highlight report

Summary Care Record

Date: 24.04.09

Author: David Payne

Document Name: SCR Project Highlight Report

File Location: N:\Informatics\Informatics Programme Office\Summary Care Record Project\Project Control\Highlight Reports\2009-02-27

Period: 14.04.09 to 24.04.09 Summary

GENERAL STATUS:

  • Activity ongoing for the iSoft configuration to enable upload

  • The outline plan for the second wave has now been agreed

  • Escalations are ongoing to clarify the consent model with CfH

Amber

Period Overview

  • Urgent escalations have been ongoing to CfH to progress the iSoft upload work

  • Key iSoft documentation remains outstanding, specifically the hardware audit spec

  • Upload kick off meeting with the Parks Practice 20.04.09

  • CfH resource visiting the Parks Practice to talk through PDS Sync process, 20.04.09

  • We have been working with the First wave to progress version uploads, now confirmed by the Parks

  • Adastra kick off meeting held 15.04.09, general agreement on the project plan

  • Adastra costs have been presented and discussed at the Board. Awareness that local funding will be required ahead of CfH decisions on central funding. DP has drafted an options appraisal for NHS Medway decision on local funding

  • The escalations to CfH around the consent model and the CfH SEC action plan were discussed at the SHA Meeting 21.04.09. We now have a document detailing the use of synergy with the new consent model. Little progress has been made regarding:

  • Documenting fully the new consent model

  • Clarify the new communications toolkit availability

  • Revised Concept Training successfully delivered 23.04.09 (MedOCC attended)

  • High level Second Wave Plan has been agreed by the Board (17.04.09).

  • Second Wave key dates placed on the PRT

  • SPRINT order for second wave materials placed with CfH

  • Engagement with Second wave Practices has commenced, positive feedback and agreement from three practices so far received

  • Smart Card issue process progressing well at MedOCC

Amber

Next Period

  • Progress with iSoft upload preparation

  • Progress with detailed planning of the second wave, including a PID

  • Commence work required for PDS Synchronisation

  • Continue with MedOCC RA work

  • Resolve Adastra funding process

  • Draft new revision of the Communications Plan

Detail Breakdown

Budget Status

Budget - tbc

green

Work Package Status and Schedule Summary

Workpackages being developed for RA, HealthSpace Registration, iSoft, Communications

  • Hold.

  • Amber.

  • Red.

Amber

Problems / RISKS / Issues for Attention

Red flags for attention

  • The new consent model is not officially documented in detail by CfH, we do not

have the clarity required to engage locally with clear messages to clinicians.

Awaiting full response from escalation to CfH

  • The iSoft SCR build is based on the original consent model, this does not match

our new `assumed consent' model. Work arounds will be required. Awaiting full

response from escalation to CfH. We have received a document, but it does not

explain how the upload of supplementary data will be managed.

New Amber flags for attention

  • It is unclear how Adastra funding for MedOCC will be managed. No clear guidance has been given by CfH or the SHA. Adastra have provided a quote for the work but NHS Medway must proceed at risk if they are to pay for the work locally and meet project timescales.

Red

Completed Products

  • Project Brief approved

  • Project Board TOR's approved

  • Project timeline approved

  • Project Initiation Document approved

  • Readiness Gateway (PIP) approved

  • Patient Letter approved

  • Patient Opt Out Form approved

  • Media Briefing approved

  • Stakeholder Mailout approved

  • Resource and Financial Plan approved by SRO

  • JD for Engagement and Change Lead

  • First Wave Project Plan to Upload

  • High level Second Wave Plan

Green

Changes to Plan

No changes to current timeline

Green