledges that it shall 
not be entitled to elect to change the payment terms pursuant to this Clause 5.5 on a variable 
month by month basis, for example, the Authority shall not be entitled to elect to pay invoices 
within  fifteen  (15)  days  in  one  month  and  revert  to  thirty  (30)  day  payment  terms  in  the 
following month.  A worked example of applying the discount described in this Clause 5.5 is 
set out in Clause 5.6 below. 
5.6 
In  the  event  that  the  Authority  elects  to  agree  a  fifteen  (15)  day  settlement  period  with  the 
Contractor, a worked example, for illustration purposes only, is set out below detailing how 
the discount would apply:  
if the Authority receives a valid invoice for £1,268,540 on 1 July 2005, then to qualify for the 
discount  pursuant  to  Clause  5.5  above,  the  Contractor,  on  or  before  16  July  2005,  must 
receive  £1,267,906  from  the  Authority.  The  monthly  discount  of  £634  is  calculated  as 
£1,268,540 * 0.0005 (0.05%) = £634. 

IMPACT OF AN INCREASE OR REDUCTION IN BUREAUX NUMBERS 
In  the  event  that  any  Bureau  are  added  to  or  subtracted  from  the  scope  of  the  Contract 
(including  as  detailed  in  Clause  14  of  Schedule  B  (Conditions  of  Contract))  or  a  Police 
Force  is  removed  from  the  scope  of  the  Contract  (including  as  detailed  in  Clause  14.3 
Schedule B (Conditions of Contract)), the Monthly Baseline Charges shall be subjected to 
an adjustment, calculated by application of the principles contained in Annex E-3 (Addition 
of  a  Bureaux  or  Removal  of  a  Bureaux  or  Police  Force),  and  agreed  by  the  Parties  in 
accordance with Schedule L (Change Control Procedures). 

POTENTIAL FUTURE CHANGES IN VOLUMETRICS 
7.1 
Annex  E-4  (Impact  of  Potential  Future  Volume  Changes)  sets  out  indicative  Service 
Charges for changes to the volumetrics. 
7.2 
The  Monthly  Baseline  Charges  for  the  Services  shall  be  calculated  in  accordance  with  the 
charge for the Services based on the volumetrics and number of Bureau as stated in Schedule 
D (Detailed Operational Requirements).  Without prejudice to the provisions of Clauses 4, 
6  and  7.4  of  Schedule  B  (Conditions  of  Contract),  in  the  event  that  the  Authority’s 
operational requirements change during the Term, resulting in an increase or reduction in the 
volume and/or scope of Services, any change to the Service Charges directly arising, due to 
such reduction or increase, shall be made in accordance with the applicable provisions of this 
Schedule  and  Schedule  L  (Change  Control  Procedures).    In  calculating  any  proposed 
change  to  the  Service  Charges,  the  Contractor  shall  provide  the  reconciliation,  between  the 
Service  Charges  proposed  and  the  indicative  Service  Charges  contained  in  Annex  E-4 
(Impact of Potential Future Volume Changes), for review by the Authority.   

OPTIONAL SERVICES 
8.1 
General 
Schedule E (Pricing) 
14 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
8.1.1  Clause  8  of  Schedule  B  (Conditions  of  Contract)  describes  how  the  Optional 
Services consist of the Catalogue of COSSP Items and it contains terms requiring all 
Optional  Service  to  be  ordered  in  accordance  with  Schedule  U  (Ordering 
Procedures), and in the case of EIU Services, it requires the Contractor to enter into 
a contract with each Police Force that requests EIU Services in accordance with the 
terms of Schedule R (Livescan and EIUs).  The Livescan Services are a category of 
EIU  Services,  and  as  set  out  in  Clause  1.3  above  and  Clause  8  of  Schedule  B 
(Conditions  of  Contract),  the  terms  of  Schedule  R  (Livescan  and  EIUs)  do  not 
apply  to  the  Livescan  Services  for  Scotland  that  the  Parties  identified  as  beginning 
from the Effective Date –  such Livescan Services shall be provided under the terms 
of Schedule B (Conditions of Contract).  
8.1.2  All of the Optional Service that the Authority or the Police Forces shall be entitled to 
order under the Contract are listed in the Catalogue of COSSP Items set out in Annex 
E-8 (Catalogue of Optional Systems, Services and Products), as updated from time 
to  time  in  accordance  with  Clause  8.1.3  of  Schedule  B  (Conditions  of  Contract).  
This Clause 8 below sets out the pricing for the Optional Services under the following 
headings: 
(a) 
pricing for EIU Services in England, Wales and Scotland – as per Clause 8.2 
below;  
(b) 
pricing for the Livescan Services in Scotland – as identified at the Effective 
Date (i.e. Scottish Livescan Services that are part of the Core Services) – as 
per Clause 8.3 below; 
(c) 
pricing  for  Livescan  Services  in  England,  Wales  and  Scotland  –  after  the 
Effective Date – as per Clause 8.4 below;  
(d) 
pricing  for  other  Optional  Services  available  from  the  Catalogue,  where 
prices are updated on an annual basis;  
(i) 
Optional  Products  and  Services  –  see  out  in  the  table  in  Annex  E-8 
(Catalogue of Optional Systems, Services and Products); 
(ii) 
pricing for Training Services; and 
(iii) 
pricing for Engineering Services.  
8.1.3  The Contractor shall charge for COSSP Items at the rates detailed in this Clause only 
if the Authority or the Police Forces place an order using the Ordering Procedures of 
Schedule U (Ordering Procedure) and, if applicable, enter into a contract with the 
Police Forces in accordance with Schedule R (Livescan and EIUs). 
8.1.4  Agreement of Service Charges for the Optional Services as part of this Contract does 
not  imply  any  exclusivity  of  arrangements  with  the  Contractor  for  the  provision  of 
Livescan services.  
8.2 
Pricing for EIU Services in England Wales and Scotland 
As  described  in  Clause  8.2.1  of  Schedule  B  (Conditions  of  Contract),  as  at  the  Effective 
Date, save for the Livescan Services, the Parties have not identified any other category of EIU 
Services.    However,  if  other  EIU  Services  (i.e.  other  than  Livescan  Services)  are  identified 
during the Term, the Parties shall agree the pricing for such EIU Services in accordance with 
Schedule L (Change Control Procedures). 
Schedule E (Pricing) 
15 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
8.3 
Pricing for the Livescan Services in Scotland – as at the Effective Date 
The pricing for the Livescan Services identified for Scotland as at the Effective Date is set out 
in Clause 4.2 above. 
8.4 
Pricing for Livescan Services in England, Wales and Scotland – after the Effective Date 
8.4.1  The Service Charges apply set out in this Clause for provision by the Contractor of 
fully  maintained  and  supported  Livescan  Units  for  England,  Wales  and  Scotland, 
according to the number of installed Units under new Livescan contracts entered into 
under Schedule R (Livescan and EIUs).  The reduced Service Charge (as set out in 
the table below) shall apply to all Livescan Units supplied under such new Livescan 
contracts  from  the  month  following  the  month  under  which  the  discount  threshold 
was  reached,  i.e.  if  one  Livescan  Unit  was  in  service  in  January  and  fifty  Livescan 
Units are in service by April, then all units from May onwards shall be supplied at the 
Service Charge applicable for fifty Livescan Units (as shown in the table below).  For 
determining the number of Livescan Units installed, the current 41 Livescan units in 
Scotland shall be included in the calculation.  For illustration: if the Met Police Force 
(with  53  Livescan  Units)  changes  to  the  new  Livescan  Contracts  on  the  Effective 
Date,  then  the  total  number  of  installed  Livescan  Units  would  be  94  (53  plus  41 
Livescan Scotland).  Therefore, the “Fifty Units” row applies – the Monthly Service 
Charge will be £1,840. 
8.4.2  Save for Service Credits due in respect of the Scottish Livescan Services (i.e. Scottish 
Livescan  Services  that  are  part  of  the  Core  Services)  as  specified  in  Clause  4.2.1 
above, the Monthly Baseline Charges per Livescan Unit (as set out in the table in this 
Clause  8.4.2)  for  England,  Wales  and  Scotland  will  be  adjusted  based  on  the 
Operational  Service  Score,  as  such  score  is  calculated  in  accordance  with  Part  3  of 
Schedule F (Service Level Requirements).  Service Credits shall be deducted from 
the Monthly Baseline Charges in order to calculate the Actual Monthly Charges for 
Livescan Services for England, Wales and Scotland.  Service Credits will be applied 
on  a  quarterly  basis  to  the  relevant  monthly  Invoice.    The  Monthly  Service  Credit 
shall be calculated in accordance with the following formula: 
(a) 
100% Score - Operational Service Score for Livescan % = A% 
(b) 
A%  X  relevant  Monthly  Baseline  Charge  (such  relevant  Monthly  Baseline 
Charge shall be determined by the table below in this Clause 8.4.2) = Actual 
Monthly Charge   
Livescan Service 
Monthly Baseline 
Total Annual 
Charge (£ per unit) 
Baseline Charge (£ 
per unit) 
One Unit 
1,890 
22,680 
 
Fifty Units 
1,840 
22,080 
 
One Hundred Units 
1,790 
21,480 
 
Two Hundred Units 
1,740 
20,880 
 
Three Hundred Units 
1,690 
20,280 
 
Four Hundred Units 
1,640 
19,680 
 
Schedule E (Pricing) 
16 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
8.5 
Pricing for Other Optional Services 
8.5.1  Optional  Products  and  Services  –  see  out  in  the  table  in  Annex  E-8  (Catalogue  of 
Optional Systems, Services and Products). 
(a) 
The pricing for other Optional Services (i.e. Optional Services excluding EIU 
Services),  is  set  out  in  the  table  at  Annex  E-8  (Catalogue  of  Optional 
Systems, Services and Products).   
(b) 
Subject  to  the  agreement  of  the  Authority,  the  mechanism  for  updating  the 
Service  Charges  in  Annex  E-8  (Catalogue  of  Optional  Systems,  Services 
and Products) each year, over the Term, is for the Contractor to update the 
tables each year, to take effect from 1 April, with the then extant technology 
options and price and incorporate them into the Catalogue in accordance with 
Schedule L (Change Control Procedure).    
(c) 
The Service Charges for managed service contracts entered into are set out in 
the table at Clause 8.5.3 below.  
(d) 
The Contractor shall invoice the Police Forces for the Optional items in the 
table  at  Annex  E-8  (Catalogue  of  Optional  Systems,  Services  and 
Products) at the frequency agreed in accordance with Schedule U (Ordering 
Procedures).  
8.5.2  Pricing for Training Services 
(a) 
Core  training  requirements  have  been  specified  as  part  of  Schedule  D 
(Detailed  Operational  Requirements)  and  the  Monthly  Baseline  Charges 
include any charge associated with providing such training requirements.  For 
specific training courses not forming part of the core training requirement, the 
price  for  such  training  courses  will  be  based  on  the  following  indicative 
prices  and  agreed  in  accordance  with  Schedule  L  (Change  Control 
Procedure): 
(i) 
2  Day  new  Livescan  Training  Course  -£3,400  (per  course  at  a 
Bureaux for 8-10 people);  
(ii) 
1  Day  Ten  Print  Processing  Course    -  £1,400  (per  course  at  a 
Bureaux for 4 people); and  
(iii) 
2 Hour MIS/Audit Course - £550 (per course at a Bureaux for 8-10 
people). 
8.5.3  Engineering Service Rates:   
(a) 
The  table  of  labour  rates  in  this  Clause  8.5.3,  with  regard  to  personnel 
providing New Services or other additional services, shall apply until the first 
anniversary  date  of  TOR  NAFIS,  depending  on  whether  such  staff  are  UK-
based  or  US-based.    Such  labour  rates,  as  adjusted  annually  in  accordance 
with  the  indexation  adjustment  below,  shall  also  apply  to  the  provision  of 
Termination  Assistance  after  the  Service  Transfer  Date  to  a  Successor 
Contractor,  as  detailed  in  Clause  7.3  of  Schedule  N  (Exit  Strategy)  and 
IDENT1 systems development and implementation consultancy.  The labour 
rates shall be subject to an indexation adjustment to be applied on an annual 
basis  with  effect  from  1  April  each  year,  starting  from  1  April  2006.    The 
Schedule E (Pricing) 
17 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
selected  index  is  RPIX  which  is  the  “All  Items  Retail  Price  Index  (RPI)” 
excluding  mortgage  interest  payments,  which  is  produced  by  National 
Statistics.  Table  RP07  from  National  Statistics  shall be  used to  provide the 
percentage  change  in  inflation  over  the  preceding  12  months  period.    For 
updating  labour  rates  in  March,  to  take  effect  from  1  April,  the  figures 
available from National Statistics will represent the percentage increase in the 
12 months to January of that year. 
(b) 
These  labour  rates  in  this  Clause  8.5.3  are  exclusive  of  any  travel  and 
subsistence  associated  with  working  at  or  visiting  the  Authority’s  premises.  
Travel  and  subsistence  expenses  incurred  in  working  at  or  visiting  the 
Authority’s  premises,  in  the  delivery  of  the  New  Services/Other  Optional 
Services/Termination Assistance (after the Transfer Date), shall be agreed in 
advance  with  the  Authority.    Such  labour  rates  may  be  charged  to  the 
Authority  together  with  an  uplift  of  10%  to  allow  for  the  Contractor’s 
administrative  costs  incurred  in  processing,  tracking  and  monitoring  the 
costs.  The percentage uplift will also apply to Other Direct Costs (“ODCs”) 
incurred  in  delivering  New  Services/Other  Optional  Services/Termination 
Assistance (after the Transfer Date), including the examples of typical ODCs 
provided below: 
(i) 
travel (both local and long distance) - all are actual charges unless it 
is US travel;  
(ii) 
airfare;  
(iii) 
mileage (local travel);  
(iv) 
mileage (to and from airport);  
(v) 
meal  expenses  (actuals  for  international/US  Govt  per  diem  rates  for 
US travel); 
(vi) 
lodging  (actual  for  international/US  Govt  per  diem  rates  for  US 
travel); 
(vii) 
laundry/linens  (actual  for  international/US  Govt  per  diem  rates  for 
US travel); 
(viii)  transportation  (e.g.  train  fares,  car  hires,  taxis,  tube,  auto  rental, 
parking);  
(ix) 
fuel or mileage allowance;  
(x) 
currency conversion fees;  
(xi) 
American Express Advance Fees and Cash Machine Fees;  
(xii) 
telephone/fax; and  
(xiii)  reproduction Costs. 
Schedule E (Pricing) 
18 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
Role Description 
Hourly 
Hourly Labour Rate 
Labour Rate  - 
– US Staff (£) 
UK Staff (£) 
Junior Technician/ Junior Operations Specialist 
£39.40 
£47.15 
Technician/Junior Engineer/Operations Specialist 
£46.52 
£51.53 
Senior 
Technician/Engineer/Senior 
Operations 
£57.32 
£61.69 
Specialist 
Master 
Technician/Lead 
Engineer/Operations 
£72.48 
£73.65 
Manager 
Consulting Engineer/Senior Operations Manager 
£77.92 
£87.73 
Engineering Manager/Product Manager 
£97.31 
£112.24 
Senior  Consulting  Engineer/Project  Planning 
£108.52 
£122.95 
Manager 
Senior Engineering/Senior Product Manager 
£119.20 
£137.02 
 
(c) 
In  the  event  that  the  Authority  commits  to  the  provision  of  New 
Services/other additional services/Termination Assistance (after the Transfer 
Date) for labour in accordance with Clause 8.5.3(a) above, the hourly labour 
rates  shall  be  discounted,  at  the  time  the  commitment  is  entered  into, 
according to the discounts in the following table: 
Level  of  Commitment  by  the 
Discount Applied 
Authority 
Over £500,000 
1.0% 
Over £1,000,000 
2.0% 
Over £2,000,000 
3.0% 
 
(d) 
On  1  May  each  year,  the  Authority  and  the  Contractor  shall  agree  an 
additional  annual  discount based  on the  total  amount of  New  Services/other 
additional  services/Termination  Assistance  (after  the  Transfer  Date)  for 
labour  committed  (and  in  the  case  of  any  CCNs  with  a  limit  of  liability, 
actual services for labour invoiced) in the year preceding 1 April to 31 March 
in  accordance  with the table  under  Clause  8.5.3(e)  below.    These  additional 
discounts shall normally be payable by the Contractor in the form of a credit 
note, unless otherwise agreed between the Authority and the Contractor. 
(e) 
Further  annual  discount  shall  apply  to  the  labour  rates  from  1  April  to  31 
March,  calculated  on  the  total  amount  of    New  Services/other  additional 
services/Termination  Assistance  (after  the  Transfer  Date)  for  labour 
committed to in the year by the Authority, according to the discounts in the 
following table: 
Level  of  Commitment  by  the 
Discount Applied 
Authority 
Over £100,000 
0.5% 
Over £500,000 
2.0% 
Over £1,000,000 
3.0% 
Over £2,000,000 
4.0% 
Over £3,000,000 
6.0% 
Over £4,000,000 
8.0% 
Over £5,000,000 
10.0% 
Schedule E (Pricing) 
19 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
 
(f) 
Personnel  provided  by  the  Contractor  to  supply  New  Services/other 
additional  services/Termination  Assistance  (after  the  Transfer  Date)  for 
labour shall have the skills and experience as defined in the role definitions 
contained in Annex E-2 (Role Definitions). 

VALUE FOR MONEY 
In order that the Contractor can demonstrate ongoing value for money for the Authority over 
the  Terms  of  the  Contract,  the  Contractor  shall  adopt  the  procedures  set  out  in  Annex  E-6 
(Value for Money Mechanisms), which shall be in accordance with Clause 15.16 Schedule 
B (Conditions of Contract) and Schedule L (Change Control Procedures).  
10 
CONTRACT EXTENSION 
As detailed in Clause 5 of Schedule B (Conditions of Contract), the Authority has the option 
to extend the initial term of the Contract.  Indicative Monthly Baseline Charges for England, 
Wales and Scotland, (including Livescan Services for Scotland only) that would apply under 
an extension to the Contract are contained in Annex E-5 (Indicative Charges for Contract 
Extension).    The  final  price  for  any  extension  period  shall  take  into  account  the  indicative 
service charges in Annex E-5 (Indicative Service Charges for Contract Extension) for any 
changes  made  to  the  Monthly  Baseline  Charges  under  this  Schedule  during  the  Term  and 
shall  be  subject  to  the  Value  for  Money  Mechanism.    All  prices  for  extensions  shall  be 
mutually  agreed  between  the  Parties  in  accordance  with  Schedule  L  (Change  Control 
Procedures) and Clause 9 above. 
11 
INSURANCE 
11.1 
The  Contractor  shall  provide  the  following  insurance  cover  in  respect  of  providing  the 
Services under the Contract: 
11.1.1  employer’s liability insurance with a minimum annual cover of £5 million pounds for 
any one claim on a claim occurring basis; 
11.1.2  professional  indemnity  insurance  with  a  minimum  cover  of  £10  million  pounds  for 
any one claim on a claims occurring basis; and  
11.1.3  third party public and products liability not less than £25 million pounds. 
11.2 
The  Contractor  confirms  and  agrees  that  the  insurance  cover  set  out  in  this  Clause  11  is 
included in the Monthly Baseline Charges identified above. 
 
Schedule E (Pricing) 
20 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
ANNEX E-1 
 
NOT USED 
 
Schedule E (Pricing) 
21 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
RESTRICTED - COMMERCIAL 
ANNEX E-2 
 
ROLE DEFINITIONS 

INTRODUCTION 
This  Annex  provides  details  of  the  skills  and  grades  required  of  personnel  provided  by  the 
Contractor  for  New  Services/Other  Optional  Services/Termination  Assistance  (after  the 
Transfer Date) for labour. 

GENERAL REQUIREMENTS 
Personnel supplied by the Contractor for New Services/Other Optional Services/Termination 
Assistance (after the Transfer Date) shall possess the following basic general competencies: 
2.1 
a high level of initiative and commitment; 
2.2 
good interpersonal and communication skills, both written and verbal; 
2.3 
sound knowledge of their relevant discipline; 
2.4 
broad understanding of current IS/IT developments and issues; and 
2.5 
experience of using relevant methods. 

PERSONNEL FOR ADDITIONAL SERVICES 
Personnel  supplied  by  the  Contractor  shall  possess  the  appropriate  skills,  knowledge  and 
qualifications according to their grade, according to the following tables. 
 
Schedule E (Pricing) 
22 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
US BASED - LABOUR CATEGORY DESCRIPTIONS 
Option # 
Junior 
Master 
Technician/ 
Senior Technician/ 
Consulting 
Senior Consulting 
Senior 
Senior 
Labour 
Technician/ 
Technician/Lead 
Junior Engineer/ 
Engineer/Senior 
Engineer/Senior 
Engineer / 
Engineer/Project 
Engineering/ 
Category 
Junior 
Engineer/ 
Operations 
Operations 
Operations 
Engineering 
Planning 
Senior Product 
Operations 
Operations 
Specialist 
Specialist 
Manager 
Manager 
Manager 
Manager 
Specialist 
Manager 
Minimum 
General knowledge 
Knowledge of 
Full knowledge of 
Broad understanding of 
Complete understanding 
In-depth knowledge of 
Comprehensive 
Develops and 
Knowledge, 
of fundamental 
fundamental 
fundamental 
engineering/scientific 
of engineering/scientific 
engineering/scientific 
knowledge of 
applies highly 
Skills, and 
engineering/scientific 
engineering/scientific 
engineering/scientific 
principles, concepts and 
principles, concepts and 
principles, concepts and 
engineering/scientific 
advanced 
Abilities 
principles, concepts, 
principles, concepts 
principles, concepts and 
techniques. Able to 
techniques gained 
techniques gained 
principles, concepts 
engineering/scienti
and techniques 
and techniques. 
techniques appropriate to 
communicate 
through extensive study 
through extensive study 
and techniques. 
fic principles, 
primarily obtained 
Knowledge of 
job family. Full 
effectively with 
and experience. Able to 
and experience. Able to 
Capable of managing 
concepts and 
from college 
applicable analytical or 
knowledge of applicable 
customers and clearly 
communicate 
communicate 
one or more large 
techniques. 
coursework, limited 
field methods and 
analytical or field 
present technical 
effectively with 
effectively and clearly 
programs and solving 
Capable of 
on-the-job training 
procedures. Strong 
methods and procedures. 
approaches and 
customers and clearly 
present technical 
complex problems. 
managing one or 
and/or formal 
problem solving and 
Strong problem solving 
findings. Demonstrates 
present technical 
approaches and 
Able to communicate 
more large 
training programs. 
communication skills. 
and communication 
skill and ability to 
approaches and 
findings. Able to 
effectively at the 
programs and 
Demonstrates the 
Demonstrates the skill 
skills. Demonstrates the 
perform complex 
findings. Demonstrates 
implement 
highest levels. Acts as 
solving complex 
skill and ability to 
and ability to perform 
skill and ability to 
engineering/scientific 
the skill and ability to 
engineering/scientific 
a consultant to 
problems. 
perform basic 
moderately complex 
perform moderately 
tasks including research, 
perform complex 
plans within a project. 
customers. Considered 
Demonstrates 
professional 
professional 
complex professional 
analysis and design. 
engineering/scientific 
Capable of 
an expert in field. 
understanding of 
engineering/scientific 
engineering/scientific 
engineering/scientific 
tasks and develop 
administering and/or 
Demonstrates the skill 
other technical 
tasks. 
tasks. 
tasks independently. 
innovative solutions.  
managing multiple 
and ability to analyse, 
disciplines within 
activities. Able to 
design, and develop 
the project. Able to 
consult effectively with 
innovative solutions to 
communicate at 
customers. 
complex 
the highest levels. 
Demonstrates the skill 
engineering/scientific 
Widely recognised 
and ability to develop 
problems. 
expert in field. 
innovative solutions to 
Demonstrates the 
complex 
skill and ability to 
engineering/scientific 
analyse strategic 
problems. 
engineering/ 
scientific issues 
and solve complex 
problems. 
Schedule E (Pricing) 
23 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
Option # 
Junior 
Master 
Technician/ 
Senior Technician/ 
Consulting 
Senior Consulting 
Senior 
Senior 
Labour 
Technician/ 
Technician/Lead 
Junior Engineer/ 
Engineer/Senior 
Engineer/Senior 
Engineer / 
Engineer/Project 
Engineering/ 
Category 
Junior 
Engineer/ 
Operations 
Operations 
Operations 
Engineering 
Planning 
Senior Product 
Operations 
Operations 
Specialist 
Specialist 
Manager 
Manager 
Manager 
Manager 
Specialist 
Manager 
Examples of 
Under direct 
Under general 
Performs moderately 
Works independently on 
Performs complex 
Performs highly 
Independently 
Independently 
Work 
supervision of a more 
supervision, performs 
complex assignments as 
moderately complex 
engineering/scientific 
complex 
performs critical tasks 
performs strategic 
senior staff member, 
moderately complex 
part of a project team. 
engineering/scientific 
tasks. Recommends 
engineering/scientific 
of a high degree of 
engineering/scientific 
performs entry level 
assignments as part of 
May design, develop, 
and design tasks. 
approaches for new or 
analysis. Designs 
complexity. Performs 
tasks critical to the 
engineering/scientific 
a project team. May 
modify, and evaluate 
Performs entire analysis 
improved processes. 
systems applications. 
independent research 
long-term success of 
tasks, such as basic 
perform 
multiple parts of an 
for assigned 
Performs entire analysis 
Creates new methods 
and analysis. Develops 
the unit/group. 
analysis, testing, 
engineering/scientific 
engineering system. May 
engineering/scientific 
for assigned 
and implements changes 
and presents white 
Performs 
preparation of reports 
design tasks, develop 
perform aspects of 
problems. May plan and 
engineering/scientific 
to procedures. Consults 
papers in solving 
independent research 
and documents, and 
test plans, run tests, or 
investigations and/or 
perform specialised 
problems. May lead 
with senior customers 
major customer 
and analysis. 
prototyping. May 
evaluate products or 
analysis at the site level. 
experiments, studies, 
specialised experiments, 
and attends planning 
technical problems. 
Develops and 
assist in the 
devices. May 
May assist in planning 
and analysis. Interfaces 
studies, and analysis. 
meetings. Reviews 
Provides guidance on 
presents white papers 
performance and 
document the results 
and performing 
with the customer to 
Interfaces with the 
progress with 
development of 
in solving major 
preparation of 
of design tasks. May 
specialised experiments, 
determine needs and 
customer to determine 
management and 
policies and 
customer technical 
investigations. May 
perform aspects of 
studies, and analysis. 
communicate progress. 
needs and communicate 
manages complex 
procedures. Sets new 
problems. Develops 
review technical 
investigations and/or 
Assists senior level staff 
May lead certain aspects 
progress. Stays abreast 
projects within budget 
standards and 
new policies, 
literature and reports, 
analysis at the 
on special projects.  
of a task or project. 
of technical documents 
and schedule. Stays 
procedures. Evaluates 
standards, and 
participate in field 
project/program level. 
Provides training and 
and reports. Assists in 
abreast of technical 
vendor and 
procedures. Publishes 
investigations and 
May conduct research, 
mentoring to more 
business development or 
documents and reports. 
subcontractor 
technical literature 
characterisations, or 
perform field 
junior staff members. 
proposal efforts. May 
Identifies new 
capability. Stays 
and reviews and 
evaluate and 
investigations and 
lead certain aspects of a 
requirements and 
abreast of technical 
presents at technical 
assemble technical 
experiments, and 
task or project. Provides 
business development 
literature and reviews 
conferences. 
data. May perform 
characterisations or 
training and mentoring 
opportunities. Provides 
technical documents 
Responsible for 
laboratory 
evaluate and assemble 
to more junior staff 
leadership in proposal 
and reports. 
conveying 
experiments and tests 
technical data. Shows 
members. 
and marketing efforts. 
Establishes new leads 
knowledge and 
according to standard 
ingenuity in 
Provides training, 
and follow-on tasking. 
expertise to more 
procedures. Assists 
recommendations of 
mentoring and guidance 
Leads substantial 
junior staff. Leads 
more senior staff in 
how to proceed in 
to more junior staff 
proposal and 
substantial proposal 
moderately complex 
solving 
members. Develops and 
marketing initiatives. 
and marketing 
design and problem-
engineering/scientific 
may lead medium to 
Provides training, 
initiatives. Develops 
solving projects. 
systems problems. 
large projects including 
mentoring and 
and leads large sized 
Technician work is 
defining scope, 
guidance to more 
projects including 
not more than 20% of 
objectives and methods. 
junior staff members. 
defining scope, 
the job. 
Develops and may 
objectives, and 
lead large sized 
methods. 
projects including 
defining scope, 
objectives, and 
methods. 
Schedule E (Pricing) 
24 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
Option # 
Junior 
Master 
Technician/ 
Senior Technician/ 
Consulting 
Senior Consulting 
Senior 
Senior 
Labour 
Technician/ 
Technician/Lead 
Junior Engineer/ 
Engineer/Senior 
Engineer/Senior 
Engineer / 
Engineer/Project 
Engineering/ 
Category 
Junior 
Engineer/ 
Operations 
Operations 
Operations 
Engineering 
Planning 
Senior Product 
Operations 
Operations 
Specialist 
Specialist 
Manager 
Manager 
Manager 
Manager 
Specialist 
Manager 
Freedom to 
Works on entry-level 
Works under general 
Performs moderately 
Most assignments are 
Most assignments are 
Substantial latitude for 
Considerable latitude 
Considerable latitude 
Act 
professional 
supervision and 
complex tasks within 
complex and performed 
complex and performed 
independent judgement. 
for independent 
for independent 
assignments within 
guidance. 
established procedures. 
independently with little 
independently with little 
Resolves complex 
judgement. Resolves 
judgement. Analyses 
established 
Independently 
Independent judgement 
instruction. Works 
instruction. Works with 
problems that arise with 
and provides guidance 
and provides 
parameters and 
organises own work to 
and ingenuity are used. 
within established 
broad objectives and has 
little or no guidance. 
on complex problems. 
guidance on complex 
guidelines. 
meet established 
When situations fall out 
policies. When 
the latitude to determine 
Interprets requirements 
Interprets broad 
strategic issues. 
objectives. 
of guidelines, assistance 
situations fall out of 
the best way to 
and develops and 
customer requirements 
Interprets broad 
is gained from 
guidelines, assistance is 
accomplish tasks. 
executes work plans to 
and develops and 
strategic 
management or more 
gained from 
satisfy them. 
executes plans for 
requirements and 
senior staff members. 
management or more 
project team to satisfy 
develops and 
senior staff members. 
them. 
executes plans for 
division or group to 
satisfy them. 
Impact of 
Impact of work is 
Impact of work is 
Impact of work is limited 
Impact of decisions is 
Work will typically 
Significant impact on 
Major impact on 
Major impact on 
Work 
usually limited to the 
usually limited to the 
to the project/program or 
significant to 
involve carrying out a 
organisational 
organisational success 
organisational 
project team which is 
project team which is 
organisational unit which 
projects/programs or 
range of assignments 
productivity. Errors in 
and productivity. 
success and 
directly supported 
directly supported 
is directly supported. 
organisational unit. May 
directly affecting an 
judgement could cause 
Errors in judgement 
productivity. Impact 
and/or the function 
and/or the function 
impact short-term 
organisation’s results. 
serious problems, 
could cause serious 
of key decisions have 
being performed. 
being performed. 
performance. 
Errors in judgement 
including the customer’s 
problems, including 
far-reaching effect on 
could cause problems 
losing faith in our 
the loss of business or 
the strategic future of 
with customer 
technical ability. 
revenue. 
the unit/group. 
satisfaction. 
Interfaces 
Primary contact with 
Primary contact is with 
Primary contact is inter-
Frequent inter-
Interacts with senior 
Serves as consultant to 
Serves as organisation 
Serves as consultant 
immediate supervisor 
others in work unit. 
organisational with some 
organisational and 
staff and customers on 
specialised projects or 
consultant and 
to top management in 
and others in the 
Limited formal contact 
outside customer contact. 
outside customer 
significant matters often 
programs. Acts as an 
spokesperson on 
long-range planning. 
direct work unit. 
with customer. May 
May develop and deliver 
contacts. May develop 
requiring co-ordination 
advisor to senior 
specialised projects or 
Primary 
make presentations to 
presentations. 
and deliver 
between organisations. 
management and 
programs. Acts as 
spokesperson to 
small groups. 
presentations. 
Represents the 
customers. 
advisor to top 
customer on 
organisation through 
management and 
company capabilities 
individual contact and 
customers. 
and future efforts. 
formal presentations. 
Typical 
Bachelors degree in a 
Bachelors degree in a 
Bachelors degree in a 
Bachelors degree in a 
Bachelors degree in a 
Bachelors degree in a 
Bachelors degree in a 
Bachelors degree in a 
Minimum 
technical field and 0 
technical field and at 
technical field and at least 
technical field and at 
technical field and at 
technical field and at 
technical field and at 
technical field and at 
Education 
– 2 years experience. 
least 2 - 4 years 
4 - 6 years experience. 
least 6 - 8 years 
least 8 - 11 years 
least 11 - 14 years 
least 14 - 18 years 
least 18 years 
and 
experience. 
experience. 
experience. 
experience. 
experience. 
experience. 
Experience 
 
Schedule E (Pricing) 
25 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
UK BASED LABOUR CATEGORY DESCRIPTIONS 
 
Option # 
Junior 
Senior 
Master 
Technician/Junior 
Consulting 
Senior Consulting 
Senior 
Senior 
Labour 
Technician/Junior 
Technician/Engineer/S
Technician/Lead 
Engineer/Operations 
Engineer/Senior 
Engineer / Engineering 
Engineer/Project 
Engineering/Senior 
Category 
Operations 
enior Operations 
Engineer/Operation
Specialist 
Operations Manager 
Manager 
Planning Manager 
Product Manager 
Specialist 
Specialist 
s Manager 
Minimum 
Applies basic and 
Applies advanced 
Full knowledge of 
Broad understanding 
Complete understanding 
In-depth knowledge of 
Comprehensive 
Develops and applies 
Knowledge, 
some advanced skills 
skills in area of 
fundamental 
of engineering/ 
of engineering/scientific 
engineering/scientific 
knowledge of 
highly advanced 
Skills, and 
in procedures, 
specialisation. Adapts 
engineering/scientific 
scientific principles, 
principles, concepts and 
principles, concepts and 
engineering/scientific 
engineering/scientific 
Abilities 
techniques, tools, 
procedures, 
principles, concepts and 
concepts and 
techniques gained 
techniques gained through 
principles, concepts 
principles, concepts 
materials, and/or 
techniques, tools, 
techniques appropriate 
techniques. Able to 
through extensive study 
extensive study and 
and techniques. 
and techniques. 
equipment 
materials, and/or 
to job family. Full 
communicate 
and experience. Able to 
experience. Able to 
Capable of managing 
Capable of managing 
appropriate to area of 
equipment to meet 
knowledge of 
effectively with 
communicate 
communicate effectively 
one or more large 
one or more large 
specialisation.  
special needs.  
applicable analytical or 
customers and 
effectively with 
and clearly present 
programs and solving 
programs and solving 
Able to follow 
Good communication 
field methods and 
clearly present 
customers and clearly 
technical approaches and 
complex problems. 
complex problems. 
written instructions 
skills  
procedures. Strong 
technical approaches 
present technical 
findings. Able to 
Able to communicate 
Demonstrates 
and procedures and 
Have a ‘can do’ 
problem solving. 
and findings. 
approaches and 
implement 
effectively at the 
understanding of 
easily 
attitude 
Demonstrates the skill 
Demonstrates skill 
findings. Demonstrates 
engineering/scientific 
highest levels. Acts 
other technical 
Good 
Team Player 
and ability to perform 
and ability to 
the skill and ability to 
plans within a project. 
as a consultant to 
disciplines within the 
communication skills  
moderately complex 
perform complex 
perform complex 
Capable of administering 
customers. 
project. Able to 
Have a ‘can do’ 
professional 
engineering/scientific 
engineering/scientific 
and/or managing multiple 
Considered an expert 
communicate at the 
attitude 
engineering/scientific 
tasks including 
tasks and develop 
activities. Able to consult 
in field. 
highest levels. 
Team player 
tasks independently. 
research, analysis 
innovative solutions.  
effectively with customers. 
Demonstrates the 
Widely recognised 
Good communication 
and design. 
Have understanding of 
Demonstrates the skill and 
skill and ability to 
expert in field. 
skills, able to 
Good 
ITIL and other industry 
ability to develop 
analyse, design, and 
Demonstrates the 
demonstrate technical 
communication 
standards. 
innovative solutions to 
develop innovative 
skill and ability to 
understanding  
skills, able to present 
To have a good 
complex 
solutions to complex 
analyse strategic 
Have a ‘can do’ attitude 
ideas and show 
understanding of the 
engineering/scientific 
engineering/scientific 
engineering/scientific 
Team Player 
understanding in 
environment in which 
problems. 
problems. 
issues and solve 
front of an audience  
they operate 
Have understanding of 
Have understanding 
complex problems. 
Ability to identify 
Ability to identify 
ITIL and other industry 
of ITIL and other 
Have understanding 
benefits to the 
benefits to the business 
standards. 
industry standards. 
of ITIL and other 
business. 
both financial and 
Have a extremely good 
Have a ‘can do’ 
industry standards. 
Have a ‘can do’ 
technical. 
understanding of the 
attitude 
Have a ‘can do’ 
attitude 
To be able to make 
environment in which they 
Team Player  
attitude 
Team Player 
decisions, with little or 
operate 
no guidance.  
Ability to identify benefits 
Have a ‘can do’ attitude 
to the business both 
Team Player 
financial and technical. 
Ability to identify benefits 
to the business. 
To be able to make 
decisions, with little or no 
guidance. 
Have a ‘can do’ attitude 
Team player 
Schedule E (Pricing) 
26 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
Option # 
Junior 
Senior 
Master 
Technician/Junior 
Consulting 
Senior Consulting 
Senior 
Senior 
Labour 
Technician/Junior 
Technician/Engineer/S
Technician/Lead 
Engineer/Operations 
Engineer/Senior 
Engineer / Engineering 
Engineer/Project 
Engineering/Senior 
Category 
Operations 
enior Operations 
Engineer/Operation
Specialist 
Operations Manager 
Manager 
Planning Manager 
Product Manager 
Specialist 
Specialist 
s Manager 
Examples of 
Duties and tasks are 
Duties and tasks are 
Performs moderately 
Works independently 
Performs complex 
Performs highly complex 
Independently 
Independently 
Work 
varied but 
varied and complex. 
complex assignments as 
on moderately 
engineering/scientific 
engineering/scientific 
performs critical 
performs strategic 
standardised. 
Serves as a resource 
part of a project team. 
complex 
tasks. Recommends 
analysis. Designs systems 
tasks of a high 
engineering/scientific 
Performs some more 
to others in the 
May design, develop, 
engineering/scientific 
approaches for new or 
applications. Creates new 
degree of 
tasks critical to the 
advanced functions. 
resolution of 
modify, and evaluate 
and design tasks. 
improved processes. 
methods and implements 
complexity. Performs 
long-term success of 
Resolves routine 
problems and issues. 
multiple parts of an 
Performs entire 
Performs entire analysis 
changes to procedures. 
independent research 
the unit/group. 
questions and 
Assisting in the 
engineering system. 
analysis for assigned 
for assigned 
Consults with senior 
and analysis. 
Performs 
problems, and refers 
escalated problems 
May perform aspects of 
engineering/scientific 
engineering/scientific 
customers and attends 
Develops and 
independent research 
more complex 
and solutions  
investigations and/or 
problems. May plan 
problems. May lead 
planning meetings. 
presents white papers 
and analysis. 
questions to higher 
analysis at the site level. 
and perform 
specialised experiments, 
Reviews progress with 
in solving major 
Develops and 
levels, knowing 
May assist in planning 
specialised 
studies, and analysis. 
management and manages 
customer technical 
presents white papers 
when to escalate.  
and performing 
experiments, studies, 
Interfaces with the 
complex projects within 
problems. Provides 
in solving major 
specialised experiments, 
and analysis. 
customer to determine 
budget and schedule. Stays 
guidance on 
customer technical 
studies, and analysis. 
Interfaces with the 
needs and communicate 
abreast of technical 
development of 
problems. Develops 
Assists senior level staff 
customer to 
progress. Stays abreast 
documents and reports. 
policies and 
new policies, 
on special projects.  
determine needs and 
of technical documents 
Identifies new 
procedures. Sets new 
standards, and 
communicate 
and reports. Assists in 
requirements and business 
standards and 
procedures. 
progress. May lead 
business development 
development opportunities. 
procedures. 
Publishes technical 
certain aspects of a 
or proposal efforts. May 
Provides leadership in 
Evaluates vendor and 
literature and reviews 
task or project. 
lead certain aspects of a 
proposal and marketing 
subcontractor 
and presents at 
Provides training and 
task or project. Provides 
efforts. Provides training, 
capability. Stays 
technical 
mentoring to more 
training and mentoring 
mentoring and guidance to 
abreast of technical 
conferences. 
junior staff members. 
to more junior staff 
more junior staff members. 
literature and reviews 
Responsible for 
members. 
Develops and may lead 
technical documents 
conveying 
 
medium to large projects 
and reports. 
knowledge and 
May take responsibility 
including defining scope, 
Establishes new 
expertise to more 
in the leading of Staff 
objectives and methods. 
leads and follow-on 
junior staff. Leads 
 
tasking. Leads 
substantial proposal 
May have team leadership 
substantial proposal 
and marketing 
responsibility 
and marketing 
initiatives. Develops 
 
initiatives. Provides 
and leads large sized 
training, mentoring 
projects including 
and guidance to more 
defining scope, 
junior staff members. 
objectives, and 
Develops and may 
methods. 
lead large sized 
 
projects including 
May have project 
defining scope, 
ownership, including 
objectives, and 
financial  
methods. 
 
May have project 
ownership 
Freedom to 
Works on entry-level 
Works on entry-level 
Performs moderately 
Most assignments are 
Most assignments are 
Substantial latitude for 
Considerable latitude 
Considerable latitude 
Schedule E (Pricing) 
27 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
Option # 
Junior 
Senior 
Master 
Technician/Junior 
Consulting 
Senior Consulting 
Senior 
Senior 
Labour 
Technician/Junior 
Technician/Engineer/S
Technician/Lead 
Engineer/Operations 
Engineer/Senior 
Engineer / Engineering 
Engineer/Project 
Engineering/Senior 
Category 
Operations 
enior Operations 
Engineer/Operation
Specialist 
Operations Manager 
Manager 
Planning Manager 
Product Manager 
Specialist 
Specialist 
s Manager 
Act 
professional 
professional 
complex tasks within 
complex and 
complex and performed 
independent judgement. 
for independent 
for independent 
assignments within 
assignments within 
established procedures. 
performed 
independently with little 
Resolves complex 
judgement. Resolves 
judgement. Analyses 
established 
established 
Independent judgement 
independently with 
instruction. Works with 
problems that arise with 
and provides 
and provides 
parameters and 
parameters and 
and ingenuity are used. 
little instruction. 
broad objectives and 
little or no guidance. 
guidance on complex 
guidance on complex 
guidelines 
guidelines 
When situations fall out 
Works within 
has the latitude to 
Interprets requirements 
problems. Interprets 
strategic issues. 
of guidelines, assistance 
established policies. 
determine the best way 
and develops and executes 
broad customer 
Interprets broad 
is gained from 
When situations fall 
to accomplish tasks. 
work plans to satisfy them. 
requirements and 
strategic 
management or more 
out of guidelines, 
develops and 
requirements and 
senior staff members. 
assistance is gained 
executes plans for 
develops and 
from management or 
project team to 
executes plans for 
more senior staff 
satisfy them. 
division or group to 
members. 
satisfy them. 
Impact of 
Impact of work is 
Impact of work is 
Impact of work is 
Impact of decisions 
Work will typically 
Significant impact on 
Major impact on 
Major impact on 
Work 
usually limited to the 
usually limited to the 
limited to the 
is significant to 
involve carrying out a 
organisational 
organisational 
organisational 
project team which is 
project team which is 
project/program or 
projects/programs or 
range of assignments 
productivity. Errors in 
success and 
success and 
directly supported 
directly supported 
organisational unit 
organisational unit. 
directly affecting an 
judgement could cause 
productivity. Errors 
productivity. Impact 
and/or the function 
and/or the function 
which is directly 
May impact short-
organisation’s results. 
serious problems, 
in judgement could 
of key decisions have 
performed.  
performed. 
supported. 
term performance. 
Errors in judgement 
including the customer’s 
cause serious 
far-reaching effect on 
could cause problems 
losing faith in our 
problems, including 
the strategic future of 
with customer 
technical ability. 
the loss of business 
the unit/group. 
satisfaction. 
or revenue. 
Interfaces 
Primary contact with 
Primary contact with 
Primary contact is inter-
Frequent inter-
Interacts with senior 
Serves as consultant to 
Serves as 
Serves as consultant 
immediate supervisor 
immediate supervisor 
organisational with 
organisational and 
staff and customers on 
specialised projects or 
organisation 
to top management in 
and others in the 
and others in the 
some outside customer 
outside customer 
significant matters often 
programs. Acts as an 
consultant and 
long-range planning. 
direct work unit.  
direct work unit. 
contact. May develop 
contacts. May 
requiring co-ordination 
advisor to senior 
spokesperson on 
Primary 
and deliver 
develop and deliver 
between organisations. 
management and 
specialised projects 
spokesperson to 
presentations. 
presentations. 
Represents the 
customers. 
or programs. Acts as 
customer on 
organisation through 
advisor to top 
company capabilities 
individual contact and 
management and 
and future efforts. 
formal presentations. 
customers. 
Typical 
GCSE/ GNVQ 
A-Level / Advance 
HND and 3+ years 
Bachelor’s Degree or 
Bachelor’s Degree or 
Bachelor’s Degree or 
Bachelor’s Degree or 
Bachelor’s Degree or 
Minimum 
GNVQ 
experince 
industry 
industry qualifications 
industry qualifications 
industry 
industry 
Education 
qualifications with 
with 8 + years 
with 10 + years experience 
qualifications 15+ 
qualifications 15+ 
and 
5+ years experience. 
experience 
years experience 
years experience 
Experience 
 
Schedule E (Pricing) 
28 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
ANNEX E-3 
 
ADDITION OF A BUREAUX OR REMOVAL OF A BUREAUX OR POLICE FORCE 

INTRODUCTION 
1.1 
This  Annex  describes  the  approach  to  be  used  for  calculating  the  adjustment  to  the 
Monthly Baseline Charges in the event of the addition or removal of a Bureaux or the 
removal of a Police Force.  
1.2 
In this Annex, the Wiltshire Bureaux has been chosen for the purposes of providing 
various examples of the effect on the Service Charges due to the addition or removal 
of a Bureaux or Police Force. 

ADDITION OF A BUREAUX OR REMOVAL OF A BUREAUX OR POLICE FORCE 
- EXAMPLE 
2.1 
The Wiltshire Bureaux has been selected as the representative Bureaux on which to 
base the calculation and the change in each case can be assumed to take place at FOC.  
For  the  purpose  of  this  example,  it  is  assumed  that  the  addition  or  reduction  of  a 
Bureaux  does  not  have  an  impact  on  the  central  design  capacity  and  its  associated 
costs. 
2.2 
The  Monthly  Baseline  Charges  could  change  over  time  in  several  ways,  including 
through  increasing  or  reducing  the  number  of  existing  Bureau  used  to  provide  the 
Services  at  the  Effective  Date.  The  Contractor  confirms  that  the  Monthly  Baseline 
Charges include recovery of the design and build component of the IDENT1 system 
as well as the recurring operation and maintenance costs.  
2.3 
If  agreed  by  the  Parties,  changes  to  the  IDENT1  system  can  be  charged  in  one  of 
three (3) ways: 
2.3.1  the  value  of  the  change  can  be  summarised  in  a  CCN  and  paid  as  a  single 
sum, or as a series of milestone payments; 
2.3.2  the total value of the change can be financed across the remaining operations 
months  and  the  result  added  to  or  subtracted  from  the  then-current  Monthly 
Baseline Charges; or 
2.3.3  the value of the change can be split between Clauses 2.3.1 and 2.3.2 above, 
with  part  of  the  CCN  paid  as  the  work  is  completed  and  the  remainder 
divided between the remaining months of Services. This charging method is 
illustrated  in  the  tables  at  Clause  3  and  4  below.    The  Parties  acknowledge 
that  any  of  these  three  (3) charging  methods  could  be  applied  to  any  of  the 
example changes shown below in this Annex. 

IMPACT OF AN INCREASE IN BUREAU NUMBER (WILTSHIRE) - EXAMPLE 
3.1 
The  following  representative  example  in  this  Clause  3  is  for  the  addition  of  a  new 
Bureaux (Wiltshire). This example shows how Service Charges can be reflected as a 
combination of fixed and monthly payments. 
3.2 
The impact on the Monthly Service Charges for a change in the number of Bureau is 
based on the following particulars of this example: 
Schedule E (Pricing) 
29 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
3.2.1  The Wiltshire Bureaux is added after the completion of FOC, with 75 months 
of IDENT1 service remaining.  
3.2.2  The Wiltshire Bureaux to be added falls within the size Tier 3 Category.  
3.2.3  In this case there is no need to change the volumetric at Central; i.e. the new 
Bureaux  load  will  be  subtracted  from  the  surplus  capacity  paid  for  by  the 
Authority  and  available  to  other  Bureau  such  that  the  total  IDENT1  design 
capacity does not change. 
3.3 
The  following  steps  demonstrate  how  the  change  would  be  implemented  and  the 
Monthly Service Charges adjusted: 
3.3.1  The Authority requests the Contractor’s support in adding a new Bureaux. 
3.3.2  The Contractor performs site survey of the Tier 3 Bureaux site. 
3.3.3  The Contractor develops an equipment list describing the hardware/software 
suite,  the  communications  requirements,  the  Operations  and  Support 
requirements,  Help  Desk  support  requirements  and  provides  this  data  to the 
Authority in the form of a CCN. 
3.3.4  Upon  submittal  of  the  CCN,  the  Contractor  and  the  Authority  may,  for 
example, agree that the "value" for this effort is £300,000. 
3.3.5  The  CCN  reflects  the  distribution  of  one-off  (Bureaux  equipment  and 
installation),  central  (storage,  matching,  DBMS  and  server  capacity),  and 
recurring  (O&M,  including  communications)  charges  for  the  Bureau  Tier 
within  which  the  new  Bureaux  falls.  The  Parties  acknowledge  that  the 
approximate  allocation  of  these  costs  is  35%  fixed,  40%  central,  and  25% 
recurring.    The  Parties  agree  to  consider  if  there  are  special  circumstances 
that  need  to  be  taken  into  account  when  making  such  allocations.  This 
example  has  its  own  special  circumstances    -  there  is  no  increase  to  the 
central  matching  capacity,  and  therefore,,  the  CCN  process  provides  the 
Authority  with  the  opportunity  to  save  money  by  not  paying  for  something 
that is not needed.  
3.3.6  In  this  example  of  adding  a  new  Bureaux,  the  total  cost  of  £300,000  is 
comprised  of  two  (2)  components:  a  one-off  component  of  £175,000  and  a 
recurring  component  of  £125,000.  For  purposes  of  this  example,  the 
£175,000  is  considered  a  CCN  Milestone  payment  associated  with  the 
installation of the Bureaux equipment and Bureaux “Go-Live”. The recurring 
O&M costs totalling £125,000 is added to the total Monthly Baseline Charges 
remaining  on  the  system,  and  this  total  is  then  reallocated  among  all  of  the 
Bureau  in  accordance  with  Schedule  L  (Change  Control  Procedure).  The 
Contractor shall ensure that this process insures that Bureau in the same Tier 
continue  to  pay  the  same  monthly  Service  Charges.    The  Parties  agree  that 
financing  charges  shall  not  apply  in  this  case  because  the  one-off  charges 
were paid when the one-off charges were incurred, and the Monthly Baseline 
Charges  (subject  to  any  adjustments  in  accordance  with  this  Schedule)  are 
paid in the same month as when charges are incurred. 
3.3.7  The following table illustrates the effect on Monthly Baseline Charges when 
the new Bureaux is added.  The per-Bureaux Baseline Monthly Charges for 
this  example are reduced because,  by  adding  the  new  Bureaux,  it  is  sharing 
Schedule E (Pricing) 
30 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
part  of  the  charges  for  the  central  system.  For  example,  the  old  Tier  3 
Monthly Baseline Charge was £9,625 and the new Monthly Baseline Charge 
for  this example is  £9,473,  a reduction of £152 per month.  The table below 
also  shows  that  when  the  new  Monthly  Baseline  Charges  for  each  Tier  are 
multiplied  by  the  number  of  Bureau  in  each  Tier,  and  these  results  are 
totalled,  the  total  Monthly  Baseline  Charges  for  the  system  as  a  whole  are 
increased from £1,268,540 to £1,270,207 (an increase of £1,667 per month). 
This is consistent with the £125,000 of recurring charges being spread across 
the remaining 75 months of the Contract Term (£1,667 x 75 = £125,000). 
 Monthly Services Charges 
New Monthly Services Charges 
Current Total 
Bureau Tiering 
Current 
New 
New Total 
Quantity 
(Size) 
Total 
Monthly 
Total 
Monthly 
Monthly 
Monthly 
Quantity 
Services 
Quantity 
Services 
Services 
Services 
Charges 
Charges 
Charges 
Charges 
Bureau Tier 1 

1,496  
5,986  

1,332  
5,330  
Bureau Tier 2 

2,993  
26,937  

2,831  
25,479  
Bureau Tier 3 
10 
9,625  
96,255  
11 
9,473  
104,200  
Bureau Tier 4 
15 
14,127  
211,904  
15 
13,980  
209,707  
Bureau Tier 5 
12 
28,254  
339,047  
12 
28,127  
337,525  
Bureau Tier 6 

49,923  
249,616  

49,827  
249,133  
Bureau Tier 7  

68,540  
68,540  

68,469  
68,469  
Bureau Tier 8 

198,915  
198,915  

199,025  
199,025  
71,340 
71,340 
71,340 (based 
71,340 (based 
(based on 
(based on 
Scotland Livescan 
  
on 41 Livescan 
 
on 41 Livescan 
41 Livescan 
41 Livescan 
Units). 
Units). 
Units) 
Units). 
Total 
57 
 
£1,268,540  
58 
 
£1,270,207. 
 

IMPACT OF A REDUCTION IN BUREAU NUMBERS (WILTSHIRE) - EXAMPLE 
4.1 
The following representative example in this Clause 4 below is for the reduction of an 
existing  Bureaux  (Wiltshire).    The  method  would  also  apply  to  removal  of  a  Police 
Force, which will consist of a number of Bureau. 
4.2 
The impact on the Monthly Baseline Charges in relation to a change in the number of 
Bureau is based on the following particulars of this example: 
4.2.1  The  Wiltshire  Bureaux  is  removed  after  the  completion  of  FOC,  with  75 
months of IDENT1 service remaining.  
4.2.2  The Wiltshire Bureaux to be removed falls within the size Tier 3 category.  
4.2.3  In this example of reducing the number of Bureau, there is no need to change 
the  volumetric  at  Central; i.e. the  removed  Bureaux  load  will  be considered 
surplus  capacity  included  in  the  Monthly  Baseline  Charges  for  by  the 
Authority  and  available  to  other  Bureau  such  that  the  total  IDENT1  design 
capacity does not change. 
4.3 
The  following  steps  demonstrate  how  the  change  would  be  implemented  and  the 
Monthly Baseline Charges adjusted: 
4.3.1  The  Authority  requests  the  Contractor’s  support  in  removing  the  Wiltshire 
Bureaux. 
Schedule E (Pricing) 
31 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
4.3.2  The  Contractor  would  develop  a  CCN  to  document  the  changes  and 
reductions for the Authority. 
4.3.3  As  described  in  Clause  3.3.5  above,  the  charges  of  the  Monthly  Baseline 
Charge  for  each  Bureaux  reflects  the  distribution  of  one-off  (Bureaux 
equipment  and  installation),  central  (storage,  matching,  DBMS  and  server 
capacity),  and  recurring  (O&M,  including  communications)  charges  for  the 
Tier  within  which  the  new  Bureaux  falls.  The  Parties  acknowledge  that  the 
approximate  allocation  of  these  costs  is  35%  fixed,  40%  central,  and  25% 
recurring.  The  CCN  process  provides  the  Authority  with  the  opportunity  to 
save money by identifying excess capacity and providing full transparency of 
the charges to assist the Authority in reallocating the capacity and  Bureaux 
equipment to other Bureau. 
4.3.4  In this example of reducing the number of Bureau, the total cost of £125,000 
is  comprised  of  two  (2)  components:  a  one-off  component  of  £25,000  to 
implement  the  required  change  (for  example:  removal  and  redistribution  of 
equipment)  and  a  reduction  of  the  recurring  component  of  £100,000.  For 
example:  the  recurring  component  would  include  the  reduction  of  the 
remaining  communication  charges  less  early  termination  penalties.    The 
example also assumes that the equipment would be relocated, and therefore, 
that  hardware  maintenance  would  continue  to  be  required).  The  recurring 
O&M  charges  totalling  £100,000  is  removed  from  the  Monthly  Baseline 
Charges, and the new Monthly Baseline Charges are then reallocated among 
all  of  the  Bureau  in  accordance  with  Schedule  L  (Change  Control 
Procedure). This process insures that Bureau in the same Tier continue to be 
charged the same Monthly Baseline Charges. 
4.4 
The  following  table  illustrates  the  effect  on  Monthly  Baseline  Charges  when  a 
Bureaux  is  removed.    The  per-Bureaux  monthly  charges  for  this  example  are 
increased because the then-existing Bureau are sharing a larger part of the charges of 
the central system.  For example, the old Bureau Tier 3 Monthly Baseline Charge was 
£9,625 and the new monthly charge for this example is £9,693, a increase of £68 per 
month.  The table in this Clause 4.4, also shows that when the new Monthly Baseline 
Charges for each Tier are multiplied by the number of Bureau in each Tier, and these 
results are totalled, the total Monthly Baseline Charges for the system as a whole are 
decreased  from  £1,268,540  to  £1,267,207  a  decrease  of  £1,333  per  month.  This  is 
consistent  with  the  £100,000  of  recurring  charges  being  removed  across  the 
remaining 75 months of the Contract (£1,333 x 75 = £100,000). 
Monthly Baseline Charges 
New Monthly Baseline Charges 
Current 
Bureau Tiering 
Current 
Total 
New 
New Total 
(Size) 
Total 
Monthly 
Quantity 
Total 
Monthly 
Monthly 
Quantity 
Baseline 
Monthly 
Quantity 
Baseline 
Baseline  
Charges 
Baseline 
Charges 
Charges 
Charges 
Bureau Tier 1 

1,496  
5,986  

1,507  
6,028  
Bureau Tier 2 

2,993  
26,937  

3,014  
27,125  
Bureau Tier 3 
10 
9,625  
96,255  

9,693  
87,234  
Bureau Tier 4 
15 
14,127  
211,904  
15 
14,226  
213,384  
Bureau Tier 5 
12 
28,254  
339,047  
12 
28,451  
341,414  
Bureau Tier 6 

49,923  
249,616  

50,272  
251,359  
Bureau Tier 7  

68,540  
68,540  

69,018  
69,018  
Bureau Tier 8 

198,915  
198,915  

200,304  
200,304  
Schedule E (Pricing) 
32 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
71,340 
71,340 (based 
71,340 
71,340 (based 
(based on 41 
on 41 
(based on 
Scotland Livescan 
 
 
on 41 Livescan 
Livescan 
Livescan 
41 Livescan 
Units) 
Units) 
Units) 
Units) 
Total 
57 
 
£ 1,268,540  
56 
 
£1,267,207 
 
 
Schedule E (Pricing) 
33 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
ANNEX E-4 
 
IMPACT OF POTENTIAL FUTURE VOLUME CHANGES 

INTRODUCTION 
1.1 
This  Annex  describes  the  indicative  Service  Charges  that  would  apply  to  volume 
changes that assume an increase over the volume levels contained in the DOR.  The 
scenarios are described below. 
1.2 
The  following  tables  show  the  indicative  Monthly  Baseline  Charges  for  England, 
Wales, and Scotland, for increasing the volumetrics in three different scenarios at two 
potential  decision  points  (a  total  of  six  (6)  indicative  Monthly  Baseline  Charges, 
reflecting six (6) different combinations of scenario and timing).  

GENERAL PRINCIPLES 
2.1 
The  tables  below  show  indicative  Service  Charges  for  future  changes  to  the 
transaction  volumes  on  the  IDENT1  system  that  have  been  based  on  the  following 
assumptions.  The  assumptions  in  this  Annex  define  the  incremental  charges  for 
adding central matching capacity. The resultant indicative Monthly Baseline Charges 
is  the  sum  of  the  original  Monthly  Baseline  Charges,  plus  the  new  incremental 
addition,  amortised  over  the  remaining  Term  of  the  Contract.  While  the  financial 
model  allows  for  entries  through  2015  (the  11th  year of  the  Contract),  the financial 
model consistently uses the remaining months on an 8-year Contract as the basis for 
amortisation.  Accordingly,  with  extensions  that  lengthen  this  period,  the  indicative 
Monthly Baseline Charges may be lower.  
2.2 
Each  of  the  three  (3)  scenarios  in  this  Annex  represents  a  "volume  band"  that  is  a 
growth curve over time. That means changing from one volume band to another (e.g. 
from  the  base  case  to  the  25%  scenario)  which  represents  not  just  an  immediate 
change in capacity, but a continuing obligation to add future capacity to the IDENT1 
system  to  stay  ahead  of  the  growth  curve  for  the  new  volume  band.  The  Parties 
acknowledge  that  moving  from  one  volume  band  to  another  involves  both  an 
immediate  purchase  of  more  matching  power  and  future  purchases.  As  both  the 
immediate  and  future  purchases  can  be  determined  based  on  the  new  volume  band 
requirements,  the  total  charge  (both  immediate  and  future)  can  be  calculated  and 
amortised over the remaining Term of the Contract, starting with the initial month of 
change. 
2.3 
In the table in this Annex, two (2) representative points in time have been selected to 
provide  examples  of  purchases  of  additional  matching  power:  at  FOC  (December 
2006)  and  at  FOC  +  3  years  (December  2009).  The  Parties  acknowledge  that,  in 
practice, capacity planning and purchasing is more of a year-to-year process, but for 
the  purposes  of  this  example,  picking  two  discrete  points  in  time  simplifies  this 
example of how the indicative  Monthly Baseline Charges are impacted.  
2.4 
Each table below represents one of the volume band scenarios. For example, the first 
table  shows  the  new  Monthly  Baseline  Charges  for  England,  Wales,  and  Scotland, 
after moving from the standard pricing baseline to a 25% increase in volumetrics. In 
the 25% table example below, the first Monthly Baseline Charges (i.e. £1,289,490 / 
month at FOC in December 2006) represents the new Monthly Baseline Charges, as 
of  December  2006,  to  add  and  maintain  capacity  consistent  with  the  25%  increase 
scenario  for  the  remainder  of  the  Term  of  the  Contract.    In  the  25%  table  example 
below, the second charge £1,298,365 / month) represents the new Monthly Baseline 
Schedule E (Pricing) 
34 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
Charges,  starting  at  FOC  +  3  years  (December  2009)  to  add  and  maintain  capacity 
consistent  with  the  25%  increase  scenario  for  the  remainder  of  the  Term  of  the 
Contract.  The  Parties  acknowledge  that  in  respect  of  the  25%  table  example  below 
this second charge assumes that the system is procured and maintained at the baseline 
volumetrics  (no  increase  over  the  base  DOR  tables)  until  December  2009,  at  which 
time  the  capacity  is  adjusted  upward  to  the  25%  scenario.  While  the  same  end 
capacity  is  achieved,  the  difference  between  this  second  Monthly  Baseline  Charges 
and  the first Monthly  Baseline  Charges  is that  the  additional  equipment  is  procured 
later (at a lower, technology-deflated cost), and there are fewer remaining months in 
the Contract over which to amortise the additional charges (39 months vs 75 months). 
2.5 
The  reference  Monthly  Baseline  Charges  for  the  baseline  scenario  (no  volumetric 
increases  above  DOR  requirements;  England,  Wales,  and  Scotland-including-
Livescan) is £1,268,540. 
25% Increased Volumetric Scenario 
Services Description – England, Wales and Scotland (including 
Monthly Baseline Charges (£) 
Livescan for Scotland only) 
The Services provided at Dec 2006 
£1,289,490 
The Services provided at Dec 2009 
£1,298,365 
50% Increased Volumetric Scenario 
Services Description – England, Wales and Scotland (including 
Monthly Baseline Charges (£) 
Livescan for Scotland only) 
The Services provided at Dec 2006 
£1,304,397 
The Services provided at Dec 2009 
£1,314,964 
100% Increased Volumetric Scenario 
Services Description – England, Wales and Scotland (including 
Monthly Baseline Charges (£) 
Livescan for Scotland only) 
The Services provided at Dec 2006 
£1,334,026 
The Services provided at Dec 2009 
£1,330,857  
 

THE SCENARIOS 
3.1 
The  assumptions  and  key  volumetrics  applied  in  evaluating  the  potential  future 
impact  on  the  Monthly  Services  Charges  of  changes  in  volumetrics,  above  those 
defined in Schedule D (Detailed Operational Requirements) are as follows: 
3.1.1  the distribution of search type is as detailed in Table 2.18 of Annex D-1 of Schedule 
D (Detailed Operational Requirements); 
3.1.2  no  change  in  the  database  size  profile,  as  defined  in  Table  2.7  and  2.10  of 
Annex D-1 of Schedule D (Detailed Operational Requirements); 
3.1.3  performance  is  consistent  with  that  defined  for  delivery  of  the  Services,  as 
detailed in Schedule F (Service Level Requirements); and 
3.1.4  no increase in the numbers of workstations or of EIU equipment. 
3.2 
Volumetrics for print set, case and mark submissions move in line with those defined 
for the increase in search load, as set out in the table below. 
Schedule E (Pricing) 
35 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
 
Schedule E (Pricing) 
36 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
Scenarios: Based on Summary of Searches of Unified Collection 
Defined  in terms  of  the  percentage  increase in  search  load  over the  Upper  Bound  profile  of figures  contained  in Table 2.17  of  Annex  D-1  of  Schedule  D 
(Detailed Operational Requirements): 
Scenario 
2004 
2005 
2006 
2007 
2008 
2009 
2010 
2011 
2012 
2013 
2014 
2015 
Base Case 
630,890 
683,540 
736,190 
788,840 
841,490 
894,140 
946,790 
999,440 
1,052,090 
1,104,740 
1,157,390 
1,210,040 
25% Increase 
788,613 
854,425 
920,238 
986,050 
1,051,863 
1,117,675 
1,183,488 
1,249,300 
1,315,113 
1,380,925 
1,446,738 
1,512,550 
50% Increase 
946,335 
1,025,310 
1,104,285 
1,183,260 
1,262,235 
1,341,210 
1,420,185 
1,499,160 
1,578,135 
1,657,110 
1,736,085 
1,815,060 
100% Increase 
1,261,780 
1,367,080 
1,472,380 
1,577,680 
1,682,980 
1,788,280 
1,893,580 
1,998,880 
2,104,180 
2,209,480 
2,314,780 
2,420,080 
 
Schedule E (Pricing) 
37 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
ANNEX E-5 
 
INDICATIVE SERVICE CHARGES FOR CONTRACT EXTENSION 

INTRODUCTION 
The prices detailed in this Annex are indicative of the charges for an extension to the Contract 
irrespective of the duration of the relevant extension period.  The final price shall be agreed 
between  the  Parties  in  accordance  with  a  number  of  factors  prevailing  at  the  time  in 
accordance with Schedule L (Change Control Procedures), including but not limited to, the 
requirement  for  technology  refreshment  during  the  extension  period,  subcontractor  charges 
and the affect of any extension/duration upon them, and prevailing market conditions.   
Notwithstanding  the  above,  the  indicative  prices  in  this  Annex  shall  act  as  a  guide  against 
which the final price shall be agreed, subject always to Clause 10 of this Schedule.  

INDICATIVE EXTENSION PRICING 
Based on the Service Charges at the Effective Date, the indicative Monthly Baseline Charges 
for an extension are: 
Monthly Baseline 
Service Description 
Charges (£) 
The Services provided for England, Wales and Scotland, (including 
£1,000,000  
Livescan Services for Scotland only) 
 
 
Schedule E (Pricing) 
38 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
ANNEX E-6 
 
VALUE FOR MONEY MECHANISMS 

INTRODUCTION 
1.1 
The  value  for  money  mechanism  described  in  this  Annex  (“Value  for  Money 
Mechanism”)  shall  apply  in  accordance  with  Clause  15.16  of  Schedule  B 
(Conditions of Contract). 
1.2 
This  Annex  sets  out  the  processes  by  which  the  Contractor  will  share  financial 
information with the Authority in relation to requests for New Services, Changes, or 
extension(s) of the Term proposed in accordance with Schedule L (Change Control 
Procedure).  These processes include the Value for Money Mechanisms. 
1.3 
The  Value  for  Money  Mechanism  is  the  primary  mechanism  for  confirming  the 
completeness,  accuracy  and  validity  of  the  Contractor’s  price  arising  from  the 
introduction  of  New  Services,  Changes,  or  extensions  to  the  Term  under  the 
Agreement  and  the  value  for  money  being  delivered  to  the  Authority  in  respect  of 
such New Services, Changes, or extensions to the Term. 
1.4 
As  used  in  this  Schedule,  the  Value  for  Money  Mechanism  shall  only  apply  to 
Changes that impact the then-current Service Charges at the time the relevant Change 
is  requested.    For  Changes  that  do  not  have  an  impact  on  the  then-current  Service 
Charges, the Contractor shall not be under an obligation to comply with the Value for 
Money Mechanism. 
1.5 
Without prejudice to the Authority’s right to Benchmark under Clause 34 of Schedule 
B (Conditions of Contract) and the provisions of Clause 4 below, for the avoidance 
of doubt, the Value for Money Mechanism in this Schedule shall not be used by the 
Parties to re-negotiate any mutually agreed pricing that has already been incorporated 
into the Contract.  

VALUE FOR MONEY - GENERAL 
2.1 
The  Contractor  agrees  to  abide  by  the  principle  of  providing  on-going  Value  for 
Money  to  the  Authority  under  the  Contract  that  is  both  demonstrably  fair  and 
reasonable.  Accordingly,  the  Contractor  shall  provide  to  the  Authority,  as  a 
minimum,  a  breakdown  of  proposed  pricing  information  as  set  out  in  Annex  E-6-A 
(Value for Money Details) for all New Services, Changes, extension(s) of the Term 
and any other requests for additional work, including, but not limited to, those arising 
from Schedule L (Change Control Procedures).   
2.2 
In  addition  to  the  breakdown  provided  in  Clause  2.1  above,  the  Contractor  shall 
provide, where reasonably requested by the Authority, supplementary information to 
that  provided  under  Annex  E-6-A  (Value  for  Money  Details)  of  this  Schedule  to 
demonstrate  to  the  Authority  that  the  pricing  submitted  by  the  Contractor  for  New 
Services,  Changes  and/or  extension(s)  to  the  Term  represents  Value  for  Money  for 
the  Authority.    Such  supplementary  information  shall  include  Relevant  Records 
(pursuant to Schedule J (Access and Inspection of Records)), save that the records 
shall  include  financial  records  for  the  purposes  of  evaluating  Value  for  Money  for 
New  Services,  Changes  and/or  extension(s)  of  the  Term  subject  to  any  third  party 
confidentiality  obligations.    The  records  will  include  Total  Payments  (Price),  Total 
Costs, and Total Inflows.  
Schedule E (Pricing) 
39 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
2.3 
In addition to the information required under Clause 2.2 above, for variations to the 
Contract  where  the  proposed  Monthly  Baseline  Charges  for  the  change  proposal  or 
New  Service  over  the  Term  exceeds  one  million  pounds  (£1,000,000),  the  Major 
Contract  Change  Financial  Model  set  out  in  Annex  E-7  (Major  Contract  Change) 
shall be completed to show the financial impact.   
2.4 
For  the  avoidance  of  doubt,  the  Value  for  Money  Mechanism  described  in  this 
Schedule  is  not  intended  to  represent  “open-book  accounting”  in  respect  of  the 
pricing  for  New  Services,  Changes,  and/or  extensions  to  the  Term  and  is  solely 
intended  to  assist  the  Authority  in  reaching  a  Value  for  Money  conclusion  for  such 
New Services, Changes and/or extension(s) to the Term. 
2.5 
The  Contractor  shall  be  under  a  duty  to  mitigate  all  incurred  costs  as  much  as  is 
reasonably possible, and where appropriate, offer preferential rates to the Authority 
2.6 
For the avoidance of doubt, the provisions of the Value for Money Mechanism shall 
only apply in respect of the Authority and shall not extend to any other Governmental 
agency or department. 

MONITORING THIRD PARTY PRICES FOR CHANGES AND NEW SERVICES  
Where  the  Contractor  proposes  to  use  third  party  products  or  services  in  response  to  a 
requirement from the Authority for a New Service or a Change, the Contractor shall ensure, 
as far as is reasonably practical, that the price obtained and that any service charges proposed 
to  the  Authority,  reflect  best  practice  and  optimum  value  for  money  through  the  following 
arrangements: 
3.1 
where  the  Contractor  identifies  a  need  for  the  provision  of  Software,  Equipment, 
assets or services, the Authority and the Contractor will discuss potential sources of 
supply if appropriate; 
3.2 
where  such  discussions  establish  the  need  for  a  competition  for  the  source  of  such 
supply,  the  Contractor  shall,  as  far  as  is  reasonably  possible,  conduct  such 
competition in accordance with the principles set out in Clause 3 below; and 
3.3 
the objective of each competition will be to obtain the best value for money solution 
which fully meets the requirements of the Authority.  In this context: 
3.3.1  there shall be genuine and open competition wherever possible; 
3.3.2  the extent of such competition shall be in direct proportion to the value and 
subject matter of the procurement; 
3.3.3  any  evaluation  criteria  shall  include  quality,  technical,  corporate  and  cost 
assessments  as  appropriate  in  order  to  establish  the  best  value  for  money 
offering; and 
3.3.4  the  Contractor  shall  not  restrict  technical  or  other  requirements  to  favour 
particular manufacturers or suppliers. 

VALUE FOR MONEY - ON-GOING PERFORMANCE IMPROVEMENT 
4.1 
Without prejudice to Clauses 6 and 10.3 of Schedule B (Conditions of Contract) and 
the  continuous  improvement  mechanism  set  out  in  Schedule  F  (Service  Level 
Requirements), the Authority and the Contractor shall meet annually to review and 
Schedule E (Pricing) 
40 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
discuss  value  for  money  improvements  or  initiatives  relating  to the  provision  of  the 
then-existing  Services.    For  the  avoidance  of  doubt,  the  cost  savings  mechanism 
described  in  Clause  5  below  shall  only  apply  to  good  faith  Value  for  Money  and 
process  initiatives  identified  under  the  provisions  of  the  annual  review  described  in 
this  Clause  4.    Such  cost  savings  mechanism  shall  not  apply  to  New  Services  or 
changes  to  the  Authority’s  requirements  introduced  in  accordance  with  Schedule  L 
(Change Control Procedures).  
4.2 
The  exact  composition  and  attendance  at  the  meetings  shall  be  agreed  between  the 
Parties but the Parties acknowledge that such meetings shall normally contain senior 
commercial  representatives  from  both  Parties.    The  meetings  shall  take  place  at  the 
Authority’s premises (including in Scotland) unless otherwise agreed by the Parties. 
4.3 
The  Contractor  shall,  at  all  times,  give  due  regard  to  any  suggestions  and 
recommendations by the Authority for improving the performance of the Services. 

VALUE FOR MONEY SAVINGS 
5.1 
In  the  event  that  it  is  agreed  by  the  Parties  to  pursue  further  a  suggestion  and/or 
recommendation for improvement of the Services as described in Clause 4 above, the 
Contractor shall prepare a detailed analysis of the nature of the change to the Services 
and the anticipated impact in terms of the following: 
5.1.1  the Services; 
5.1.2  any user perception of performance of the Services; 
5.1.3  the quality;  
5.1.4  the costs savings identified; and 
5.1.5  the basis for calculation of such cost savings in accordance with the Value for 
Money Mechanism described in this Schedule.  
5.2 
The  Parties  shall agree  a  cost  savings  mechanism  for  the  relevant Value for Money 
service  improvement  or  initiatives  agreed  under  this  Clause  5.    Any  cost  savings 
identified by either Party or jointly and agreed between the Parties above and beyond 
the Contractor’s implementation costs shall be shared equally between the Parties in 
accordance with the agreed cost savings mechanism.  
5.3 
Any Changes shall be implemented in accordance with Schedule L (Change Control 
Procedures). 

ATTACHMENT TO CHANGE CONTROL NOTE (CCN)  
6.1 
Annex E-6-A (Value for Money Details) below will be provided by the Contractor 
for review by the Authority as part of the supporting information for a CCN.  Where 
applicable  the  CCN  will  provide  detail  as  to  the  component  costs  for  Scotland,  and 
England and Wales. 
6.2 
The table at Clause (i) of Annex E-6-A (Value for Money Details) is a template for 
the  Contractor  to  use  when  providing  details  of  Value  for  Money  to  the  Authority.  
The  table  at  Clause  (ii)  of  Annex  E-6-A  (Value  for  Money  Details)  is  a  worked 
example to illustrate the level of detail the Contractor shall provide when providing 
Value for Money details to the Authority pursuant to this Annex. 
Schedule E (Pricing) 
41 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
ANNEX E-6-A 
VALUE FOR MONEY DETAILS 
(i) 
Value for Money Details – Template 
 
CCN Name: 
CCN Number: 
CCN Date: 
 
 
 
 
CCN XXX 
 
 
DESCRIPTION 
Capability Summary Benefits: 
 
An executive summary (2-3 paragraphs) describing the overall solution as proposed with specific 
emphasis on the technical approach and how it benefits the overall service provision and the end 
user. 
 
 
 
User Benefits: 
 
A narrative format providing details of the CCN Pricing. 
 
 
 
 
 
PRICING (BASIS OF ESTIMATE) 
 
A  summary  description  of  the  required  hardware  and  software  components  required  to  deliver 
the  proposed  solution  including  the  main  components,  where  they  will  be  installed,  and  a 
technical justification for selecting these components. The actual components will be of equal or 
better  capability.  The  actual  quantities,  configuration,  and  technical  approaches  are  subject  to 
change through the final Design Review. 
CCN XXX 
Total Charge:  [£    ] 
 
This Proposal provides IDENT1 with [           ] 
 
 
HARDWARE, 
SOFTWARE, 
LICENSES 
BILL 
OF  Charge:  [£    ] 
MATERIALS (BOM) 
 
Schedule E (Pricing) 
42 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
Description: 
 
The provision and installation of software [          ] 
 
The provision and installation of hardware [            ]. 
 
Estimate  of  Hardware,  Software,  Licenses  (the  identified  or  equivalent  materials  will  be  provided  as 
required to deliver the proposed solution):  
 
Includes shipping, duty, and insurance 
 
Hardware Component / Description 
Subtotal: [£    ] 
Model # 
Quantity 
 
£ 
 
 
 
£ 
 
 
 
Software Component / Description 
Subtotal:  [£     ] 
Version # 
Quantity 
 
£ 
 
 
 
£ 
 
 
 
£ 
 
 
 
£ 
 
 
 
£ 
 
 
 
License Maintenance / Description 
Subtotal:  [£    ] 
Version # 
Quantity 
 
£ 
 
 
 
£ 
 
 
 
 
 
 
LABOUR: 
Charge:  [£       ] 
A summary description of the required labour hours by the various 
labour categories and the basis of  estimate required to deliver the 
proposed solution. 
Description: 
 
 
Task Activity 
Hours  
Basis of Estimate/Labour Mix 
Design and Documentation 
 
[                     ]  
The labour required for this work is a mix of the following: 
[                ] 
[                ] 
[                ] 
 
Code and Unit Test 
 
[                     ]  
The  labour  required  for  this  work  is  a  mix  of  the 
following: 
[                ] 
[                ] 
[                ] 
 
Integration, Test 
 
[                     ]  
Procedures, Acceptance 
and Regression Tests 
The labour required for this work is a mix of the following: 
[                ] 
[                ] 
[                ] 
 
Schedule E (Pricing) 
43 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
System Administration 
 
[                     ]  
The labour required for this work is a mix of the following: 
[                ] 
[                ] 
[                ] 
 
Training and Operations 
 
[                     ]  
The labour required for this work is a mix of the following: 
[                ] 
[                ] 
[                ] 
 
Management  
Included 
Management  is  allocated  to  cover  each  of  the  above 
above 
categories.    It  provides  for  part  time  monitoring  by  the 
Project Manager and Engineering Director.  Also included 
are the required allocations for configuration management, 
contracts, business, and finance. 
 
Other (as required) 
 
 
 
 
 
Total Hours Proposed 
 
 
 
Other Direct Costs, Travel, and Material Subcontractors 
Charge:  [£       ] 
A summary description of Other Direct Costs required to deliver the 
proposed solution. 
 
Description: 
Other Direct Costs (ODCs) and travel are included in this Proposal.  The subcontractor support includes [ ] 
 
Other Direct Costs 
Approx. %  
Basis of Estimate/Description 
 
[   %] 
 
 
Travel 
Approx. %  
Basis of Estimate/Description 
International Travel 
[   %] 
[    ] trips from Fairfax to London 
Local Travel 
[   %] 
Local UK travel 
 
Material Subcontractors 
Approx. % 
Basis of Estimate/Description 
 
[     %] 
 
 
Total 
100% 
 
 
Other:  (As required) 
Charge:  [£   ] 
 
 
 
 
Total Payments:  [£   ] 
Total Costs: [£   ] 
Total Inflows:  [£   ] 
 
Schedule E (Pricing) 
44 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
(ii) 
Value for Money Details – Example 
 
CCN Name: 
CCN Number: 
CCN Date: 
 
 
 
Extradition Interface Phase 2 
CCN XXX 
 
 
DESCRIPTION 
Capability Summary Benefits: 
 
An executive summary (2-3 paragraphs) describing the overall solution as proposed with specific 
emphasis on the technical approach and how it benefits the overall service provision and the end 
user. 
 
The implementation of  the Extradition Interface capability  will be provided in two phases.  This Phase 2 
Proposal  provides  for  the  completion  of  the  implementation  with  the  remaining  three  of  the  seven 
capabilities of the interface.    The capabilities to be delivered include Print to Mark Search, Submit Mark 
Image for Mark to Print Search, and Export a IDENT1 Mark to the International Law Enforcement Bureau.  
In  addition  this  Proposal  includes  Auditing  of  new  IDENT1  transactions,  ILE  Bureau  User  Training, 
IDENT1 Documentation Change Matrices and, update of IDENT1 external mail services to conform to the 
CJX Code of Connection, Version 2. 
 
User Benefits: 
 
A narrative format providing details of the CCN Pricing.   
 
The  purpose  of  the  Extradition  Interface  is  to  deliver  a  capability  to  electronically  exchange  fingerprint 
images  between  the  National  Criminal  Investigative  Service  (NCIS)  Fugitives  Unit  and  the  National 
Fingerprint  Office  (NFO).  In  addition,  the  IDENT1  Live-Scan  workstations  will  be  modified  to  allow 
captured  fingerprints  to  be  routed  directly  to  the  NFO  for  possible  forwarding  to  the  Fugitives  Unit.  The 
interface  replaces  the  current  manual  process  of  the  Fugitives  Unit  sending  hard  copies  of  fingerprint 
images to the NFO via Post, thus speeding the process and improving the accountability through electronic 
record  keeping.    The  interface  will  improve  the  Fugitives  Unit  ability  to  establish  an  unknown  persons 
identity  and  expedite  arrest  warrant  processing  by  searching  their  fingerprints  against  the  IDENT1 
collection of ten prints. 
 
 
 
PRICING (BASIS OF ESTIMATE) 
 
A  summary  description  of  the  required  hardware  and  software  components  required  to  deliver 
the  proposed  solution  including  the  main  components,  where  they  will  be  installed,  and  a 
technical justification for selecting these components. The actual components will be of equal or 
better  capability.  The  actual  quantities,  configuration,  and  technical  approaches  are  subject  to 
change through the final Design Review. 
CCN XXX 
Total Charge:  £240,000 
 
Schedule E (Pricing) 
45 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
This Proposal provides IDENT1 with the hardware components and software modifications needed for the 
extradition interface, plus operations and maintenance through 30 March 2005.  The Extradition Interface 
capability will be a new IDENT1 software release to be installed at fifty (50) IDENT1 operational sites, 
approximately two hundred (~200) Live-scan sites, and one (1) Fairfax, VA site.  The fifty (50) sites 
include the existing forty-four (44) Bureau, British Transport Police Bureau, Customs and Excise Bureau, 
Hendon, the Secondary site, and the two (2) Training sites. 
 
 
HARDWARE, 
SOFTWARE, 
LICENSES 
BILL 
OF  Charge:  £45,000 
MATERIALS (BOM) 
 
Description: 
 
The provision and installation of software to support anti-virus and attachment filtering at the 
CJX connection.  This upgrade includes the mail server in the Test and Development facility to 
allow pre-release testing of new software as well as compatibility testing of current releases.  The 
commercial anti-virus filter has an annual subscription so that virus profiles will be kept up-to-
date.  Virus profile updates will be accessed via the CJX Internet connection. 
 
The provision and installation of disk hardware to support the increased email traffic on the mail servers 
(Primary and Secondary sites) resulting from the implementation of the Extradition interface. 
Estimate  of  Hardware,  Software,  Licenses  (the  identified  or  equivalent  materials  will  be  provided  as 
required to deliver the proposed solution):  
Includes shipping, duty, and insurance 
 
Hardware Component / Description 
Subtotal:  £4,200 
Model # 
Quantity 
(4 x 1GB DIMM - 4GB Kit) for SunFire 280R  
£3,400 
X7056A 

(2 x 256MB DIMM -512MB Kit) for SunFire 

280R  
£800 
X7053A 
 
Software Component / Description 
Subtotal:  £35,600 
Version # 
Quantity 
MultiSwitch Console GUI tool for Sendmail 
 

Config 
£7,420 
Mail Transfer Agent Sendmal MTA 
£9,750 
 

AIM for Sendmail, eHealth Monitor 
£10,610 
 

Virus Scanner 
£4,290 
 
2,000 
Attachment filter 
£3,530 
 
2,000 
 
License Maintenance / Description 
Subtotal:  £6,200 
Version # 
Quantity 
Sendmail Support for MTA's, 1 year 
£5,820 
 

Support for AIM 
£380 
 

 
 
 
 
LABOUR: 
Charge:  £180,000 
A summary description of the required labour hours by the various 
labour categories and the basis of  estimate required to deliver the 
proposed solution. 
Schedule E (Pricing) 
46 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
Description: 
Design,  develop,  integrate,  test,  and  install  the  Extradition  Interface  software  release,  which  requires  the 
modification  of  ten  (10)  existing  CSCs,  the  addition  of  one  (1)  new  CSC,  and  workflow  and  database 
modifications for both Bureau and Central segments processes. Complete the documentation matrix for the 
SDD, SAD, User Manual, Training Manual, Ops Manual, and System configuration drawings. 
Provide User training. 
Acquire, configure, test, and install COTS hardware and software. 
Provide Help Desk/OSG support. 
Provide management for activities. 
 
Task Activity 
Hours  
Basis of Estimate/Labour Mix 
Design and Documentation 
197 
The  estimate  for  the  design  work  is  based  on  the  agreed 
Concept of Operations, requirements and Interface Control 
Document  (ICD).    The  Design  phase  includes  System 
Engineering and a preliminary design review and a Critical 
Design Review to be presented in the UK.   
The  documentation  estimate  is  based  on  current  actual 
experience  creating  documents  for  the  SDD,  SAD,  User 
Manual,  Training  Manual,  Ops  Manual,  and  System 
configuration  drawings,  and  responding  to  review 
comments by the Authority. 
The labour required for this work is a mix of the following: 
Senior Consulting Engineer 
Consulting Engineer 
Lead Engineer 
 
Code and Unit Test 
1,256 
The  estimate  is  based  on  the  IDENT1  historical  metrics 
for  previous  changes  for  modification  of  ten  existing 
CSC’s and creation of one new CSC.  The design has been 
investigated  down  to  the  CSC  level,  thus  the  complexity 
and  amount  of  code  is  well  understood.    Experienced 
IDENT1  programmers  were  involved  in  the  creation  and 
review of these estimates. 
The  labour  required  for  this  work  is  a  mix  of  the 
following: 
Senior Consulting Engineer 
Consulting Engineer 
Lead Engineer 
 
Schedule E (Pricing) 
47 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
Integration, Test 
341 
Integration 
includes 
allocations 
for 
configuration 
Procedures, Acceptance 
management  of  the  system  software  builds  and  for 
and Regression Tests 
engineering  to  perform  initial  testing  of  the  new 
application running within the IDENT1 system. 
The categories of testing listed here are based on Northrop 
Grumman’s  experience  with  adding  and  testing  new 
functionality  for  over  20  CCNs  delivered  on  IDENT1 
since  TOR.    The  categories  of  testing  included  here  are 
critical  for  new  functionality  being  deployed  in  an 
operational  system.    Northrop  Grumman’s  history  of 
estimation  for  new  capabilities  is  documented  via  past 
years’ PSR charts which show statistics for actual numbers 
of SCRs integrated versus expected numbers.  
The labour required for this work is a mix of the following: 
Senior Consulting Engineer 
Consulting  Test Engineer 
Lead Test Engineer 
 
System Administration 
288 
System  administration  includes  the  installation  and 
configuration  of  new  hardware  and  commercial  software, 
as  well  as  the  system  transition  from  the  current 
configuration  to  the  upgraded  configuration.    Complete 
procedures  and  configuration  drawings  are  produced  to 
accompany the upgrades. 
The labour required for this work is a mix of the following: 
Senior Consulting Engineer 
Lead System Admin 
System Admin 
 
Training and Operations 
273 
The  training  portion  of  this  estimate  includes  the 
development,  copying,  and  distribution  of  the  training 
materials  with  the  production  release.    The  training 
material will be delivered to the NFO Bureaux. 
The operations allocation covers the temporarily increased 
workload  on  the  Help  Desk  and  OSG  that  comes  with 
every  new  capability.    IDENT1  historical  data  shows  that 
once  Users  gain  confidence  with  an  application,  the 
workload returns to normal levels. 
The labour required for this work is a mix of the following: 
Senior Consulting Engineer 
Lead Test Engineer 
Junior Engineer (cm) 
Lead Engineer 
Senior Consulting Engineer 
Senior Product Manager 
 
Management  
inc 
Management  is  allocated  to  cover  each  of  the  above 
categories.    It  provides  for  part  time  monitoring  by  the 
Project Manager and Engineering Director.  Also included 
are the required allocations for configuration management, 
contracts, business, and finance. 
 
Other (as required) 
 
 
 
 
 
Schedule E (Pricing) 
48 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
Total Hours Proposed 
2,755 
 
 
Other Direct Costs, Travel, and Material Subcontractors 
Charge:  £15,000 
A summary description of Other Direct Costs required to deliver the 
proposed solution. 
 
Description: 
Other Direct Costs (ODCs) and travel are included in this Proposal.  The subcontractor support includes the 
installation, configuration, integration, and test of the email anti-virus filtering software and disk hardware 
at the Primary and Secondary Central site. 
 
Other Direct Costs 
Approx. %  
Basis of Estimate/Description 
Reprographics 
0.5% 
800 pages of repro 
 
Travel 
Approx. %  
Basis of Estimate/Description 
International Travel 
80.0% 
eight three-day trips from Fairfax to London and 
two five-day trips from Fairfax to London 
Local Travel 
4.5% 
Local UK travel 
 
Material Subcontractors 
Approx. % 
Basis of Estimate/Description 
Phoenix 
15.0% 
Firm  quote  to  support  includes  the  installation, 
configuration,  integration,  and  test  of  the  email 
anti-virus  filtering  software  and  disk  hardware  at 
the Hendon and the Secondary Central site. 
 
Total 
100% 
 
 
Other:  (As required) 
Charge:  £None 
 
 
 
 
Total Payments:  £240,000 
Total Costs: £200,000 
Total Inflows:  £40,000 
 
Schedule E (Pricing) 
49 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
ANNEX E-7 
 
MAJOR CONTRACT CHANGE 

INTRODUCTION 
Subject to Clause 2 below, the Major Contract Change Financial Model set out in Annex E-7-
A  (Major  Contract  Change  Financial  Model)  shall  be  used  in  demonstrating  the 
Contractor’s delivery of Value for Money to the Authority under the Contract. 

ONGOING VALUE FOR MONEY 
The  Major  Contract  Change  Financial  Model  template  in  Annex  E-7-A  (Major  Contract 
Change  Financial  Model)  shall  only  be  used  if  the  financial  impact  of  major  change 
proposals and/or New Services exceeds £1,000,000.  This Major Contract Change Financial 
Model will contain estimates of the forecast costs projected to be incurred by the Contractor 
in delivering the Services, for review by the Authority as part of its ongoing focus in ensuring 
Value for Money is achieved. 
 
Schedule E (Pricing) 
50 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
ANNEX E-7-A 
 
MAJOR CONTRACT CHANGE FINANCIAL MODEL 
 
 
Schedule E (Pricing) 
51 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
ANNEX E-8 
 
CATALOGUE OF OPTIONAL SYSTEMS, SERVICES AND PRODUCTS  

INTRODUCTION 
1.1 
The  Catalogue  shall  be  maintained  by  the  Contractor  and  contains  a  description  of 
each  optional  system,  service  or  product.    The  Catalogue  shall  be  divided  into  two 
main sections covering the provision of: 
1.1.1  EIU  Services  (including  Livescan  Services)  in  England,  Wales  and  Scotland 
under new  EIU Contracts, where specific pricing arrangements apply; and  
1.1.2  Other  Optional  Services  available  from  the  Catalogue,  where  prices  are 
updated on an annual basis. 
1.2 
For the purposes of this Catalogue, systems, products and services shall be defined as 
follows: 
1.2.1  System  –  an  integrated  set  of  hardware  and  software  which  constitutes  a 
single configuration item; and 
1.2.2  Product  –  a  single  hardware  configuration  item  or  computer  software 
configuration item; 
1.2.3  Service  –  provision  of  suitably  skilled  (ie.  trained  and  experienced)  staff  to 
perform one or more tasks or activities. 
1.3 
Each option set out in the table below shall include all that is required to complete the 
service  and/or  implement  the  system  as  an  integral  part  of  the  IDENT1  business 
solution.   
1.4 
Preparatory  site  work,  such  as  provision  of  suitable  electrical  supplies  for  each 
Optional Service, is to be undertaken by the relevant Bureaux.  This preparatory site 
work must be completed prior to the agreed installation date.   
1.5 
Any downtime required for installation and checkout of an Optional Service will be 
considered  “planned  downtime”  as  defined  in  Schedule  F  (Service  Level 
Requirements). 
1.6 
The  Contractor retains title  and risk  of loss  of  all items  ordered  from  the  Catalogue 
unless otherwise agreed by the Parties. 

DESCRIPTIONS  OF  INDIVIDUAL  SYSTEMS,  PRODUCTS  AND  SERVICES, 
AVAILABLE AS OTHER OPTIONAL SERVICES, ARE AS FOLLOWS. 
2.1 
Systems 
2.1.1  Electronic Identification Units (EIU) 
1. 
Livescan:  Description provided in Schedule R (Livescan and EIUs) 
2. 
Other Electronic Identification Units (EIU):  Description provided in 
Schedule R (Livescan and EIUs) 
2.2 
Products and Services 
Schedule E (Pricing) 
52 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
2.2.1  Optional Products and Services 
Option and Hardware 
Software 
Implementation 
Monthly Service 
Total Annual 
Charge (£) 
Service Charge (£) 
Barcode Printer 
IDENT1 
shipping, 
£33 
£395 
functional 
installation, 
Application and 
engineering, 
associated COTS 
maintenance, 
Products 
system integration, 
test and 
operational service 
support 
Barcode Reader - 
IDENT1 
shipping, 
£6 
£67 
Quickscan 6000 or 
functional 
installation, 
better 
Application and 
engineering, 
associated COTS 
maintenance, 
Products 
system integration, 
test and 
operational service 
support 
Graphics Printer - 
IDENT1 
shipping, 
£36 
£427 
Lexmark Laser 752DN 
functional 
installation, 
or better 
Application and 
engineering, 
associated COTS 
maintenance, 
Products 
system integration, 
test and 
operational service 
support 
Livescan to Custody 
IDENT1 Livescan 
shipping, 
One-Off Charge 
Interface 
functional 
installation, 
£9,000 
Application and 
engineering, 
associated COTS 
maintenance, 
Products 
system integration, 
test and 
operational service 
support 
Livescan Disk Mirror 
IDENT1 Livescan 
shipping, 
£24 
£288 
Option 
functional 
installation, 
Application and 
engineering, 
associated COTS 
maintenance, 
Products 
system integration, 
test and 
operational service 
support 
Legacy Livescan Pilot 
Legacy Livescan 
shipping, 
£2,792 
£33,504 
Service Agreement 
functional 
installation, 
Application and 
engineering, 
associated COTS 
maintenance, 
Products 
system integration, 
test and 
operational service 
support 
Schedule E (Pricing) 
53 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
Option and Hardware 
Software 
Implementation 
Monthly Service 
Total Annual 
Charge (£) 
Service Charge (£) 
Mark Scanner - Epson 
IDENT1 
shipping, 
£52 
£627 
1680 PRO or better, 
functional 
installation, 
equipment 
Application and 
engineering, 
associated COTS 
maintenance, 
Products 
system integration, 
test and 
operational service 
support 
Monitor - Samsung 21" 
IDENT1 
shipping, 
£12 
£145 
Flat Panel Display (post  functional 
installation, 
bureau site survey) 
Application and 
engineering, 
associated COTS 
maintenance, 
Products 
system integration, 
test and 
operational service 
support 
Monitor - Samsung 21" 
IDENT1 
shipping, 
Nil 
Flat Panel Display (no 
functional 
installation, 
later than bureau site 
Application and 
engineering, 
Note:  A one-off charge of £785 with no 
survey) 
associated COTS 
maintenance, 
additional monthly charge applies if the 
 
Products 
system integration,  monitor upgrade is selected no later 
test and 
than IDENT1 Bureau site survey.  For 
operational service  upgrades selected after the IDENT1 
support 
Bureau site survey has been undertaken 
the monthly charge stated in the “post 
site survey” option above applies. 
Tenprint Scanner - 
IDENT1 
shipping, 
£1,143 
£13,716 
Improvision IS520 or 
functional 
installation, 
better, equipment 
Application and 
engineering, 
associated COTS 
maintenance, 
Products 
system integration, 
test and 
operational service 
support 
Text Printer - HP Laser 
IDENT1 
shipping, 
£34 
£407 
Jet HP4300DTN or 
functional 
installation, 
better 
Application and 
engineering, 
associated COTS 
maintenance, 
Products 
system integration, 
test and 
operational service 
support 
Workstation - Optiplex 
IDENT1 
shipping, 
£59 
£712 
GX270 or better, 
functional 
installation, 
 
equipment 
Application and 
engineering, 
associated COTS 
maintenance, 
Products 
system integration, 
test and 
operational service 
support 
 
 
 
 
 
Schedule E (Pricing) 
54 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
 
2.2.2  The  following  future  Optional  Products  and  Services  will  be  provided  and  priced 
through Schedule L (Change Control Procedure): 
Optional Product or Service 
One Off 
Monthly 
Total Annual 
 
Service Charge 
Service Charge 
Service Charge 
(£) 
(£) 
(£) 
1000 DPI Ten Print Archive. 
TBD 
TBD 
TBD 
This option includes 1,000dpi optics for ten print 
scanning, an increase in Bureaux storage to 
temporarily hold 1000dpi images prior to upload, 
communications bandwidth to upload 1000dpi lossy 
compressed images to the central sites, and tape 
archive storage for the 1000dpi ten prints. 
Additional Operational Response Database 
TBD 
TBD 
TBD 
Capacity. 
The  Additional  Operational  Response  Database 
(ORD)  consists  of  one  or  more  operational  events 
subject to the database limitation of a total of 13,600 
ten  prints  and  3,000  marks  for  all  events  at  each 
Bureau. This option provides Additional Operational 
Response  Database  (ORD)  Capacity  in  the  event 
they are required. 
Additional Police Elimination Database Capacity. 
TBD 
TBD 
TBD 
When  a  police  officer  joins  the  police  service  he  is 
required  to  provide  his  fingerprints,  as  a  tenprint 
record,  for  elimination  purposes  at  crime  scenes. 
This same tenprint is stored for the entire service of 
the officer. This tenprint record is stored in a separate 
database  within  the  IDENT1  system  known  as  the 
Police  Elimination  Database.  This  option  provides 
Additional Police Eliminations Database Capacity at 
any Bureau. 
Additional Training Courses. 
TBD 
TBD 
TBD 
This option provides training courses both within the 
pure fingerprint environment and other more general 
office  and  business  process  training.  The  training 
will  be  delivered  on-site  or  at  a  locally  agreed 
location  as  required  or  completely  away  from  the 
normal  working  environment  at  a  Contractor  site. 
Examples of training courses include:  
•  Tenprint  Technician  (An  introduction  to 
IDENT1  followed  by  hands  on  training  that 
concentrates  on  Tenprint  capture,  demographics 
and close out) 
•  Tenprint  processing  (Training  covering  all 
processes in the Tenprint workflow) 
•  Mark Case Management (Training addressing all 
processes  in  the  Mark  Case  workflow  with  a 
section  devoted  to  the  effective  marking  up  of 
Scene of Crime marks) 
•  Remedy (A course to enable your staff to use the 
Remedy application to submit trouble calls to the 
Help Desk and to monitor the progress of trouble 
Schedule E (Pricing) 
55 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
Optional Product or Service 
One Off 
Monthly 
Total Annual 
 
Service Charge 
Service Charge 
Service Charge 
(£) 
(£) 
(£) 
tickets) 
•  Prepare  Evidence  (A  short  course  to  introduce 
the  software  application  for  preparing  evidence 
for presentation in court) 
•  Mark  Encoding  (A  short  session  covering  the 
most  effective  way  to  encode  scene  of  crime 
marks ensuring the best results from IDENT1) 
•  Applix Data (The use of Applix data to produce 
statistics and reports from IDENT1) 
•  MIS  /  Audit  (How  to  use  the  Management 
Information  System  and  audit  report  facilities 
within IDENT1) 
•  Best  Practice  (A  workshop  to  look  at  best 
practice  throughout  IDENT1  and  those  Force 
operational  procedures  that  are  supported  by 
IDENT1) 
•  Livescan  Best  Practice  -  Quality  Prints 
(workshop  designed  to  focus  exclusively  on 
using  the  correct  techniques  for  getting  the  best 
fingerprints  from  Livescan  reducing  the  chance 
of spurious minutiae) 
•  Livescan  Management  (Training  to  address  all 
processes for managing an effective unit)  
•  Livescan  Best  Practice  (A  workshop  to  look  at 
best  practice  throughout  Livescan  including 
interaction  with  IDENT1,  Interfaces,  HCI, 
looking  at  local  force  policies,  providing  flow-
charts/posters) 
•  Other  training  courses  can  be  provided  to 
bureaux  and  forces  within  the  complete  office 
and  normal  business  process,  including  such 
areas  as  time  management,  telephone  skills, 
customer  care,  presentation  skills  (useful  for 
court appearances).  
Civil Background Check Capability. 
TBD 
TBD 
TBD 
This  option  provides  the  capability  for  civil 
background checks and civil applications. 
Desk Top Management. 
TBD 
TBD 
TBD 
This option provides configuration validation, 
management, and control of non-IDENT1 software 
running on IDENT1 equipment to ensure full 
compatibility and no performance impact.  
Face Recognition. 
TBD 
TBD 
TBD 
This option provides for the inclusion of face 
recognition into IDENT1 as an interface to an 
external face recognition system or the inclusion of 
face recognition as a capability in IDENT1. 
IRIS Recognition. 
TBD 
TBD 
TBD 
This option provides for the inclusion of IRIS 
recognition into IDENT1 as an interface to an 
external IRIS recognition system or the inclusion of 
Schedule E (Pricing) 
56 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL 
 

PITO 
IDENT1 CONTRACT 
Northrop Grumman 
 
RESTRICTED - COMMERCIAL 
Optional Product or Service 
One Off 
Monthly 
Total Annual 
 
Service Charge 
Service Charge 
Service Charge 
(£) 
(£) 
(£) 
IRIS recognition as a capability in IDENT1. 
Livescan 2.  
TBD 
TBD 
TBD 
This option provides the LS2 Check Portable ID 
check scanner.  
Livescan Alternative Supplier. 
TBD 
TBD 
TBD 
This option is for future potential Livescan suppliers.  
Livescan Lite.  
TBD 
TBD 
TBD 
This option provides the LITE U scanner that allows 
capture of rolled and flat single fingers, as well as 
four flat fingers together or two thumbs together. The 
upper and lower palm as well as the writer’s palm 
can also be scanned. At 13.8”x19.7”x6”, and only 
16kg, the LITE-U scanner is compact and 
lightweight, ideal for desktop applications. 
Livescan Touchscreen.  
TBD 
TBD 
TBD 
This option provides a touch screen to be added to 
the Livescan workstations.  
Livescan Upgrade to Full Hand (1000 DPI).  
TBD 
TBD 
TBD 
This future option is for 1,000 dpi full hand scanners.  
Mobile Devices.  
TBD 
TBD 
TBD 
This option provides provision of mobile terminals 
for police officers in the field and inventory and 
configuration management of a large set of mobile 
devices spread over the country.  
Move Services. 
TBD 
TBD 
TBD 
These optional services are for equipment moves 
requested by the Police Forces for bureaux 
equipment moves, Livescan equipment moves, and 
bureaux relocations.  
Mug Shot Database and Interface.  
TBD 
TBD 
TBD 
This option provides for the inclusion of mug shots 
into IDENT1 as an interface to an external mug shot 
database(s) or the inclusion to capture and store mug 
shots as a capability on IDENT1. 
 
Project IMPACT Support. 
TBD 
TBD 
TBD 
This option provides engineering services to assess, 
develop, and implement the identification linkages to 
the national intelligence system(s), the work 
associated with architectural and operational models 
within IMPACT to ensure such linkages are effective 
in terms of outcome, and the systems integration 
effort appropriate for these tasks. 
Voice over IP (VOIP). 
TBD 
TBD 
TBD 
This option provides the addition of a Voice over IP 
(VoIP) capability for a subset of IDENT1 users.  
 
Schedule E (Pricing) 
57 
Version 1.0 
FINAL 
 
18 July 2005 
 
RESTRICTED - COMMERCIAL